連接支柱 的英文怎麼說

中文拼音 [liánjiēzhīzhù]
連接支柱 英文
connecting struts
  • : Ⅰ動詞1 (連接) link; join; connect 2 (連累) involve (in trouble); implicate 3 [方言] (縫) ...
  • : Ⅰ動詞1 (靠近;接觸) come into contact with; come close to 2 (連接; 使連接) connect; join; put ...
  • : Ⅰ名詞1 (分支; 支派) branch; offshoot 2 (地支) the twelve earthly branches3 (姓氏) a surname...
  • 連接 : connect; fit together; link; marry; mate; joint; association trail; linkage; concatenate; concate...
  • 支柱 : pillar; support; prop; mainstay; sustentaculum; stull; brace; crutch abut strut; raker; shore; ma...
  1. Based on extensive investigation of construction technique history of chinese ancient buildings, the structure method, structure developing history and seismic behavior of chinese ancient timber structure buildings are analyzed in several respects of the structural system and form. through a series of experiments on constituent parts of chinese ancient timber building structure, including the tests on the corbels and brackets called dougong subjected to low cyclic reversed loadings, the tests on the wooden frame using the tenon - mortise joints as connections of column and beam subjected to low cyclic reversed loadings, the tests on vibration isolation effect of friction and slippage between column footing and their socle base, and a series of shaking table tests on a chinese ancient timber structure palace building mode under artificial earthquake at serving conditions, destroyed conditions and reinforced conditions, many valuable results of structures such as moment - curvature hysteretic loops of dougong structure and tenon - mortise joints under low cyckc reversed loadings, the static function, the seismic performance, energy dissipation, vibration reduction, energy - loss mechanism, nechanicalmode and failure mode were studied. aplenty of valuable parameters of the structure system were obtained, such as the natural period of structure, vibration modes, damping ratio, factor of vibration isolation, oscillate amplitude of ineitial accebration, velocity and displacement, magnitude of slippage, and the mechanism of structure failure and collapse etc. based on these research, the complete analysis of ancient timber structure under earthquake were carried out in which including mechanism analysis method, calculating mode, strength analysis of members and joints, strengthening methods for serving damaged ancient timber structure buildings were also taken into account

    依照宋代《營造法式》建造了抬梁式殿堂木結構構件及結構模型,對中國古代木結構中的典型構造如:腳在礎石頂面平擱簡架榫卯高不越間之廣、側腳、生起、斗拱等的構造機理及結構功能進行了量化分析和實驗研究: (一)通過木石礎靜摩擦試驗,測定了腳與石礎古鏡面間的摩擦系數及摩擦力隨上部結構荷載變化的規律; (二)通過單承載力試驗,測定了古建築中木的受力變形特徵、破壞模式、及模型材料的變形模量、極限承載力、極限變形等參量; (三)通過架低周反復荷載試驗,測定了架的抗側移剛度、架恢復力特性及滯回曲線、榫卯張角剛度及其變化規律、架及榫卯的極限承載力和極限變形、及榫卯減振參數; (四)通過斗?低周反復荷載試驗和受壓試驗,測定了古建築木構件與木構件間摩擦系數,斗?抗側移剛度,斗?恢復力特性及滯回曲線,斗?抗壓極限承載力及受力變形規律; (五)通過抬梁式殿堂間架模型振動臺試驗,測定了殿堂木構架結構自振周期,地震反應振形、阻尼特性及阻尼比;按結構分層特點對腳、頭和斗?層上的屋蓋的地震反應採用多點同步測量,對根滑移、榫卯變形、斗?的變形、復位、耗能減振參數等進行了定量分析。
  2. Holder outlines and pin connections for quartz crystal units

    石英晶體元件的引線和插腳
  3. With the rapid development in chinese economy, the steel structure and thin - walled colded - formed steel structures have been widely used in building constructions. the colded - formed angle members are one of important member in steel structures and are widely used in transmission towers, trusses and bracing members by its easy connection and erection

    隨著我國經濟的飛速發展,鋼結構冷彎薄壁型鋼結構在建築中應用越來越多,冷成型角鋼構件是鋼結構中的一類重要構件,它具有易安裝和方便的優點廣泛應用於塔結構、格構、桁架結構及撐等結構。
  4. Mine support ; head for single props ; connecting dimensions

    礦井護.單用頂板.尺寸
  5. The r esults of calculation and analysis indicate : the bracing effect from wallboard increases the load capacity of wall stud by 1. 6 - 1. 8 times ; the reasonable distance between fasteners of wall stud is l / 8, l is the length of wall stud ; there is no necessity to considering bracing effect from wallboard in the direction of perpendicular to wallboard

