通流能力 的英文怎麼說

中文拼音 [tōngliúnéng]
通流能力 英文
flow capacity
  • : 通量詞(用於動作)
  • : Ⅰ動1 (液體移動; 流動) flow 2 (移動不定) drift; move; wander 3 (流傳; 傳播) spread 4 (向壞...
  • : 能名詞(姓氏) a surname
  • : Ⅰ名1 (力量; 能力) power; strength; ability; capacity 2 [物理學] (改變物體運動狀態的作用) forc...
  • 能力 : ability; capacity; capability
  1. Based on discussing the influencial elements to capacity and delays of the controlled intersection junction, this paper analyzes how the flow of traffic to run at the controlled intersection junction, especially at stop line, at the point of conflict, and at the point of merging intersection. then using the way of l. c. edie, the stimulated model of the flow of traffic running is built up, and stimulated program is developed

    本文在討論影響信號交叉口和行車延誤的因素的基礎上,分析了車在信號交叉口特別是停車線處、交叉沖突場、匯交織場的運行情況,運用了伊迪理論建立了車運行模擬模型,開發了模擬軟體,在實際數據標定模型的基礎上,並用該軟體進行模擬試驗。
  2. The better advantage of high frequency induction in defining thin intercalated bed, discerning high - salinity low - resistivity oil ( gas ) reservoir, estimative of reservoir, estimating water - flooded reservoir and so on are found by analyzing the application of the many frequency induction logs in shengli oil filed

    過分析勝利油田多口井的高頻感應測井資料發現,高頻感應在劃分薄夾層、識別高礦化度低阻油(氣)層、定性確定儲層滲、評價水淹層等方面都有明顯的優越性。
  3. Some researchers have made study on this subject, such as the generation and evolution of frazil ice, shore ice, bottom ice, ice cover and ice jam, the resistance of freeze - up river, flow capacity and variation of water stage

    國內外一些學者過原型觀測,試驗和數值模擬的方法對水內冰,岸冰,底冰,冰蓋和冰塞的生成和演變,封凍河道的阻、過和水位變化等有關問題進行了研究。
  4. Through process agile design subsystem, enterprises " information share is intensified, and work mode is changed, and cooperation capability is enhanced

    過創建工藝敏捷設計子系統來促進企業各部門信息共享,改變企業的工作方式,增強相互的協作交
  5. To provide necessary data for design bypass pipe, an enlargement to bi liu river reservoir, the following problems have been studied by hydraulic model and theoretical analysis : the energy losses in water head of the bypass pipe system and of the flow - control valve and their scale effects, measurement and calculation of the discharge of the bypass pipe system during the bypass pipe system operation with and without the new water power station, the hydraulic characteristics of the water tunnel and draw - off pipe, the flow rate of the aqueduct bridge and the draw - off pipe and the water elevation of the flow in the aqueduct bridge during the old water power station operation with and without the new water power station

    大連市碧河水庫供水工程取水頭部由引水渡槽、節制閘、進水閘、泄水閘等建築物組成。由於本工程場地條件限制,增設旁管后布置非常緊湊,管道急轉角度大且轉彎距離較小,對于管內水態是否滿足要求,需要經過模型試驗進行論證,以確保工程的可靠性。旁管具有上水與泄水要求,對其過也要經試驗確定,為碧河水庫增建旁管設計提供依據。
  6. Foreign language : english, have passed cet4 and cet6 ; do well in oral english, can communicate with others naturally

    外語水平:英語,過國家四六級,口語良好,具備基本的口頭交
  7. Such, regarding the present and the future, the circulating capacity of no. 3 operating district has been one bottleneck in the supply chain of wisco

    三區碼頭的已成為武鋼生產體系的一大瓶頸,改進三區庫場管理,建立電腦化的庫場智管理系統,提高庫場利用率已勢在必行。
  8. By the means of paper - investigation and visiting, we find this kind of teaching manner ( inquiring study is effective for bettering students " interest and ability ( including their ability for exploring, cooperating and communicating. )

