連結桿 的英文怎麼說

中文拼音 [liánjiēgǎn]
連結桿 英文
connecting lever
  • : Ⅰ動詞1 (連接) link; join; connect 2 (連累) involve (in trouble); implicate 3 [方言] (縫) ...
  • : 結動詞(長出果實或種子) bear (fruit); form (seed)
  • : 桿名詞(桿子) pole; staff
  • 連結 : concatenate; joining-up copulation; structural connection; junction; anastomose; attachment; bond
  1. Based on vc and opengl software platform, as a part of integrate planar mechanism analysis and simulation cai, the mechanism theory has been adopted to analysis the movement trace and profile of linkage ; adopt oriented object method to capsulate the class module. each corresponding class module complete parameter storage and process ; adopt message - map, message - trigger to organize the programming and response the user " s input ; use the document - view structure of the visual vc + + mfc class foundation as the basis of the programming architecture to complete those functions. use oriented object method to product the following class module : control class, render class, document class, mechanism class and other classes ; adopt opengl library to draw the three dimensional graph based on the result of mechanism analysis ; use model transforming, lighting, material, color, frame - buffer, display - list, graphics - component combine etc to draw the three - dimension mechanism and make the simulation of linkage has high reality

    本文敘述了平面機構運動分析和可視化模擬的理論演算法及其編程實現方法,基於微機vc平臺,採用opengl圖形庫編程,利用面向對象的方法對機構進行功能封裝,利用vc + +的文檔視構作為最基本的窗架,生成並控制三維繪制類、文檔類、主窗口類和一些輔助類,利用windows平臺的消息映射、事件驅動來組織程序運行和響應用戶反饋,利用機構分析得出坐標數據驅動opengl庫繪制三維機構圖形。
  2. In this paper, first strand cdna of 3abc gene was synthesized using template rna extracted from cells infected with fmdv. the complete 3abc gene about isoobp was amplified by pcr and ligated into pgem - t easy vector. after transforming e. coli dh5 a, ampicillin resistant colonies were isolated and plasmid dna was prepared and analyzed by restriction analysis and pcr. presence of the full length 3abc gene was verified by nucleotide sequence analysis and the plasmid containing the expected sequence was named as pgem - 3abc. comparing the aquired sequence of 3abc with that of reference strains, the homology is more than 99 percent. the pgem - 3abc was digested with sal i and bgl ii and ligated into xho i and bgl ii - digested expression vector ptriex - 4 neo. lt was identified by restriction analysis and pcr and sequencing that this fragment had a 17bp deletion hi the nucleotide sequence 708bp of 3abc gene, which happened to form a terminator codon behind 3ab gene, but it contained the complete open reading frame ( orf ) of 3ab gene. positive clones were selected and induced with lmmol / l isopropyl - d - galactoside ( iptg ), bacteria were detected by sds - page and western blotting after properly treated. the results showed that the 3ab gene expressed successfully in e. coli and 33. 5ku fusion protein can be recognized by the positive bovine serum of fmdv. the amount of target protein is over 26 % of the total bacteria protein by gel thin layer scanning analysis

    擴增產物接到pgem - teasy載體中,轉化大腸菌dh5菌株,篩選氨芐青霉素抗性菌落,提取質粒經酶切鑒定、 pcr分析以及確證性測序證明,所克隆的1500bp左右的片段含有完整的3abc基因,與國外參考序列相比,同源性在99以上。將重組質粒pgem - 3abc和表達載體ptriex - 4neo分別用sal和bgl與xho和bgl消化后,亞克隆3abc基因至原核表達載體ptriex - 4neo中,通過酶切鑒定、 pcr擴增以及序列分析,發現克隆到ptriex - 4neo載體上的片段於3abc基因708bp處出現了17bp的缺失,碰巧在3ab基因后形成一終止密碼子,但3ab基因的閱讀框架完整,選出含有3ab基因完整閱讀框架的陽性克隆,用iptg誘導表達,收集菌液進行sds - page電泳、 westernblotting分析,果表明, 3ab基因在大腸菌中成功表達,其表達產物為分子量33 . 5ku的融合蛋白,並能被口蹄疫病毒陽性血清識別。經薄層掃描分析,表達量占總蛋白量的26以上。
  3. The two systems, connected by inextensible link members, are assumed to resist the full external horizontal forces at floor levels.

