連續澆築 的英文怎麼說

中文拼音 [liánjiāo]
連續澆築 英文
continuous placing
  • : Ⅰ動詞1 (連接) link; join; connect 2 (連累) involve (in trouble); implicate 3 [方言] (縫) ...
  • : Ⅰ形容詞(連接不斷) continuous; successive Ⅱ動詞1 (接在原有的后頭) continue; extend; join 2 (...
  • : 澆名詞(姓氏) a surname
  • : 築名詞(貴陽的別稱) another name for guiyang
  • 連續 : continuation; succession; series; continuity; continuing; running; continuous; successive; contin...
  1. ; 1. the trend of the development of burden and light hanging basket in the cantalever construction of continuous rigid frame bridge has been prospected, the roof truss and cable - state composite hanging basket also has been designed by analyzing and comparing with other ones. 2

    對大跨度橋梁懸臂施工的各種形式掛籃施工工藝進行了比較和總結,對剛構橋懸臂掛籃施工中重載輕型的發展趨勢進行了展望,提出了一種用於解決重載輕型懸臂施工的新型桁架斜拉式組合掛籃,並進行了可行性分析計算和設計。
  2. This paper establishes a model simulating dam actual placing process and considering the non - continuity of initial temperature on the boundary of new and old concrete, daily air temperature change, concrete - placing temperature, hydration heat, heat insulation on boundary, water - storing process, placing intermission and curing with water. the calculation of stress field considers the concrete weight, static water pressure, thermal stress, different autogenous volume change between rcc and normal concrete, change of elastic modulus of concrete with age and creep action

    考慮了乞今最為全面的初始條件和邊界條件,包括模擬壩體的實際升程過程,考慮了新老混凝土接觸面上的初始溫度不,逐日的氣溫變化,混凝土的入倉溫度,水化熱溫升,邊界保溫,水庫蓄水過程,間歇以及灑水養生等因素;應力場的計算考慮了混凝土的自重,靜水壓力,溫度應力,常態混凝土與碾壓混凝土不同的自生體積變形,混凝土的彈性模量隨齡期的變化以及徐變的作用。
  3. ( 2 ) development and application of the light - type cable - stayed hanging - cradle for railway, the hanging - cradle was applied in the construction of large span railway prestressed continous beem bridge, the quality and schedule of the construction was ensured

    ( 2 )開發、應用鐵路輕型斜拉式掛籃,施工大跨度鐵路預應力混凝土梁,保證了工程質量,達到了最快6dt構一對梁段的施工進度。
  4. The continuous kerbing method is ahigh production, cost effective alternative to the rpecast method. for that reason tsl construction have chosen the arrow 750xl slipformer

    鋪設方法取代預鑄方法實現高效率、低成本。因此, tsl建公司才選擇了箭牌750xl型路緣機。
  5. In light of the simulative research results, three methods are applied to analyze some controversial problems in this kind of structural system ( such as the concrete pouring sequence of continuous ends, the applying sequence of pretensioned force, the removal of the temporary supports, the concrete pouring style of continuous ends, the optimization of constructional reinforcement and prestressed reinforcement ). some important conclusions are drawn : the concrete pouring sequence of continuous ends should be in accordance with the principle of " interval end " ; the removal of temporary supports is also on this principle ( opposite to traditional opinions ). at the same time, other problems such as the shrinkage and creep effects of concrete, the c racking and failure pattern, the optimization of reinforced bars and prestressed bars are also analyzed in detail

    在此基礎上,對于目前先簡支后結構體系中存在的一些有爭議的問題(如后端部和后預應力張拉的順序、體系轉換中的臨時支座拆除順序、后端部方式、后端部的預應力筋及普通鋼筋的優化等) ,我們分別運用三種方法進行了細致的模擬分析、研究,並得出了一些具有重要工程意義的結論:后端部的順序和后預應力張拉的「隔跨」原則,臨時支座拆除的「隔跨」原則(此前人們一直認為「對稱注和對稱張拉」是最為合理的施工工序) ,混凝土的收縮、徐變對先簡支后結構體系的影響一般較小等。
  6. The feasibility, necessary condition and the measures for the temperature control for the continuous placement to speed up the construction progress is discussed herein as well

    論述了加快施工進度,上升混凝土的可行性,必要條件及需要採取的溫控措施。
  7. Based on the actual construction, a study on the simulative calculation for both the temperature and the thermal stress of the continuous rcc placement for the construction of langtan rcc gravity dam is made with 3 - d finite element method

    摘要結合施工過程,應用三維有限單元法,對龍灘大壩連續澆築混凝土的溫度及溫度應力,進行模擬計算的研究。
  8. By the research on the raw materials, the mix proportion, the concrete temperature control in outlet, in transport and in placement, the cure and the post - cooling water, the synthetic measures for rcc dam construction in high temperature and the enforcement methods on basis of the computation and experience of jinghong hydropower station are presented in this paper

    本文通過對原材料及配合比、混凝土出機口溫度控制、運輸過程溫度控制、過程的溫度控制以及混凝土筑後的養護和冷卻通水等一系列研究,提出景洪電站高氣溫條件下大壩碾壓混凝土施工的綜合措施,並在計算和已有經驗的基礎上給出具體實施方法。
  9. It has become to pass that the permanent load - bearing capacity of the large - span pc ( prestressed concrete ) continuous rigid frame bridge constructed with the cantilever site cast construction method keeps cutting down in service

    採用懸臂施工法施工的大跨pc剛構橋,在使用中其持久承載力不斷地降低已成為事實。
分享友人