進出水管 的英文怎麼說

中文拼音 [jìnchūshuǐguǎn]
進出水管 英文
jcsg
  • : 進構詞成分。
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名詞1 (管子) pipe; tube 2 (吹奏的樂器) wind musical instrument 3 (形狀似管的電器件) valve;...
  • 進出 : 1. (進來和出去) pass in and out; get in and out 2. (收入和支出) receipts and payments; turnover
  • 水管 : waterpipe; water carrier; aqueduct; water conduit; water pipe; syphon; siphon (消防) 水管車 hos...
  1. The central control room of the branch is located in the bank of communications plaza in the lujiazui, shanghai, which adopts the xbrother developed professional security and facility control system which monitors and controls 10 subsystems in the central control room, including : the ups control system ; the coulometer control system ; the leaking control system ; the temperature and humidity control system ; the air conditioning control system ; the video surveillance system ; the sensor of in out water temperature control system ; the access control system ; the switch control system and ; the fire alarm system

    交通銀行機房位於上海浦東新區陸家嘴金融中心的交銀金融大廈內,其機房監控系統採用我司自主研製的專業機房監控系統。對機房內的ups監控系統電量儀監測系統漏監控系統溫濕度監控系統空調監控系統視頻監控系統溫傳感器監測系統門禁監控系統開關狀態監控系統消防監控系統等10個子系統行集中監控,對所有的設備和系統行工作狀態運行參數報警處理等監視和理。
  2. ( 2 ) drainage way of toilet and kitchen of residential building in this chapter, the necessity of reformation of drainage way of toilet and kitchen are presented. drainage way with floor blocked up, drainage with back outlet sanitary facilities and drainage with floor descended are discussed and summarized

    ( 2 )住宅衛生間、廚房排方式提合理解決衛生間、廚房排方式勢在必行,對墊高衛生間地面敷設排的排方式、後排方式和下沉衛生間樓面敷設排的排方式行探討和總結。
  3. After analyzing the merits and shortcomings of the current methods for leak hunting of municipal water supply network and inducing the reasons that cause the pipe leakage, this thesis pointed out that the water supply network should be evaluated synthetically by means of reliability theory

    本文分析了現有給網檢漏方法的優缺點,在歸納了導致道漏損的各種原因的基礎上,指應該利用可靠度理論對行綜合評價。
  4. Based on consider hereinbefore, this dissertation discusses several aspects on the problem of the sustainable and optimum exploitation of groundwater resources as follows : ( 1 ) reviewed entirely the origin and evolvement of the concept " sustainable development ", stated and commented the study status in queue on " sustainable development " around national and international range, thorough discussed the science connotation about the concept " sustainable development " ; ( 2 ) looked back and commented across - the aboard some furthest basic concept and proposition related to groundwater resources, put forward self opinions on a few existent mistake points of view and chaos understandings ; ( 3 ) expatiated entirely on the content and meaning of the theory of changeable groundwater resources system, contrast with the traditional methods of groundwater resources calculation and evaluation, combined example to show the application of this theory ; ( 4 ) thorough analyzed the difficult and complexity to forecast the groundwater resources, fully stated the traditional methods of groundwater resources forecasting, pointed out the characteristic and applying condition of these forecasting method, introduced the main ideas and methods of wavelet analysis developed recently, and the matlab software be known as the fifths era computer language, and its accessory wavelet analysis toolbox, applied these methods and tools to analyze the groundwater dynamic curve, adopted the b - j method and morte - carlo method, combined with the theory of changeable groundwater resources system, discussed the new view on the forecast of groundwater resources ; ( 5 ) synthetically analyzed the characteristics and limitations of the present all kind of groundwater manage model, combined mathematical programming mathematical statistics random process and the theory of variation system of groundwater resources on the unite optimum attempter of surface water and groundwater, emphasized how to make the model more nicety, more simple, more practicality ; ( 6 ) analyzed the inside condition and outside condition to assure the sustainable and optimum exploi tation of groundwater resources, the inside conditions are the follows : correct resources idea, scientific methods of resources calculation and evaluation, credible forecast methods of resources, exercisable measures of resources management, the outside conditions are the follows : the development idea of high layer, the transform of manage system, the matched policy and rule of law, the adjusted of economy lever, the improve of cultural diathesis, the boosting up of water - saving consciousness and detail measures, the control of population rising, the prevention and cure of water pollute, the renew and rebuild of ecology ; ( 7 ) scan the sustainable and optimum exploitation of groundwater resources from the high level of metagalaxy, earth system science, and philosophy ; lint out the more directions on groundwater resources

