連接夾板 的英文怎麼說

中文拼音 [liánjiējiābǎn]
連接夾板 英文
connecting cleat
  • : Ⅰ動詞1 (連接) link; join; connect 2 (連累) involve (in trouble); implicate 3 [方言] (縫) ...
  • : Ⅰ動詞1 (靠近;接觸) come into contact with; come close to 2 (連接; 使連接) connect; join; put ...
  • : 夾構詞成分。
  • : Ⅰ名詞1 (片狀硬物體) board; plank; plate 2 (專指店鋪的門板) shutter 3 [音樂] (打拍子的樂器) ...
  • 連接 : connect; fit together; link; marry; mate; joint; association trail; linkage; concatenate; concate...
  1. The main components of the latter are multi - rib sandwich panels, including floor slabs and wall slabs. reinforced concrete conformation columns are set where the longitudinal walls and latitudinal walls intersect and copulative beams are set where floor slabs and wall slabs intersect. they play a role of linking and transferring loads, bearing a small part of loads at the same time

    無骨架體系的主要承重構件是密肋(包括樓和墻) ,縱、橫墻相交處設鋼筋混凝土構造()柱,墻和樓相交處設系(圈)梁,系梁和柱主要起和傳遞荷載作用,也承擔少部分荷載。
  2. The sentry box of the activity fully use internal wall panel and one s own intensity of the roof boarding, through draw nail, bolt, connection nailed to make up finalize the design the prefab system. construction swift, being portable, especially suitable for urban municipal administration, entrance guard room, service department, etc

    活動崗亭是通過充分利用芯墻及屋面的自身強度,通過拉釘螺栓自攻釘將鋼結構底座墻面和屋面組成的房屋系統。
  3. Activity enclosure adopts steel construction, two - sided internal wall panel or single lamination type color wall panel pass bolted joint. all its parts are formed by standard component, assemble wantonly at the scene, fixing cycle short, the color can be as requested especially made. repeatable disassembly and assembly, without building rubbish, the appearance is beautiful

    活動圍墻採用鋼結構柱,雙面芯彩鋼或單層壓型彩鋼通過螺栓而成。其全部部件均由標準件構成,現場任意拼裝,安裝周期短效果好,顏色可根據要求特別製作。可重復拆裝使用,無建築垃圾,外觀靚麗。
  4. This paper applies nonlinear finite element program bsnfem to analyze the behaviors of eccentrically braced steel frames under cyclic load. the study that comprehensive and systematic analyze the factor of links length, thickness of links flange, distance of links rib, thickness of links rib and angle of brace to be changed affect energy - dissipation capacity of d shape and k shape eccentrically braced steel frames have been some studied before. this paper fills the black in the filed factor of high - span ratio, brace stiffness and brace - to - beam connections to be changed affect energy - dissipation capacity of d shape and k shape eccentrically braced steel trames and any factor to be changed affect energy - dissipation capacity of y shape eccentrically braced steel frames

    對耗能梁段的長度、耗能梁段腹的厚度、耗能梁段翼緣的厚度、耗能梁段加勁肋的間距、耗能梁段加勁肋的厚度、支撐的角等因素的改變對d形、 k形偏心支撐鋼框架耗能的影響,前人已有一些研究,本文對這些因素的影響進行了全面系統的分析,完善了理論分析的不足;而結構高跨比、支撐剛度、支撐與梁的形式等因素對d形、 k形偏心支撐鋼框架破壞機理的研究以及各種因素對y形偏心支撐鋼框架破壞機理的影響,則很少有人涉及,本文對此也進行了深入系統的分析,填補了這一研究空白。
  5. Homeproductseven roof flat roof fully use internal wall panel and one s own intensity of the roof boarding, through draw nail, bolt, connection nailed to make

    是通過充分利用芯墻及屋面的自身強度,經過拉釘螺栓自攻釘的而組成的定型活動房屋系統。
  6. Through acoustic coupling of the transducer and the elastic plate, energy is transferred to the metallic plate, thus, the metallic plate ’ s flexural vibrating mode comes into being and driving force is produced by the legs ’ rectilinear motion

    該馬達振子由心式換能器和加工有齒的金屬薄而成。心式換能器激勵金屬薄產生彎曲模態的振動,從而通過作斜線軌跡振動的齒產生驅動力。
  7. By use of the stress free conditions on crack and the continuity conditions of stress and displacement on ideal bonded material interface, the stress field of an bi - material infinite plate with an elliptical inclusion and a deminfinite interface crack are given on the base of the complex potentials solutions obtained above. and the corresponding stress intensity factor k is given

    在該復勢解的基礎上,根據裂紋表面的零應力條件和理想粘界面上的位移和應力續條件,通過求解hilbert問題,得到了含有雜和半無限界面裂紋的無限大的應力場,並由此給出了裂尖的應力強度因子k 。
  8. The emphasis is placed on the connection features between the main components, in accordance with the basic principles and requirements, which demand that the integrality of the structure and the safety for loads transfer be ensured

    介紹了建築體系的結構組成、主要構件的構造特點,結合結構構造設計的一般原則與要求?保證結構整體性和荷載傳遞可靠性,重點闡述了主要構件間的構造特點。
  9. To enable or disable connection pooling, open odbc data source administrator in the administrative tools folder of control panel

    要啟用或禁用池,在「控制面」的「管理工具」文件中打開「 odbc數據源管理器」 。
分享友人