    過問卷調查和訪談后發現,探究性學習對學生的學習興趣、學習(包括探究和合作與交等)的發展有一定的效果。
  9. At the beginning of the paper, a literature review on the domestic and abroad researches of container terminal logistics system is provided introducing some computer simulating model technology apply case on container terminal logistics system on the domestic and abroad ; secondly this article introduce the element and characteristics of container terminal operation system, specially operation flow, controlling principle ( including gate testing principle, ship controlling principle, quay operating principle, yard i / o operating principle, yard running system ), followed by quality evaluating index and empiristic formulas of container terminal. at last, the paper introduces the basic components, layout, loading and unloading process flow of tian jin container terminals, evaluates the related performance parameters and at last introduces some related empiristic formulas based on the historical data of an actual terminal

    本文首先回顧了國內外集裝箱碼頭物系統的研究動態,介紹了國內外計算機模擬技術在集裝箱碼頭物系統模擬中的應用情況,然後介紹了集裝箱碼頭作業系統的組成和特點,以及其裝卸工藝、作業程、操作原則(包括大門檢查箱作業原則、船舶調度管理原則、碼頭前沿操作原則、堆場存取箱作業管理原則、堆場管理系統) ,接著介紹集裝箱碼頭系統的性評價指標和碼頭經驗公式及出入口車道數計算,並結合天津港集裝箱碼頭物系統的特點,系統地介紹了天津港集裝箱碼頭的基本組成、布局、裝卸工藝、作業程后,評估了集裝箱碼頭物系統的相關性指標,並結合實際碼頭的歷史數據,介紹一些相關的經驗公式。
  10. Because of the high flow resistance and the poor flowing ability, the spool valves ca n ' t meet the requirements for high velocity or huge hydraulic equipment

    同時由於滑閥動阻大,通流能力小,不滿足高速或大型液壓設備對量的要求。
  11. The main work is done with the help of model experiment. in the flood - relief experiment, the flood carrying capacity of spillway tunnel is checked. in the hydraulic experiment of the diversion power conduit system, the followings are studied : the flow condition and fluctuation in the surge chamber, the distribution of flow velocity before the rack in the surge shaft, the amplitude of stage in the quick gate bay etc. the test step, content and results of different proposals are introduced in details

    本項優化試驗研究的目的主要在於,過泄洪系統整體水學試驗,校核泄洪洞的泄過發電引水系統整體水學試驗,研究調壓井內水態和水位波動情況、調壓井內攔污柵前速分佈情況;確定快速閘門井內水位波動幅度;試驗確定壓管道水擊壓穿井系數以及泄洪洞弧形門處的水壓
  12. The paper analyzes the non - lineal relations of the quantity of heat exchange and water flux of coil exchanger in part - load operating condition, the shortage of deciding the water flux in bypass pipe, the disadvantage that the operating condition of pumps and chiller ca n ' t be met with the load change of the air conditioning system in different operating condition of using pressure - difference bypassing control in primary water pump system. using load control method in the change of the operating condition of primary water pump system can realize that the load change is small and reasonable in the on / off condition of pumps and m m chiller by comparing load control method in primary variable - flow water pump system with pressure - difference bypassing control method, back water temperature control method

    本論文從目前空調工程中使用的變量水系統入手,研究了盤管換熱器在部分負荷下水量與換熱量的非線性關系,分析了文獻中介紹的旁通流能力選擇的不足之處和一次泵水系統採用壓差旁控制時,工況轉換不滿足系統控制要求的缺陷;比較了一次泵變量水系統中壓差旁控製法、回水溫度控製法、負荷控製法的精確性,並得出了在一次泵水系統的工況轉換時,採用負荷控製法使冷水機組及其相應水泵在啟停時的負荷變化范圍較小,更符合建築物的冷量需求,節效果較好的結論。
  13. Abstract : using a series of model tests, the properties of discharge capacity in the closed conduit due to inflow in gate shaft is studied and a method for estimating reducing discharge capacity is provided to designers