    基於以上考慮,論文主要從以下幾方面對地下資源可持續開發問題行了比較深入的探討:全面回顧了「可持續發展」概念的由來與演變,對國內外「可持續發展」的研究現狀行了述評,並對「可持續發展」概念的科學內涵行了深入探討;對涉及地下資源的一些最基本的概念和命題行了全面的回顧和評述,對目前仍然存在的一些錯誤觀點和混亂認識提了自己的見解;全面闡述了地下資源變值系統理論的內容和意義,並與傳統的地下資源計算評價方法行了對比分析,結合實例具體說明了方法的應用;深入分析了地下資源預測預報工作的極端重要性和復雜性,對傳統的地下資源動態預測方法行了全面的評述,指了各類預測預報方法的特點及適用條件,對最近二十多年剛發展起來的小波分析技術的主要思想和方法及其應用范圍,以及號稱第五代計算機語言的matlab軟體和附帶的小波分析工具箱行了介紹,並應用於地下動態過程線的分析,採用時間序列中的b ? j法,蒙特卡羅方法,與地下資源變值系統理論相結合,探討了地下動態資料分析和地下資源預測預報的新思路;綜合分析了現今各類地下理模型的特點及缺陷,將數學規劃、數理統計、隨機過程等與地下變值系統理論相結合行地表地下或多源的聯合優化調度,使模型更準確、更實用;對保證地下資源可持續開發的內部條件和外部條件行了分析,內部河海人學博卜學位論文前言、摘要、目錄條件主要是正確的資源觀,科學的資源計算與評價方法,可靠的資源預測預報技術,可操作的資源理措施,外部條件主要是高層發展思路、理體制的變革、配套的政策法規、經濟杠桿的調節、人文素質的提高、節意識的增強及具體節措施、人口增長的控制、體污染的防治、生態的恢復和重建等;從宇宙科學、地球系統科學及哲學的高度審視地下資源的可持續開發;指了地下資源可持續開發的一步研究方向。
  5. On top of one of the fast - opening ends that closed to the pig receiver & launcher shall assemble vent valve, safety valve and pressure gauge, and at the bottom shall assemble drain valve, sideway inlet and vent valve to take out medium from the main pipe as the power of forcing pig and conveyance medium

    靠近收發球筒快開盲板一端上部應設防空閥、安全閥及壓力表、下部設排污閥、側面設油(氣、)閥,以便從干中取介質作為驅動清器的動力及輸介質。
  6. Big drops were dripping from a broken waterspout, and a ray of gaslight slipped from mme bron s window and cast a yellow glare over a patch of moss - clad pavement, over the base of a wall which had been rotted by water from a sink, over a whole cornerful of nameless filth amid which old pails and broken crocks lay in fine confusion round a spindling tree growing mildewed in its pot

    大滴大滴的珠從的裂縫中滴下來。一道煤氣燈的燈光從布太太的窗子里射來,把一段長了苔蘚的路面一段被廚房的排溝的污侵蝕了的墻根及整個堆滿了垃圾的角落映成了黃色,垃圾中有舊桶和破壇碎罐,一口破鍋內竟然長了一棵瘦小的衛矛。
  7. The impacts of both the velocity head and momentum distribution in the t - junction of a tailrace surge tank on the critical stable sectional area of the tank were analyzed by using gardel ' s empirical equations for t - junction flow. based on thoma ' s theory, a formula of the critical stable sectional area is derived. 5

    基於gardel關於三通頭損失的經驗公式,研究分析了連接處的速度頭以及調壓室體與尾隧洞體之間的動量交換,對有連接的尾調壓室穩定斷面積的影響,並在托馬( thoma )假定基礎上,推導相應的調壓室穩定斷面的計算公式; 5
  8. In the design, the construction measures such as application of shrinkage - compensating concrete, arrangement of spacing layer between the foundation rock and the bottom slab, adding outside waterproof layer, flexible connection between outlet pipe with side - wall, integerated concrete placement of pump seat with bottom slab and design of reinforcement with application of advanced calculation theory are used according to the characteristics of lager span, larger volume and complex loading conditions of the understructure

    針對下部結構跨度大、體積大、受力復雜的特點,在設計中採取多種措施,包括採用補償收縮混凝土、基巖與底板間設隔離層、增設外防層、與邊墻採用柔性連接、機座與底板整體澆注、採用先計算理論指導配筋。
  9. For the receiving and delivering operation and inventory management in no. 8 and no. 9 stockyards directly affect products " circulating capacity in no. 3 operating district and the loading / unloading efficiency of ships which eventually postpone the delivering time to customers according the tenth five year ' s planning of wisco, wisco will produce 9 million tons annually and outselling products will highly exceed the designed 1. 2 million tons circulating capacity of no. 3 operating districts

