進度線 的英文怎麼說

中文拼音 [jìnxiàn]
進度線 英文
progress line
  • : 進構詞成分。
  • : 度動詞[書面語] (推測; 估計) surmise; estimate
  • : 名詞1 (用絲、棉、金屬等製成的細長的東西) thread; string; wire 2 [數學] (一個點任意移動所構成的...
  • 進度 : 1. (工作進行的速度) rate of progress; rate of advance 2. (工作進行的計劃) planned speed; schedule
  1. The controlling parameters for smooth blasting in qin - ling zhongnanshan tunnel project are optimized according to the fundamental principle of smooth blasting, considering the minimal resistance, coefficient of embrasure density, coefficient of non - coupling, density of dynamite and rate of exploding. the efficiency of this method has been analyzed and justified by the high speed and good quality of the project

    根據光面爆破的基本原理,從最小抵抗、爆眼密集系數、不耦合系數、裝藥密、爆破尺等幾個方面確定秦嶺終南山隧道光面爆破主要參數的選取,分析了該隧道鉆爆設計在隧道施工中的運用取得的成效,提高了施工,同時也保證了施工質量。
  2. Modbus transducer is the key device in the system and is used to offer power supply of pressure and temperature sensor, to collect signal, to linearizate and compensate temperature, to calculate density, volume and mass, to transmit data to modbus network, and display the data. so the modbus transducer is a multi - parament measurement, intelligent control device which can manage multi - signal

    變送器是系統的核心設備,其作用是為油罐溫、壓力、液位、可燃氣濃等傳感器供電,採集傳感器信號並性化、溫補償等處理,完成密、體積和質量等參數計算,將數據輸出到modbus現場總測控網路,根據需要現場顯示計測量參數。
  3. The steel construction is made up of roof beam, post, purlin, roofing and wall, adopt the automatic production line to weld and take shape in the factory, construction site spend high - strength bolted joint reduce weld work load, make progress and quality receive the complete assurance

    鋼結構由梁、柱、檁條、屋面和墻體組成,工廠內採用自動化生產焊接成形,施工現場用高強螺栓連接,減少了焊接工作量,使和質量得到完全保證。
  4. The author uses the technique of generalized network plan and the key line methods to divide the boiler installation item and build configuration model, adopts the p3 in the building pingliang power plant project to realize the dynamic management of this installation plan, and give news of the project schedule, plan and material to the power plant by the computer network to help the manager

    本文作者應用廣義網路計劃技術和關鍵路法對鍋爐安裝項目行作業劃分和建立結構模型,並通過p3軟體在平涼電廠在建工程中的應用,實現了安裝工程計劃的動態管理,並通過計算機網路向電廠發布電建工程的施工、計劃、材料等方面的信息,為管理層提供了詳實的管理數據。
  5. Following the approval of the relevant manualsmaintenance scheduleflight test schedule and the conducting of inspections of its facilities and route proving flights to ensure its fulfillment of the department s requirements, an aoc was granted to cr airways on march 16

    民航處又審批有關的手冊維修作業表飛行試驗表,檢查其設施和監察其航驗證試飛,確保該公司符合處方各項要求后,於三月十六日簽發航空營運許可證予該公司。
  6. A lot of data of elevation in different places of the shallow water of n antong were obtained by fish - exploring machine and gps determining and tide cor recting. an image which reflects landforms of nantong was obtained by selecting f rom the many noaa images on different channels and in different phases. based on the image, grey scales corresponding to different places were obtained. by using c la ssifying liner regression technique, liner regression equations were established between the elevation and grey scale, and the threshold values of grey scales of the different elevations were determined. according to the threshold values, the a reas of the tidal zone above different elevations of the shallow water of nanton g were estimated

