進尺記錄圖 的英文怎麼說

中文拼音 [jìnchǐ]
進尺記錄圖 英文
drilling time chart
  • : 進構詞成分。
  • : 尺名詞[音樂] (中國民族音樂音階上的一級 樂譜上用做記音符號 參看「工尺」) a note of the scale in ...
  • : Ⅰ動詞1 (把印象保持在腦子里) remember; bear in mind; commit to memory 2 (記錄; 記載;登記) writ...
  • : Ⅰ名1 (用做記載物的名稱) record; register; collection; selections 2 (姓氏) a surname Ⅱ動詞1 (...
  • : Ⅰ名詞1 (繪畫表現出的形象; 圖畫) picture; chart; drawing; map 2 (計劃) plan; scheme; attempt 3...
  • 記錄 : 1 (寫下來) take notes; keep the minutes; record; write down; log; enter; read in 2 (當場記錄下...
  1. Defining the pose parameters of the tool as the driving dimensions and the length of actuating limbs as the driven dimensions, the configuration of the simulation mechanism was varied correspondingly with the variation of the driving dimensions and the driven dimensions ( length of actuating limbs ) could be acquired and recorded

    給出了並聯機床機構簡和虛擬樣機實體模型,通過將數控代碼行預處理,行了並聯機床的虛實映射計算,即給定刀具位置和姿態的驅動寸、驅動桿件長度的被驅動寸,在裝配約束作用下驅動寸帶動整個機構運動,桿件長度的被驅動寸,求解出桿長的值。
  2. Before embedding of the foundation and embedment parts, technical clarificaiton will be don by the engineer in charge and the working group on the basis of design drawing 、 installation documentation 、 design amendment notification and supervision nofification 、 the principle of no impeded the progress schedule 、 the requirement of the relevant regulations and specification, setting out the embedment locaiton applied by the theodolite 、 water level and tape after that carrying on the embedment process and the record will be well kept

    以設計紙、設備安裝資料及設計修改通知單和監理通知單為依據,按規程規范的要求,以不影響工程度為原則,由主管工程師對施工班組行技術交底,利用經緯儀、水準儀和捲等測量工具放點定位行基礎及預埋件預埋並做好預埋
分享友人