    8 、 9碼頭庫場是口鋼材集散和換裝過程中短期堆存的場地,庫場的大小,尤其是平的高低,影響著船舶裝卸效率的高低和在港停時的長短,直接影響到三區碼頭的通貨能力,影響到武鋼產品的外發能力。根據武鋼「十五」規劃,武鋼將實現每年鋼產量900萬噸,外發產品將遠遠超過工業港三區碼頭的設計通貨能力120萬噸。
  10. The kind of welding equipment is suitable forwelding the qarts in appplications of heat exchanger in - out water pipe port of electical heater and hot pipe fittings simple operation low lost and good seam foring are the advan tages. it is an essential and special equipment in the profression of tube - making electrical and solar water heaters

    該系列焊接設備適用於太陽能熱器端蓋及箱內受到影響上的進出水管、熱接頭、電加熱器接頭及搪瓷進出水管的自動化焊接,焊縫盛開有美觀、效率高、成本上升低,是制桶業、太陽能熱器、電熱器等行業必不可少的專用設備。
  11. Typical accident - causing " theories includes heinrich " s domino " s theory, its development by bird, adams and other people, progress of which is that it is deficiencies of management system that are the root cause in accident causation sequence. this is author " s idea resource and main method to produce the water traffic accident - causing theory. in addition, uncontrolled transferring of energy theory, applies widely in safety management scheme for water traffic ; human error accident model can be used to analyze causes of collision accident and to take preventive measures ; perturbation theory and multilinear event sequencing method is a very useful investigation method to water traffic accidents

    有代表性的事故致因理論有海因里希因果連鎖理論以及博德、亞當斯等人對該理論的發展,這些發展的主要步是突理缺陷是事故因果連鎖中的基本原因,是本文分析和發展上交通事故致因理論的主要思想來源和方法論;能量意外轉移理論,廣泛的應用在上交通安全的各項具體理制度中;人失誤事故模型能用於指導對碰撞事故的原因分析和預防;動態變化理論及多線性事件連鎖論對指導事故調查是較好的分析方法;軌跡交叉理論雖然以獨立的理論形式存在,但本文認為其實質仍然是因果連鎖理論的發展。
  12. Combined with practical data of shannxi lin hekou hydropower plant, the temperature filed of m and n schemes during construction and operation are simulated and analyzed. the isoline map of stable temperature field of the arch crest girder section and the vertical section in the center of arch dam, the isoline map of unstable temperature field of the arch crest girder section and the vertical section in the center of arch darn during construction and operation and the maximal and minimal temperature value during construction and operation are provided. the distribution law of temperature in the dam and the form reason of high - temperature zone are analyzed and the effect and feasibility of cooling and the zone of cooling are discussed

    結合陜西藺河口電站工程實際資料,對m方案和n方案溫度場行了施工期和運行期全過程模擬計算分析,給了拱冠梁剖面和壩體中心縱剖面準穩定溫度場等值線圖以及施工期、運行期拱冠梁剖面和壩體中心縱剖面非穩定溫度場等值線圖,提供了施工期逐月和運行期每年最高、最低溫度等成果,分析了壩體溫度分佈規律以及高溫區形成的原因,並探討了預埋冷卻的效果和可行性以及預埋冷卻的區域。
  13. The sub - model for design of population density was developed according to the principle of determining boll number from target yield, fruit node from boll number, fruit branch from fruit node and population density from fruit branch by integrating the effects of sowing date, cutout date, effective temperature accumulation above 12, variety type, and fertilizer and water management levels. sowing rate was then decided by integrating the effects of different soil water and salt contents, ph, temperature and sowing style on seedling emergence rate with relative weight method

    基於「以產定鈴、以鈴定節、以節定枝、以枝定苗」的原理,同時考慮播種日期、打頂日期、 12的有效積溫、品種株型特性、肥平差異等因素來確定適宜的種植密度;在此基礎上,應用相對權重法計算土壤含量、含鹽量以及整地質量和播種方式等多個生態環境因子對苗率的綜合影響,而確定播種量。
  14. In order to achieve the optimized tunneling approach, first, tunneling procedures, shift length, horizontal jet grouting length, bench length and space length between c and d part of crd method are optimized ; on the basis of these results, two kinds of tunneling schemes are calculated with three - dimensional fem and the optimized tunneling scheme is achieved. as results of the optimized scheme, the conclusion is made that the gas pipe above the tunnel of sk3 + 355 section is secure. the calculation results are verified through comparison of numerical simulation results and site - monitoring measurement data

