連續層壓 的英文怎麼說

中文拼音 [liáncéng]
連續層壓 英文
continuous laminating
  • : Ⅰ動詞1 (連接) link; join; connect 2 (連累) involve (in trouble); implicate 3 [方言] (縫) ...
  • : Ⅰ形容詞(連接不斷) continuous; successive Ⅱ動詞1 (接在原有的后頭) continue; extend; join 2 (...
  • : i 量詞1 (用於重疊、積累的東西 如樓層、階層、地層) storey; tier; stratum 2 (用於可以分項分步的...
  • : 壓構詞成分。
  • 連續 : continuation; succession; series; continuity; continuing; running; continuous; successive; contin...
  1. This drilling adopts crank connecting link and walking beam percussion mechanism, which make the drilling possess two percussive functions, normal drilling takes connecting link impact as main mode, when encountering special situation and the connecting link impact can not drill, it can transform into hoisting impact, the stroke length can be modulated, it realizes automatic percussive drilling due to continuous operating of connecting link percussive mechanism, these can enhance drilling efficiency and relieve labor intensity ; it adopts pumping reverse circulation to drain slag, which not only resolves the drilling difficulty in special stratum such as pebble and gravel stratum and hard stratum, but also resolves the problem that the percussive drill ' s efficiency is low ; it adopts spur gear differential mechanism as double cylinders lazy tongs of main hoist, which not only ensures the balance state of drilling tool, but also reduces the mechanical design, and reduces the cost ; the bottom plate traveling motion of this drilling machine adopts walking type ; the drilling tower adopts hydraulic pressure uprising, and reduces the assistant operating time

    該鉆機採用曲柄桿、游梁式沖擊機構,使鉆機具有兩種沖擊功能;正常鉆進以桿沖擊為主,遇到特殊情況,用桿沖擊不能鉆進時,可轉為卷揚沖擊,沖程可調,因桿沖擊機構工作,所以實現了自動沖擊鉆進,可提高鉆進效率,減輕勞動強度;採用泵吸反循環的方式排渣,既能有效解決卵礫石地、堅硬地等特殊地鉆進的困難,又很好地解決了沖擊鉆機效率低下的問題;採用直齒圓柱齒輪差速機構作為主卷揚的雙筒同步機構,既保證了鉆具處于平衡狀態,又大大簡化了該機構設計,降低了成本;該鉆機底盤行走移位採用步履式;鉆塔採用液起立,減少了輔助作業時間。
  2. Using loges evaluation system, evaluate the microscopic seal ability of claystone formation in study area. and using standard breakthrough pressure of sample, incorporation with macrofeature as lithologic, sediment phase, thickness, continuity and so on, comprehensive evaluate the seal ability of every seal formation

    利用loges測井評價系統對研究區蓋微觀封蓋能力進行了系統評價,並應用取心樣品的突破力標定,結合巖性、沉積相帶、厚度、性等宏觀特徵對各套蓋開展了綜合評價。
  3. Secondly, using the perfectly bonded contact conditions between the layers, the delivery matrix between the electro - elastic layer and normal layer is worked out

    再由條件,計算由到一般的傳遞矩陣。
  4. Consequently, on the basis of non - winkler foundation model, a finite - element method that utilizes foundation flexibility matrix into iterative calculation is proposed in this paper originated from the item " the optimal design theory and research of pile capping beam " sponsored by natural science fund of hunan province, which the continuity of soil mass can be accounted for under various boundary conditions, different loadings and irregular beam characters

    本文結合湖南省自然科學基金項目「樁基承臺梁優化設計理論與方法研究」 ,針對非文克爾地基(半空間、線性變形或單向地基模型等)上的樁基承臺梁,提出一種利用地基柔度矩陣來進行迭代的有限單元法,可充分考慮梁下土體的性,並對基礎與土體脫開、承臺梁截面變化、梁體邊界條件復雜、上部荷載類型變化以及梁下基樁承載力差異等情況進行分析計算。
  5. Charge qs was located near the interface of silicon and oxide. with more charge, the field of buried oxide was improved up to the critical breakdown field basis on entirely continuity of electric displacement vector, and then the vertical breakdown voltage was raised. the comparisons between analytical and simulative results proved its availability of this model to interpret the vertical blocking mechanism