    分析結果表明:考慮承效應后,墻體立的承載能力比原來提高了1 . 6 1 . 8倍:立墻板件間距取s = l / 8較為合理, l為立的長度;可不考慮墻板對立沿垂直墻面方向提供的承效應。
  6. Attach each leg to the bottom of the enclosure using the three nuts, bolts, and washers provided for each leg. tighten bolts securely

    將每個聯結到外殼底部,對于每個,採用三套螺母、螺栓和墊圈與外殼進行。小心緊固螺栓。
  7. According to the structural characteristic of equipments a nd t he c ondition o f r unning e quipments, t he factors t hat i nfluence t he seismic capability of equipments would include bushings, flanges jointing bushings, bracket, dampers, cables, and so on

    根據電瓷型高壓電氣設備的結構特徵以及設備在運行時的狀態可知,影響設備抗震性能的因素主要包括:瓷、瓷之間的法蘭、設備架、設備的減震和隔震裝置、設備之間的導線等。
  8. It is made ofalu structures and water proof covers

    由鋁合金件及防水帆布組成。
  9. The damper with concrete ductility column is composed of multiple ductility columns including single, double and generally 3 ~ 5 and up - down rigid mount. the height - ductility column is the concrete column, that height is 1 / 3 of the floor height. the up - down rigid mount connects rigidly multiple ductility columns. the damper sets the first floor of the soft first - storey structure or the layer - floor of the high - rise building, used deformation scale effect to consume more seismic energy

    混凝土延性耗能器由多根(含單根、雙根,一般為3 5根)高度約為層高1 / 3的混凝土延性和上下剛性座(將多根剛性在一起)組成,設置於底層柔性結構的底層或高層結構的層間,利用變形放大效應消耗更多的地震能量。
  10. Mechanical transmissions. concentric assemblies on cylindrical carried with intermediate bush with conical external surface. calculation

    固定環。在帶有錐形外表面的中間套簡的園承面上。計算。
  11. Construction works for the 4. 4km tin shui wai light rail extensions are now taking place at the junction of tin wah road and tin shui road. the contractor is carrying out piling works for the light rail viaducts and building an elevated light rail stop that will link the stop with nearby housing estates and shopping malls. at other sections of the extensions, the contractor is working on the surcharge

    4公里的天水圍新線工程,現時工程主要集中在天華路天瑞路交匯處,承建商正興建架空橋的樁,該處將設置一個架空車站,鄰近的屋?及商場,至於其他路段,現時主要是進行壓土工程。
  12. Rigid triple tie rod connections between injection unit and locking mechanism enables maximum transmission of shot force and accurate alignment throughout the injection process

    壓射系統裝置以三條拉桿于鎖模架的架上,壓射力能透徹傳遞,且其剛性能保持機構成一線。
  13. Putting on their gloves all set to work in a row in front of the press, an erection formed of two posts connected by a cross - beam, under which the sheaves to be drawn from were laid ears outward, the beam being pegged down by pins in the uprights, and lowered as the sheaves diminished

    她們戴上手套,在機器的前面站成一排,就開始工作了。機器是由兩條腿撐起來的架子,兩條腿中間用一個橫梁起來,下面放著一束束麥草,麥穗朝外,橫梁用銷子釘在子上,隨著麥束越來越少,橫梁也就越降越低。
  14. A beam or a column often supports other members which participate in the buckling action, and significantly influence its in - plane stability and out - of - plane stability. if these elastic restraints action of buckling resistance is taken into account the critical loads of steel members may apparentely been increased and plenty of steel material is saved

    梁或為其的其他構件提供撐,同時,與梁或的構件也為梁或提供約束作用。這些約束作用極大地影響著梁或的平面內穩定和平面外穩定。利用構件之間約束作用,鋼構件的穩定臨界荷載可以得到顯著的提高,節約大量的鋼材。
  15. The tower shafts, most of which are hollow and varying in cross section, and altitudinal construction bring trouble to the form work and the stress of strand wire. and the cracks on the crossbeams will be caused by the following - deformation of the bracing structure joints, elastic deformation , uneven settlement and temperature changes. the additional stress of the base slab and the foundation is caused by the deviation of cable bent tower construction

    但大跨度橋梁混凝土索塔施工設備進場及現場管理都比較困難;塔多為空心變截面,且為高空作業,給模板工程及預應力張拉帶來一定困難;撐系統的間隙變形、彈性變形、不均勻沉降以及環境溫差可導致橫梁裂縫;索塔施工偏位會引起的承臺和基礎的附加應力,對加勁梁的架設影響大;懸吊結構未完體系(架設時)施工階段的風致振動往往影響到施工的安全和質量;實心塔部分體積較大,易產生溫度裂縫。
分享友人