    這兩種體系借無彈性的,人們假設用它們抵抗各樓板的全部水平外力。
  4. Finite element analysis of the structure of the link levers of the labyrinth seal compressors

    迷宮密封壓縮機構有限元分析
  5. At present, adoptive new - style manipulate mechanisms abroad are mainly manipulate mechanism with concentrative link lever and that linked forerunner with link lever

    目前,國外採用的新式操縱機構主要有集中操縱機構和先導與操縱相合的操縱機構。
  6. Variable voltage and variable frequency ( vvvf ) inverter control technology applied by ford passenger lift extends the utilization from the elevators drive system to the door machine system, plus its matching none link lever synchronous belt type door machine structure, it results in the more smooth sensitive and secure door open and shut. the passengers feel the doubled warmth in entering into and exiting the elevators

    福德乘客電梯所應用的變壓變頻( vvvf )逆變器控制技術,從電梯驅動系統延伸運用到了門機系統中,加上與之相匹配的無同步帶式門機構,使電梯門的開啟和關閉更加平穩、靈敏和安全,令進出電梯的乘客倍感親切。
  7. This paper presents the structural design of the main bridge of lhasa river bridge, makes a deep - going study of the key techniques for design of the bridge, such as the reasonable span length ratio of each span of the 5 - span girder and arch hybrid structure, mechanical behaviour of the dual arch ribs, and section of the continuous girder tie beam, and also works out rigidity and stress conditions of the continuous girder tie beam and stress conditions of the concrete - filled steel tube arches of the main bridge

    摘要介紹了拉薩河特大橋主橋構設計情況,對於五跨梁拱組合橋梁各孔跨合理的跨度比、疊拱的受力行為及續梁系截面形式等設計中的關鍵性問題進行了深入的研究,給出了主橋續梁系的剛度和應力情況、鋼管混凝土拱的應力情況。
  8. Moreover, popularizing such system is expected. the following works have been fulfilled within this thesis : first of all, based on the general principle of virtual displacement of nonlinear continuum mechanics, the geometric and material stiffness matrices is presented, several examples show that both of them can give out accurate result

    本論文主要完成了以下工作:首先,根據續介質力學理論構造出的交錯桁架構空間單元的幾何剛度矩陣和彈塑性剛度矩陣,算例分析表明這些矩陣能準確地計算出構的空間二階效應和空間單元彈塑性端力增量,計算果具有良好的精度。
  9. Abstract : the calculation method of temporary load of the continuous carrier bar with different distance span was discussed. the length calculation in design of the pressure bearing bar with the different distance span which has to be worked out can be done by means of this method , thus making the structure design in construction more accurate and convenient

    文摘:討論了不跨續壓的臨時荷載計算方法,應用該方法可以解決不跨受壓件設計中必須解決的長度計算問題,從而使施工構設計更為準確簡便
  10. The calculation method of temporary load of the continuous carrier bar with different distance span was discussed. the length calculation in design of the pressure bearing bar with the different distance span which has to be worked out can be done by means of this method , thus making the structure design in construction more accurate and convenient

    討論了不跨續壓的臨時荷載計算方法,應用該方法可以解決不跨受壓件設計中必須解決的長度計算問題,從而使施工構設計更為準確簡便
  11. The optimum balancing of a four bar linkage with elastic links is studied, in which the control torque of redundant drives is taken as the design variable, and the shaking force and shaking moment of the mechanism are taken as the objective. the numerical simulation shows validity of the method

    針對一平面彈性四機構,以其震動力和震動力矩的加權和為目標函數,以冗餘驅動力矩為變量,對附加冗餘驅動的彈性機構進行最優平衡,其模擬果表明該方法是有效的。
  12. Secondly, by making use of the features of lattice frame anchor structure which can protect slope and retain stability of landslide together with its small space between beams and light anchor, the calculation model and formulas of slope force are dealt with and the design process of lattice beam and pillar as well as anchor and plate are introduced carefully

    利用格構式錨框架構所採用的小間距、小噸位錨續格構樑柱,從而使格構樑柱受力較均勻,適合鬆散堆積體滑坡治理的需要,即同時滿足深層抗滑和淺層護坡。
  13. The design process of the proposed method is described as follows : the input of the method is the 3d sketch of a light steelwork, and the geometry and topology information of the members in a steelwork are established automatically. the steel types and function of the linked members are determined by means of interactive scheme according to the design requirements. and the arrangement of the steel members and their orientation are built according to the steel member ' s type, the function of the steel member, the knowledge of the steelwork and welding technology