    該模型認為,將界面電荷qs引入isi / sio2的si界面,根據電位移矢量的全性,界面電荷qs越多,使i內電場增加,直至sio2的臨界電場,從而提高縱向擊穿電vb . v ,很好得解決了器件的縱向耐問題。
  6. Based on the studies, it is proved that lime fly - ash mixture is provided with more time to compact during construction compared with other base materials in forming even higher structure strength but not in reducing strength within 1 ~ 3 days period of time. meanwhile, structure strength of the mixture which has been destroyed by some reasons can be recovered in a great extent if original structure is regained. on the other hand, during the high temperature summer season or under other conditions promoting the mixture to form strength, continuous construction process between lime fly - ash base course and bituminous pavement can be carried out to complete the building process in short time

    確認二灰基材料與其它類型的基材料相比,在施工時具有較長的施工碾成型時間,在一定時間里延遲成型的二灰基強度不僅不降低,反而還有一定程度的提高;與此同時早期受到破壞的二灰材料在恢復整體性的條件下,結構強度能夠在很大程度上得到再恢復;另一方面,在夏季高溫季節以及在強化基強度形成的前提下,二灰類基和瀝青面可以採用施工的方式在較短的時間里完成路面鋪築工作。
  7. During the fracturing of the production intervals, log data are used to calculate continuous formation stress profile parameters near oil layer, formation stress profile analysis is applied to determine fracturing execution scale and technology, fracturing software, gohfer2000, is used to adjust execution parameters, which can optimize fracture geometry of target formation, and ensure high fracturing and stimulation efficiency

    在油裂過程中,應用測井資料計算油附近地的應力剖面參數;用地應力剖面分析,確定裂施工規模及施工工藝;用gohfer2000裂軟體調整施工參數,能夠優化裂目的裂縫幾何型態,保證裂增產效果。
  8. With an introduction to the construction of underground diaphram wall in fumin station, shenzhen city, this paper discusses the construction technique of forming dent into much and lightly weathered granite layers. which adopts hydraulic grab and different kinds of impacting drillers, and the construction of good quality protecting wall with mortar

    摘要通過深圳地鐵福民站地下墻施工實例,介紹在中、微風化花崗巖,採用液抓鬥結合不同類型的沖擊鉆機和利用優質泥漿護壁的成槽施工技術。
  9. The measured results of settlement depth for foundations with different breadth, soil deformation area around pile and foundation, interaction coefficient of double pile and load distribution on pile top beneath cap illustrate that the effects of interaction of soil - soil, pile - soil and pile - pile are obviously lower than elastic theory values

    不同基寬深度、基礎和樁側土變形范圍、雙樁相互影響系數以及樁頂荷載分佈的測試結果說明,土土、樁土、樁樁相互作用效應較介質彈性理論值明顯弱化。
  10. Based on the hybrid / mixed element method of piezoelectric laminated, a piezoelectric multilayer element is developed, in the piezoelectric multilayer element, the continuity of transverse stresses of at interfaces between layers is naturally ensured. 3. by the use of iso - function method, stress modes of 8 - node three - dimensional solid element made of on - axis orthotropic material are derived

    依據一般合板雜交元理論知識,提出一個合板多單元,利用合板子間的表面參數,使合板的間應力的性得到自然滿足,並對合板進行雜交元列式。
  11. Pressure separation is usually controlled by the following factors, such as subsidence rate, sediment types and diagenesis during the diagenetic evolution, as a result the pressure gradient is uncontinuous

    力分隔化是由於沉積物在成巖演化過程中受各種因素,如沉積速率、沉積物類型以及成巖作用的影響,使地中的流體力梯度呈現出隨深度變化不的一種現象。
  12. Abstract : pressure separation is usually controlled by the following factors, such as subsidence rate, sediment types and diagenesis during the diagenetic evolution, as a result the pressure gradient is uncontinuous

