通徑鉆孔 的英文怎麼說

中文拼音 [tōngjìngzhēnkǒng]
通徑鉆孔 英文
full gauge hole
  • : 通量詞(用於動作)
  • : Ⅰ名詞1 (狹窄的道路; 小路) footpath; path; track 2 (達到目的的方法) way; means 3 (直徑的簡稱...
  • : 鉆Ⅰ名詞1. (打眼用的工具) drill; auger 2. (指鉆石) diamond; jewel Ⅱ動詞(用尖物在另一物體上轉動) drill; bore
  1. Based on the construction of large diameter pile foundations at deep water riverbed without overburden for the shengmi bridge in nanchang, the construction difficulties and construction control key points involved in the method for bored pile construction with floating gantry are described

    摘要過對南昌生米大橋深水無覆蓋層大樁基施工實踐,介紹浮式龍門樁施工方法中的施工難點和控制重點。
  2. The same type of cement - soil mixing pile with concrete core, concrete pile and cement - soil pile that means they have the same pile length and pile diameter is deeply analyzed by finite element program. we get the q - s curve, the axis force of pile body curve, the stress of pile curve and the side and the end sharing load ratio of the pile curve by finite element program. with the help of the finite element program, the paper finds the relations between the pile ' s parameter and its bearing capacity and load transferring properties

    利用有限元計算分析了同比(樁長相同、樁相同)水泥土組合樁、水泥土攪拌樁和混凝土灌注樁,得到了它們的荷載沉降曲線、樁身應力曲線、樁身軸力曲線、樁側樁端分擔荷載曲線等,過這些曲線對它們的荷載傳遞規律以及變形特性進行了深入的分析。
  3. With the retrospection of the developing course of the bored pile foundation and combining with my practical experience, the paper expatiates upon the design principle of percent of fit of the stone - fill grouted concrete and the main factors of the influence strength target, and the final pile technique introduction of the hollow pile of the stone - fill grouted concrete and the precast prestressed concrete ; baesd on the theory of slurry hydraulics, empirical calculation formulas of the radis and height of diffuse slurry are deduced in this paper ; it analyzes the test pile materials of the hollow pile foundation, such as luoyang yi river bridge and dangwang jian river bridge ; the new technique of the hollow pile, which provides the generalization and application with base materials, expounds its feasibilities, adaptabilities and economy

    本文過綜合分析國內外樁基礎的發展歷程及研究現狀,重點討論了填石壓漿混凝土空心樁、預制預應力混凝土空心樁的成樁工藝、填石壓漿混凝土的配合比設計原理及影響強度指標的主要因素;根據泥漿水力學原理,導得了考慮各種因素的水泥漿液在預填骨料中的流動影響半和上升高度;結合河南省洛陽伊河大橋、黨灣澗河大橋工程實踐,討論了填石壓漿混凝土空心樁基礎的質量檢測方法及標準;並在此基礎上,深入分析了樁側、樁端承載能力,提出了填石壓漿混凝土空心樁的設計計算理論和方法。最後,論證了空心樁新工藝的可行性、適應性、經濟性,為大力推廣應用空心樁新技術提供了可靠的技術資料。
  4. In this paper, on the foundation of synthesizing engineering practice and study result of planted bar technique by chemistry glue on the domestic and international, embedded experiment study and theories analysis are done about bonded anchor behavior of chemistry planted bar anchorage behavior in this paper, the experimental results of 32 pulling resistance test ( meiya z3530 ) are given, considering some factors to affect bonded anchor behavior of chemistry planted bar such as the strength of concrete anchorage lengths diameter of steel bar and holes thickness of the protecting layer confecting circumstance of the hoop bar and quantity of construction especially which is very easy to be neglected and so on, and bonded anchor mechanism failure mode load carrying capacity and slide behavior are analyzed in - depth

    本文在綜合國內外化學膠植筋技術的工程實踐和研究成果的基礎上,對化學植筋的粘結錨固性能作了較深入的試驗研究和理論分析。文中過32個化學膠(美亞z3530 )植筋試件的拉拔試驗研究,考慮混凝土強度、錨固長度、鋼筋植筋、、保護層厚度、箍筋配製情況及施工質量等因素對植筋粘結性能的影響,特別是植筋的施工質量對粘結性能的影響是比較容易被忽視的因素,對化學植筋的粘結錨固機理、破壞形態、承載力及滑移性能作了比較深入的剖析。
  5. Observation of drilling cores and casting - sections and the characters of pore structures and permeability of the matrix of the lower - ordovician carbonate in comparing with the lower limit of a reservoir for matrix reveal that the porosity, permeability, maximum pore diameter, saturation and median throat diameter in the matrix with undeveloped fissures, holes and solution pores are far lower than those of a reservoir limit although some micro - pores are developed in the matrix which therefore has no capacity of storing and producing oil - gas

    摘要井巖心和鑄體薄片觀察,根據下奧陶統灰巖基質的滲特徵和隙結構特徵,並與基質作為儲層的下限對照裂隙、洞穴和溶蝕洞不發育的灰巖基質,發現盡管有微隙的發育,但其隙度、滲透率、最大喉半、飽和度、中值喉道半等參數值遠低於儲層下限值,基本不具備儲集和生產油氣的意義。
  6. To achieve the objective of protecting reservoir during drilling, the common means is to add proper graded temporary plugging materials, coupled with colloid filling particles in upper drilling fluid based on the average radius of pore throat in reservoir, which converts upper drilling fluid to reservoir protection fluid

    摘要在井過程中,為達到保護油層的目的,常根據油層的平均喉半,在上部井液中加人合適粒的暫堵劑,再配合膠體填充粒子將其改造為對油層具有保護作用的井液。
  7. It is stated systematically in the thesis the method ' s theories and measuring principle of all kinds of geostress determination technology. in particular the four methods recommended in 1987 by the committee of test method of the international society of rock mechanics, i. e. two over - coring methods of strain relief in boreholes, hydraulic fracturing method and stress furbish measurement which measures the surface stress

    本文較為系統地、全面地介紹了當前國內外用的各種地應力測量方法的理論、測量原理;特別就國際巖石力學學會試驗方法委員會於1987年推薦的4種地應力測定方法(變形測量法、壁應變測量法、水壓致裂法以及測量巖體表面應力的應力恢復測量法)作了較為詳細的敘述。
  8. The results show that the study on transimittivity can be done using the points along the circle arc centered at the roadway or the boring core, the transimittivity at the joints along the right angle ray can be studied using one single point behind the joint, and the studies on transimittivity can be done on any reasonable radius value of the roadway or boring core in a typical rock

    分析結果表明:單節理后各節點透射率的研究,可以過單節理后某一以巷道或中心為中心的圓弧上各節點的透射率來展開;射線角為90的射線上節理后各節點透射率的研究,可以過節理后某一節點的透射率來展開;單節理的透射率的研究可以在一個固定半值的巷道或的模型上用一種典型的巖石進行。
分享友人