造斜面 的英文怎麼說

中文拼音 [zàoxiémiàn]
造斜面 英文
deflecting surface
  • : Ⅰ動詞1 (做; 製作) make; build; create; produce 2 (假編) cook up; fabricate; concoct 3 [書面語...
  • : 形容詞(跟平面或直線既不平行也不垂直的) oblique; slanting; skew; bevel; diagonal; askew; inclined; tilted
  • : Ⅰ名詞1 (頭的前部; 臉) face 2 (物體的表面) surface; top 3 (外露的一層或正面) outside; the ri...
  1. Stability of rock slopes is generally controlled by the structure of rock masses, especially the soft structure surfaces. analysis of rock mass structures is a key to establish geological models and numerical simulation and a foundation to assess the stability of rock slopes. the weak structure surfaces are mainly bedding planes, faults, joints, schistosity plane and contact zones of intrusive bodies. since they are different in genesis and scale, the rock masses are different in features and mechanical intensities. based on the combination of rock structure bodies, 15 basic modes of deformation and failure of rock slope are systematically summarized. the deformation and failure of rock masses actually result from the recombination and rearrangement of these rock bodies. there are 11 types of rock mass structures and various deformation and failure of bank slopes are present in the reservoir area of the three gorge project

    巖體結構,特別是軟弱結構對基巖坡變形與破壞具有顯著的控製作用,巖體結構模式分析是建立坡地質模型和數學模型的關鍵和評價坡穩定性的基礎。巖層層斷裂構節理裂隙片理與劈理以及侵入體和圍巖的接觸帶等是控制基巖坡穩定的軟弱結構,這些成因不同大小不一的結構將巖體分割成性質各異力學強度不均的各種巖體結構體,構成了15種基巖坡變形破壞的巖體結構基本模式。不同結構體的重新組合與排列是坡失穩的內在原因。
  2. At the end of the corridor was the dressing room belonging to clarisse and simonne. it was a long, ill - built room under the roof with a garret ceiling and sloping walls

    克拉利瑟和西蒙娜的化妝室在走廊的一端,這間屋子狹長,得很粗糙,在屋頂下,墻角傾,墻上有裂縫。
  3. The author suggests that the three lithosphere - scale faults, lancangjiang fault, jinshanjiang - ailaoshan fault and axis fault in the middle of the basin, are the main geological structures that control the formation of basin, magmatism and metallogenic congregate district. the anticline structure with an axis of triassic strata and the related fault system within the basin, and gonglang arch - shaped folding structure in the south of the basin are the geological structure controlling the formation of ore fields. junctions of two or more faults with different orientation, interlayer cataclastic structural zone and oxidation - reduction ( redox ) boundary were the favorable position for the formation of ore bodies

    認為瀾滄江斷裂、金沙江-哀牢山斷裂及盆地中軸斷裂這三條巖石圈斷裂是主要的控盆-控巖(巖漿巖)構及礦集區尺度的控礦構;盆地中以三疊系為軸的背及相關的斷裂系統、盆地西南緣公郎弧形構等是礦田尺度的控礦構;多組斷裂的交叉、層間破碎帶及地層柱中的氧化還原界是形成礦體的有利部位。
  4. The corbel ' s dimension should be ascertained as the manipulative condition of diagonal section. the amount of longitudinal reinforcement be ascertained on the basis of the flexure model, is obtained according to static for balance condition, the calculative expression of the load is obtained. and in terms of the design method in ultimate state the maximum load

    我國規范對于牛腿的設計規定,牛腿尺寸的確定以抗裂作為控制條件,縱筋用量的確定以彎壓破壞模型為基礎,根據靜力平衡條件得到承載力的計算公式,按照極限狀態設計方法計算得到,箍筋用量則按照構要求確定。
  5. As one kind of key equipment in piping work of large - scale turbo - generator set in power plant, the machine is especially applicable to various welding bevels, flat end and angle of outer & inner diameter of ascending pipe, elbow pipe, bend, flange and etc., which greatly meets demands in pipe processing of construction site and manufacturers

    本機床是電站大型汽輪發電機組的管道施工的關鍵設備,對直管、彎管、彎頭、法蘭等管體的各種型式焊接坡口,端平,內外徑過緩度及直口,能滿足施工現場和製廠家對各種管件的加工要求。
  6. Due to slope cable bears barely alternative load longtime in nature environment, it is easy to corrosion and wreck. seriously, the bridge is possibility to collapse in strictness air empoison, water pollution, seashore and ocean surroundings. therefore, to study cable ’ s corrosion widely and to inhibit corrosion process are very important for increase endurance and safety of bridge construction

    由於拉索長期承受交變載荷並暴露于自然環境中,特別是大氣污染嚴重地區、水污染嚴重地區、海濱及海洋環境,極易發生腐蝕破壞,嚴重者還會因坍塌而成生命及財產的巨大損失,因此,全研究橋梁拉索的腐蝕,阻斷腐蝕的成因,對提高橋梁結構的耐久性與安全性具有重要意義。
  7. All planar structures are represented by a strike line and dip angle.