    文摘:地力分隔化是由於沉積物在成巖演化過程中受各種因素,如沉積速率、沉積物類型以及成巖作用的影響,使地中的流體力梯度呈現出隨深度變化不的一種現象。
  13. By the use of the continuity conditions at the layer interfaces, the general solution formulation of multilayered axisymmetric space magneto - electro - elastic media is given

    根據間完全接觸的條件,由傳遞矩陣方法導出了多磁彈性材料空間軸對稱問題的一般解析式。
  14. Because of the merit of continuity, economical efficiency, reliability and high resolution, the well logging has shown its advantages, especially in some drilling engineering problem, such as the prediction of rock drillability, selecting the drill bit types, prediction of formation pressure, calculation the in - situ stress, evaluating the borehole walls stability and determining the reasonable mud density, and etc. aiming at the engineering accidents, for example the well spout, well leak, well collapse and the drill blocking during the drill engineering in the t formation in north - east of sichuan, some farther studies of formation pressure in feixianguan from well - logging information are presented in this dissertation

    尤其是在巖石可鉆性預測與鉆頭選型、地力預報、地應力計算以及井壁穩定性評價、泥漿密度安全窗確定等鉆井工程問題上。測井技術由於性、經濟性、可靠性及解析度高等特點,越來越多地顯示了其優越性。本文針對川東北部三疊系地在鉆井過程中遇到的井噴、井漏、井塌和卡鉆等工程事故,主要對飛仙關組地力的測井解釋方法作了大量的深入研究工作。
  15. The study shows that rock stress sensitivity has the following characteristics : rock property has little sensitivity to stress, of which porosity has the least, permeability less, and compression coefficient most ; the rock property decreases with formation pressure decrease ; in the same formation pressure drop, decrease amplitude of the rock property is not a continuous function of permeability but related to distribution scope of permeability

    研究得出,巖石的應力敏感性特徵主要有:巖石物性對應力的敏感性總體上不大,其中以孔隙度最小,滲透率次之,縮系數最大;巖石物性隨地力的下降而下降;在同一地降下,巖石物性下降幅度不是滲透率的函數,而是與滲透率分佈范圍有關,高滲透率范圍,巖石物性下降幅度小,低滲透率范圍,巖石物性下降幅度大。
  16. Based on above research results, mechanism of the mixture features is studied by some methods, such as chemical analysis, electron microscope and x - raying and so on to explain the characteristic principle. research conclusion confirms it is the high content of useful fly - ash composition and the high structure polymeric degree that lime fly - ash mixture not only can present possibility of delayed base compaction and strength regeneration compared with other base materials but also can take continuous construction process to compact base course and pavement

    認為正是粉煤灰具有的高比例有效成分含量,以及結構上呈現的高度聚合的穩定性,使粉煤灰石灰混合料與其它常見的半剛性基材料相比,不但能表現出顯著的碾成型的可延遲性、結構強度的可恢復性,而且還具有在一定條件下能夠採用基和瀝青面施工的獨特性質。
  17. The rendering of continuous lod terrain surface is the key technique to build the virtual battlefield scene, and it is also the technical basis of generating the special effects such as craters, tire tracks

    地形表面的次細節動態繪制技術,是構建虛擬作戰自然環境的關鍵技術,也是生成彈坑和車輛駛過地面后留下的痕等地表特殊效果的技術基礎。
  18. This essay adopts the neural network and some parameters regression analysis to set up the some logging parameters prediction model of the rock drillability, then gets the continuous drillability classification value of single well formation. and deduces the theoretic relation of the formation pore pressure and the rock drillability creatively

    本文採用神經網路法與多元回歸分析法建立了巖石可鉆性測井多參數預測模型及單井地可鉆性級值剖面,同時創造性地推導了地孔隙力與巖石可鉆性之間的理論關系。
分享友人