    在該方法中,首先通過交互手段輸入輕型鋼構的三維線框簡圖、自動確定構的幾何和拓樸信息,根據設計要求輸入各件的型鋼類型和在構中的功能;然後,根據型鋼類型、件功能、鋼構設計知識以及焊接知識自動確定件的搭配關系、建立件的方位布置確定規則和節點板設計的規則;最後,利用這些規則來決定節點稈件接關系、接位置,確定節點板的類型、布置方位和位置,實現三維鋼構的構自動設計。
  14. And it investigates the appearance condition ( including joint, crack, eroding, corrosion, braking pole device rupture, crane - girder ' s gnawing railway and so on ) of the whole crane - girder system on the spot, at the same time, it also actually examines the stress of the beam, chemical ingredient, distortion and railway excursion, etc. through sampling, and based on the actually examined results, it checks and calculates the carrying capacity of crane - girder system. then, based on the investigating on the spot and the calculated result, it discusses the mechanism of fatigue failure of the upper part of welded steel crane - girder, analyses the reason of steel crane - girder in the high - frequency emerging the fatigue crack, institutes the strengthened method of damaged steel crane - girder of accurate packing up workshop of the primary mill plant. finally, it presents some advice and suggestions for the repairing and strengthening method of fatigue crack of upper part of steel crane - girder in the high - frequency

    針對包鋼初軋廠精整車間鋼吊車樑上部區域出現裂縫這一問題,本文首先綜述了國內外關于焊接鋼吊車樑上部區域疲勞裂縫的研究現狀;其次對整個吊車梁系統的外觀情況(包括接、裂縫、腐蝕、銹蝕、制動件斷裂、吊車啃軌等)進行了現場調查,抽樣實測了梁的應力、化學成分、變形及軌道偏移等,根據實測果,對吊車梁系統的承載能力進行了驗算;然後,根據現場調查及計算果,探討了焊接鋼吊車樑上部區域疲勞破壞的機理,分析了重級工作制鋼吊車梁出現疲勞裂縫的原因,制定了初軋廠精整車間破損鋼吊車梁的加固方案;最後就重級工作制鋼吊車樑上部區域出現疲勞裂縫的修復與加固方案提出了一些意見和建議。
  15. A combination of three sets of four - bar linkages is used to connect two parallel shafts with a large pitch

    可以接兩個平行但有大軸距的轉軸,其實只是三組四罷了。
  16. On some engines, a metal chain is used to connect the crankshaft and camshaft gears. most push - rod engines and some ohc engines have chains

    在一些發動機上,金屬鏈被用來曲軸和凸輪軸齒輪。大多數推發動機和一些頂置凸輪軸發動機都有鏈。
  17. The pilot and passenger are suspended from spreader bars ( spreaders ) which ensure leg room for the pilot who sits behind

    飛行操縱者必須在乘客之後,兩套帶間使用分力?裝置(扁擔)接飛行傘主提帶。
  18. After the pbd i and pbd ii gene ligated with the expression vector pinpoint ? a - 3, the recombinated plasmid ppd - 1 and ppd - 2 was transformed into jm109 strains, 4 positive clones were screened by restriction enzyme analysis, dna sequencing showed that two out of 4 positive clones inserted sequence of the constructed plasmid, which was the same as that of pbd - i and pbd - ii gene respectively, and its reading frame was correct, thus its could be used to express fusion protein

    將pbd - 、 pbd -基因與表達載體pinpoint ~ ( tm ) xa - 3后獲得的重組質粒ppd - 1 、 ppd - 2轉化于大腸菌jm109中。經抽提質粒、酶切分析及pcr擴增,分別篩選到4個陽性克隆,將其中二個陽性克隆由測序分析,證實1個含pbd i基因片斷, 1個含pbd 11基因片斷,且閱讀框正確,可用於融合蛋白表達。
  19. If only one - to - one connections can be made, nanoscale crossbars would afford no net advantage

    如果只做得出一對一的,奈米交叉基本上就沒提供什麼好處。
  20. The williams engineers have tried to cut turbulence generated by the rear suspension elements by adopting this extended suspension cover over the push - rod link

    威廉斯車隊的工程師在推處之上採用了更長的懸吊外罩,嘗試藉此去除后懸吊所產生的亂流。
分享友人