    文摘:過系統模型試驗,研究了泄水道因進口閘門井進水減小泄的特性,並提出了估算方法,可供設計應用。
  14. The first part. task analyse of handling technology design. is explain the place, basic establishments entironment of yangshan port and the conditions basic tenet and technical parameter of design. the second part, project study out. is discuss the design contents the choice of the leading and the assistant engine, the form of the handling mechanisation system, project study out. the third part, size design, is count the berth pass capacity, the amount of handling engine, the area and capacity of yard, road and gate, the worker amount. the fourth part. technology and economy argumentation, commendable project confirm, is confirm the commendable project by technology and economy argumentation. in the end, considering the technology, economy and use. discourse commend the project of rubber - tyred gantry crane. at present. centre government is studying yangshan project, but in handling technology part of container terminal, the design is simply. so this discourse has important consult value. and has important value of economy and community too

    第一部分的裝卸工藝設計任務分析主要就洋山港區的地理位置、基礎設施、自然環境,設計前提條件,設計原則以及設計主要技術參數進行說明;第二部分的裝卸工藝方案擬定主要就工藝設計的主要內容,主要機械及輔助機械選擇,裝卸機械化系統組成以及工藝設計方案擬定進行論述;第三部分的裝卸工藝方案規模設計主要就泊位,裝卸機械臺數,堆場面積及堆存,道路及大門,司機及工人人數,工藝程進行計算分析;第四部分的技術經濟論證及推薦方案確定主要就技術、經濟指標進行對比論證,並在此基礎上確定推薦方案。
  15. The essay analyzes the differences of calculation methods of passing capacity between existing lines and passenger dedicated lines, explores the relationship between length of passenger flow section of passenger dedicated line and passing capacity, redefines the standard train for discount coefficient, and analyzes the change tendency on average discount coefficients of medium speed train and the high - speed stop trains versus high - speed non - stop trains, and the change tendency on train proportion of different high - speed stop trains and the passing capacity of high - speed train in passenger flow section is also provided

    摘要分析了客運專線計算與既有鐵路的不同之處,探討了客運專線客區段長度與之間的關系;重新選定了扣除標準列車,分析計算了中速列車和高速停站列車相對于高速直達列車平均扣除系數的變化趨勢,以及不同高速停站列車比例變化時,客區段高速列車的變化趨勢。
  16. Aghput of the mineral terminals is 7, 000. 000 tons and that of the finished - product terminals is 1, 600, 000 tons. now the port has loaded to capacity to meet the need of production. furthermore, there are many problems that the handling technology does not form a set, the capacity of warehouse can not meet the need and the management of the source of goods and producing is not harmonious

    過對武鋼工業港現有物系統的碼頭泊位、堆場、裝卸機械和集疏運等環節的測算和綜合分析,可得工業港現有礦石碼頭的綜合約為700萬噸,成品碼頭的綜合約為160萬噸。
  17. Capacity of multi - turning - types traffic flow crossing major lanes

    多轉向多車型車過主路的
  18. Minor lane capacity of mixed traffic flow under major stream with m3 distributed headway

    3分佈下支路混合車
  19. Different groups of fractures are vertically connected in ladder shape and form the fracture net, which improve the permeability of the formations and makes the formations good fracture - pore style reservoirs

    不同組系的構造縫縱向上呈階梯連,形成空間裂縫網路,極大地改善了侏羅系砂巖儲層的滲,使其成為較好的裂縫?孔隙型儲層。
  20. To improve the flow pattern and discharge capacity of the spillway of bashan hydropower station, the left guide wall ' s form of the spillway ' s entrance channel is optimized by series of model tests

    摘要為改善巴山水電站溢洪道進水渠態、提高泄過一系列試驗優化了溢洪道引水渠左導墻頭部曲線型式。
分享友人