    一切狀構均可用向線和傾角來表示。
  8. The downhole hydrodynamic propulsor has yet to be improved since it has some limitations in operation

    但在井型的適應范圍和小曲率井的施工等方,推進器的使用還存在一定的局限性,有待進一步完善和發展。
  9. The accumulation and transportation of moist available potential energy and the release of the condensation heat offer the material condition for this heavy rainfall. under the condition of the air ' s movement through the stiff moist isentropic surfaces, the development of vertical vorticity of mesoscale low vortex system is accelerated due to the slantwise vorticity development, and to form stronger convective system, so as to result in heavy storm rainfall

    濕有效能量的積聚和輸送為強降水的發生、發展提供了充分的物質條件;由於沿陡立等熵的空氣上滑運動,因傾渦度發展成了中尺度低渦系統垂直渦度迅速增加,促進了低渦的快速加強,形成強對流系統,導致強暴雨過程的發生。
  10. The project is 156 m dam height, 877 m normal impounded level and 760 mw installed capacity. minjiang river benches almost conversely in shajinba reach and makes the right bank a thin and weak ridge, which is a syncline geological structure

    岷江在沙金壩河段形成一個近180的河曲,使右岸形成三被河曲圍抱的條形山脊,構上為一完整沙金壩向,工程區水工建築物都布置在右岸山脊內。
  11. Cbm is easy to escape over the neutral plane where shows tensile stress in antiform ; cbm accumulates under the neutral plane

    中和以上表現為拉張應力,煤層氣容易逸散,中和以下煤層甲烷聚集。
  12. There are lots of primary structures, such as bed interfaces, lagerklufts and diagonal joints, in the emeishan volcanic, which dislocated to be dislocation interfaces later. especially in those primary structures that were filled with the epidote - quartz vein, the dislocation interfaces are more aptter to grew

    錯動帶主要是利用玄武巖中原生層、層節理和節理等原生構錯動變形而成,尤其是當原生構中充填有熱液型綠簾石?石英脈時,錯動變形更易於發生。
  13. By means of stress - strain feature of upper and lower strata of fold neutral plane in the course of longitudinal fold formation, the differences between the upper coal bed and lower coal bed of fold neutral plane are analyzed from the coal thickness, coal structure, coal body structure, coalbed gas occurrence and diversities etc., revealing the cause of these appearances

    摘要利用縱彎褶皺變形中中和上下巖層的不同應力與應變特點,分析了處于褶皺中和上下各煤層在背與向部位煤層厚度、煤層構、煤體結構及煤層瓦斯的賦存規律與差異性,揭示了這些現象產生的原因。
  14. All of the hydraulic structures are arranged in the right bank and four underground seepage tunnels are arranged parallel in horizon, and the axle wires intersect with syncline axis almost perpendicularity, and with rock formation obtusely. complex underground tunnels are formed under such formidable conditions, and each of seepage tunnels crosses nuclear of syncline and comes up against interlaminar sharing disturbed belt at different footage

    四條引水發電隧洞在平上平行布置,軸線方向與本區構線方向近於垂直,與巖層走向大角度相交,構成一復雜地下洞室群,並在不同洞段通過沙金壩向核部,且遭遇多條層間剪切錯動帶。
  15. Based on the analysis and processing of the digital speckle pattern, the translation and rotation invariant features are discovered, and a one - step feed - forward neural network is creatively proposed which makes it possible to realize the intelligent recognition of interface defects

    通過對數學散斑條紋的分析與處理,找出了能代表條紋信息的移位不變與旋轉不變特徵值? ?最大率,進而構一種新的網路模型,即單步前饋式三層網路系統.率先實現了把神經網路系統用在數字散斑無損檢測之中,完成了神經網路系統對粘接界缺陷的智能辨識
  16. The sidetrack technical keys in ultra - deep well such as engineering design, selection of the kop, field operation and drilling parameters are discussed as well as the field operation rules, which can be beneficial to sidetracking operations in ultra - deep wells as reference

    從工程設計、點的選擇、現場施工、鉆井參數等方討論了超深側鉆井的技術要點以及現場施工的規律,對于超深井側鉆施工具有一定的借鑒意義。
  17. D claration abandons itself to the slender transparency of its bevelled glass bottle

    型的玻璃香水瓶,晶瑩透明、修長勻稱。
  18. Since the fault zone had been activated in the later paleozoic, it controlled the evolution of magmatism and metallization belt in taihang mountains. our field workspace is in the northern part of taihang mountains, which is the diagonal area of two main faults

    太行山北段是紫荊關斷裂帶兩主斷裂列重疊部位,通過對該區作詳細的野外斷裂構觀測,比較詳盡地收集了斷裂帶構組合資料及構巖標本。
  19. Drilling track is key factor which decide trenchless success or failure, but controlling drilling track stay around rectifyed phase at the present. guided the theory of force is the key affectting the drilling track, the paper discuss primary factors on contralling drilling track, and advance the formulary ahout reckoning deviation force and azimuth force, expect to achieve the aim that drilling track were controled real time and be anticipated, and have the initiative on drilling track contaolling

    巖層鉆進軌跡是決定非開挖成敗的關鍵因素,目前對鉆孔軌跡的控制僅僅停留在被打糾偏層上,本文在力是影響鉆進軌跡本質因素理論指導下,對影響巖層鉆進軌跡控制的因素進行了理論探討,並針對力和變方位力提出了計算模式,希望最終能實現鉆孔軌跡的實時監控與調整,變被打糾偏為主動鉆進。
  20. In some makes of engine the helically splined coupling is not used and the angular displacement of the shafts is effected by centrifugally actuated devices of the swinging link or inclined plane type

    在一些發動機的製中,並不使用螺旋式花鍵套管,通過搖桿或型的偏心操縱裝置,曲軸相位角起到同樣作用
分享友人