    為得適合本段工程的最佳施工路線,利用大型有限元通用軟體ansys對開挖順序、開挖尺、平旋噴長度、臺階長度及crd工法施工的c 、 d部相錯長度行了有限元數值模擬和優化分析,並利用這些分析結果,行了兩個施工方案的三維有限元動態施工模擬,得了較優的施工方案,並利用施工后的地表沉降槽曲線,對sk3 + 355斷面處隧道上方的煤氣線的安全性行了分析,得了利用此施工方案施工不會造成此處煤氣線破壞的結論。
  15. Quanxing shoes plastece co., ltd. is located in the famous shoesbase - chendai town, jinjang city, fujian province, quanxing is a distinctive shoes - making enterprise. with substantial technical power, long production history and excellent managementsystem, we have been producing all kinds of mostfasionable middle and high, middle skatingshoes * sandal shoes * leisure shoes and so on, adhetung to the principle of “ quality for success, and credibility for development ”, we introduce the most up - to - date assembyl line to provide new technol - ogy, elegant style and best service for our domestic and international customers. let us create a breightre with mutual efforts

    晉江市泉興鞋塑有限公司地處著名的鞋類生產基地(中國晉江鞋都)本公司是一家獨特開發製鞋公司,公司擁有雄厚的技術力量,豐富的生產經驗和傑理體制,長年生產各種最新款式的中高擋滑板鞋登山鞋休閑鞋和其他有特色的鞋類.公司「以質量求生存,以信譽求發展」的經營方針,擁有目前最先的流線生產設備,我們將以更新的技術,更精美的款式為海內外新老客服務.歡迎國內外廣大客戶光臨我司參觀指導,洽談業務,讓我們攜手共開創更加輝煌的明天
  16. 4dm outer - thread copper pipe union of the inlet and the outlet

    口為4分15外螺銅接頭
  17. 4dm inner - thread flexible joint copper pipe union of the inlet and the outlet

    口為4分15內螺紋活接銅接頭
  18. 3 the design theories of cooling pipe of play down internal temperature of mass concrete about diameter, length, arrange method, rate of flow, current velocity, reduce heat time, temperature disparity to in and out, reduce heating result etc. 4 the theory of influence about concrete internal temperature and concrete crack because of transform of mixture ratio and pulverized fuel ash sophisticate quantity

    西安建築科技大學博士生論文一;一;一一『一一一3降低大體積混凝土內部溫度常用的冷卻徑、長度、布置方法、流量、流速、降溫時間、口的溫差、降溫效果等的設計計算理論。 4配合比及摻加料對混凝土內部溫度和混凝土開裂的影響理論。
  19. Through developing a 2 - dimensions heat transfer model of buried pipe - in - pipe heat exchanger and simulating the process by computer, the author figures out inter - relations of factors which influence characteristics of buried pipe - in - pipe heat exchanger, such as pipe diameter, pipe length, ratio of pipe diameters, flow rate, inlet water temperature, patterns of water inlet and outlet, and material features made of pipe, and proposes some optimizing indexes of buried pipe - in - pipe heat exchanger. the author studies the " heat - - short circuit " phenomenon as well and gives < wp = 5 > some important results

    本文通過建立地下套式埋換熱器傳熱過程的二維傳熱模型,並藉助計算機對分析結果行解析,弄清了影響埋換熱器性能的徑、長、徑比、通過流量、溫度、方式以及材等參數的作用,並提了相應的優化指標,對研究界懸而未決的「熱短路」問題也行了細致分析,得了有關結論。
  20. This experiment include many contents, in a word, that is summer condition experiment, winter condition experiment > summer - winter transition condition experiment and winter - summer transition condition experiment, furthermore summer condition experiment still include flux changing experiment and winter condition experiment still include thermal balance experiment this article dealt with the data of the test, calculating out energy absorbing ( energy discharging ) of buried pipe in winter condition ( summer condition ), input power of heat pump x heat exchanging of piece buried pipe length x co - efficiency performance ? op ( energy efficiency rate ? er ) and average heat exchanging coefficient ; in additiont this article compares the inlet water temperature and outlet water temperature of underground the first layer and the second layer buried pipe when heat pump was running, the results are that the heat exchanging ability of the second layer buried pipe outgos the first layer buried pipe, and heat exchanging is more stable ; and still analyse earth temperature resuming in the transition season. the results are earth temperature resume fast in the first week when the heat pump runs off

    本文測試內容相當多,概括地說就是四個工況的測試,即夏季製冷工況的測試、冬季供熱工況的測試、夏?冬過渡季測試和冬?夏過渡季測試;另外在夏季工況的測試中還行了變流量測試,在冬季工況的測試中還行了熱平衡測試。本文對測試數據行了處理,計算了冬(夏)季工況埋吸(放)熱量、熱泵空調器供熱量(製冷量) 、熱泵空調器輸入功率、埋單位長換熱量、供熱性能系數(製冷能效比)和平均傳熱系數等;另外,還比較了熱泵運行時地下一二層埋溫度變化情形,得地下二層埋換熱能力優于地下一層埋,且換熱很穩定;並分析了過渡季地下一二層埋溫度恢復情形,得熱泵系統停機一周內地溫恢復特別快。
分享友人