    通過利用gps及漁探器實測,並行潮位訂正,獲得南通淺海海域大量測點的高程資料;通過對多時相各通道noaa衛星照片行篩選,挑選能反映淺海地貌的通道資料,從中讀取各測點相對應的灰值,在此基礎上利用分級性回歸,建立不同高程范圍內的高程、灰性回歸方程,確定不同高程的灰閾值,從而測量出南通市淺海海域不同高程以上的潮間帶面積、分佈。
  7. One special feature of this paper is that it provides fast implementation means for the all kinds of modular exponentiation algorithms, which facilitate the implementation of the rsa public key algorithms. the paper improved the sliding window algorithm by largely reducing the space complexity. meanwhile this paper represents an efficient combined algorithm to improve the processing of encryption and decryption

    大數模冪乘運算是實現rsa等公鑰密碼的基本運算,其運行效率決定了rsa公鑰密碼的性能,文章主要研究了各種模冪演算法的快速實現方法,提出運用組合演算法的思想來減少演算法運行時間;並對滑動窗口取冪演算法行了部分改,用性表來存儲預計算數據,從而減少了演算法的復雜一步提高了rsa加/解密的效率,並在試驗測試中得到較為滿意的結果。
  8. Following this principle, dpc adopted the method of " goal management ", i. e. disintegrating the three goals of investment, schedule and quality to different levels in accordance with different administrative levels to keep their consistency generally. moreover, dpc tried some effective new pattern such as in - phase management, strategic pass management and block management to shorten the time limit on the premise of ensuring the project quality. using some effective science way and modern management technology such as key line method to realize the reasonable resources allocation, including human resource, material resource and financial resource

    在這一理念的指導下,大連石化分公司運用了目標管理,將投資、、質量三大目標層層分解,並保證目標點的設置和時間段的劃分切實可行,方便合理;目標分解結構在較粗的層次上與組織分解結構一致,實現了組織結構設計與目標分解設計的配套;努力提高作為建設單位為各參建方的服務意識,注重與參建各方的有效溝通和相關單位的全方位協調;採用同步管理、關口管理和分塊管理等多種有效的新模式,在保證工程質量的前提下,趕工期,搶;用關鍵路法、凈值法等有效的科學手段和現代管理技術來實現建設工程中資源的合理配置。
  9. Line leader shall have a good control of the production process, quality and staff situation as well as correct and audit operator ' s work at any moment

    掌控生產,品質及人員的動態,隨時糾正和稽核員工的作業。
  10. Is there a line plan or production loading schedule for at least one month in advance

    有預先最少一個月的生產路圖或者生產表嗎?
  11. By viewing a progress line, you can quickly determine whether your project is ahead of or behind schedule

    通過查看進度線,可以迅速判斷項目是否超前或落後于日程。
  12. Connecting the progress line to an individual task is an elongated v lying on its side

    進度線連接到單個任務上后,將在旁邊顯示一條拉長了的v形曲
  13. Progress lines connect tasks that are in progress or should have started to a vertical line that represents the progress date

    進度線可以將行中的或應該已開始的任務連接到一個代表日期的垂直上。
  14. To display progress lines in your project

    如果要在項目中顯示進度線
  15. Display progress lines in your project

    在項目中顯示進度線
  16. If the line is perfectly straight and vertical rather than looking like a v, the task is right on schedule

    如果進度線非常平直而不象字母v ,則表明任務符合日程。
  17. The length of the v tells you how far ahead or behind a task is, relative to the date on which the progress line is set

    V的長表明:相對于進度線日期任務的超前或落後程
  18. You can show variances by displaying progress lines, which visually represent the progress in your project

    可以通過顯示「進度線」來表明差異,進度線可以直觀地描繪項目的
  19. Tasks that are completed or scheduled to start after the progress - line date are n ' t connected to the progress line

    已完成的或排定在進度線日期之後開始的任務將不會連接到進度線上。
  20. If you want to create a visual representation of the progress of your project, you can display progress lines on your gantt chart

    如果要直觀地表示項目,則可以在「甘特圖」上顯示進度線