進度計劃 的英文怎麼說

中文拼音 [jìnhuà]
進度計劃 英文
plan of schedule
  • : 進構詞成分。
  • : 度動詞[書面語] (推測; 估計) surmise; estimate
  • : Ⅰ動詞1 (計算) count; compute; calculate; number 2 (設想; 打算) plan; plot Ⅱ名詞1 (測量或計算...
  • : 劃動詞1 (撥水前進) paddle; row 2 (合算) be to one s profit; pay 3 (用尖銳的東西在別的東西上...
  • 進度 : 1. (工作進行的速度) rate of progress; rate of advance 2. (工作進行的計劃) planned speed; schedule
  • 計劃 : 1 (工作、行動以前預先擬定的內容和步驟) plan; project; programme; device; devisal; design 2 (做...
  1. Discusses the optimizing process of treatments of the main technical problems, which include the construction schedule, the field plan and t he balance of earth and rock works, method of the river closure and cofferdams sections, procedure and time of the river colsure, form of the cutoff, construct ion of the cut - off walls

    論述了三峽大江截流及二期圍堰實施過程中的施工進度計劃、料場規與土石方平衡、截流方式與圍堰斷面形式、截流占程序和時段、防滲形式、防滲墻施工等主要技術問題的優化完善過程
  2. Assembly plan should cover : calculation on amount of members and joints, assembling equipments ' choosing, assembly flow sequence, assembly method, progression plan, personnel management, steel members mobilization, quality standards, safety measures and special construction techniques

    編制的組織設的內容應包括:算構件和連接件的數量,選擇吊裝機械、確定流水程序、確定吊裝方法、制定進度計劃、確定勞動組織、規鋼構件場、確定質量標準、安全措施和特殊施工技術等。
  3. The author uses the technique of generalized network plan and the key line methods to divide the boiler installation item and build configuration model, adopts the p3 in the building pingliang power plant project to realize the dynamic management of this installation plan, and give news of the project schedule, plan and material to the power plant by the computer network to help the manager

    本文作者應用廣義網路技術和關鍵線路法對鍋爐安裝項目行作業分和建立結構模型,並通過p3軟體在平涼電廠在建工程中的應用,實現了安裝工程的動態管理,並通過算機網路向電廠發布電建工程的施工、材料等方面的信息,為管理層提供了詳實的管理數據。
  4. The main parts of this paper is now be showed in the following : 1 ) the development for the compiling of the schedule had been finished 2 ) the realization of the management function for the schedule system, the base managements can be processed with the management tools. 3 ) the data taken and expressed from the drawing layout system, in the schedule system. 4 ) the data transfer from the schedule system to the drawing layout system

    本文的研究工作主要包括以下幾個方面: 1 )適合電廠工程的進度計劃編制功能的開發完成; 2 )實現電廠工程的施工進度計劃管理功能,可以利用施工進度計劃編制系統的管理工具對施工進度計劃行基本的管理; 3 )實現在施工進度計劃定製系統中對施工平面布置系統中的數據的讀取和表達; 4 )完成施工進度計劃數據向施工平面布置系統的傳送。
  5. The paper discusses accelerating the construction schedule and shortening the time limit for a project

    本文對建築施工組織中來用先施工技術的進度計劃后如何縮短施工工期問題行了探討。
  6. 5. the project completion probability is discussed, which fully describes the uncertainty of construction sequence schedule and provides basis for analysis of time limit

    5 .行了完工概率分析,較好地描述了施工進度計劃的不確定性,為施工工期論證分析提供了依據。
  7. The key to the time control of newly - built projects is to fix project ' s general control task time and stage control task tine, and break them up to the time plan to realize the project ' s early operation and benefit achievement ; the time control should aim at practicing the plan but not affecting the project ' s annual irrigation plan, by working out plan, following up the construction and timely error correcting management to make sure the achievement of project ' s task time

    新建項目的施工控制的關鍵是要合理地確定項目總控制工期和階段性控制工期,並將其分解落實到進度計劃中,以實現工程及早投運、及早發揮效益的目標;更新改造項目的控制則要以進度計劃的落實不影響工程的年灌溉為目標,採取合理制定、跟蹤施工、及時糾編的管理辦法,確保項目工期目標的實現
  8. The production cycle is long. 3rd, the stock of manufactured and semi - manufactured goods is larger. 4th, there are lots of alteration and breakthroughs in the production course, in view of this kind of specific condition, 1st, the authority of production process plan should be ensured. 2nd, the need plan for material should be in time. 3rd, the plan of shops operation should be well - conceived. 4th, the schedule plan should be reasonable. 5th, to ensure the accuracy of monitoring information

    針對這種具體情況,所設的小批量訂貨型生產與生產監控體系在實施生產與監控時做到五點: 1 、要保證生產進度計劃的權威性; 2 、要保證物料需求的及時性; 3 、要保證車間作業的周密性; 4 、要保證日程的合理性; 5 、要保證監控信息的準確性。
  9. 4 schedule development ? analyzing activity sequences, activity durations, and resource requirements to create the project schedule

    編制進度計劃分析工序順序、工序持續時間和資源需求。
  10. On some projects, especially smaller ones, activity sequencing, activity dueation estimating, and schedule development are so tightly linked that they are viewed as a single process ( e. g., they may be performed by a single individual over a relatively short period of time )

    在某些項目中,特別是小項目,工序順序、工序工期和編制進度計劃緊密結合,可看成是一個過程(例如,可以由一個人在短時間內完成) 。
  11. Aiming at the concrete need in srttep construction and embodying the managing theory of the combination of the prearranging programming and comprehensive control, the article proposes the cpm - based schedule operating program of srttep on the basis of the relationship among schedule program, cost and quality which thus realizes the close combination of schedule program and project control ; based on the comparative analysis of experience estimation method, factor estimation method, wbs estimation method and comparison estimation method, the cost controlling strategy is worked out that attaches importance to the srttep cost budget and market economy situation. meanwhile, comprehensive quality management theory is introduced in the project " s schedule program. aiming at subsidiary project bidding, equipment purchase, essential quality inspection, detailed quality insurance system and rules are worked out so as to achieve the goal of high - quality construction of srttep

    ( 3 )針對川塔項目施工建設具體需要,在充分體現項目事前規與全面控制相結合管理思想和所行的項目wbs結構分解基礎上,基於項目? ?費用成本? ?質量三者之間的關系,提出了基於cpm關鍵路線法的川塔項目進度計劃制定方案,實現了與控制的緊密結合;在對比分析經驗估演算法、因素估演算法、 wbs估演算法、類比估算等方法和技術基礎上,制定了側重於預算的川塔項目成本基本規方法,以及結合市場經濟情況的成本控制策略;同時將全面質量管理思想,引入了項目施工方案中,針對子項目招標、設備采購、重點質量監控點等設立了詳細的質量保障機制和細則,以確保達到工程優質建設的目標。
  12. The chapter of project planning is to characterize the main planning sequence of the project : the scope planning - the scope definition - the action definition - the resource planning - the action sequence definition - the action duration - the cost evaluation - the schedule definition - the cost budget - the project planning. in order to deploy the entire project planning, the secondary planning is necessary : the quality planning, the communication planning, the organization planning, the risk planning, and the purchasing planning

    項目介紹了按照范圍-范圍定義-活動定義-資源-活動排序-活動歷時-費用估算-進度計劃-費用預算-項目制定的主順序,結合質量、溝通、組織、風險、采購的輔助過程,完整地制定項目的過程。
  13. Scheduling for construction under fixed risk probability

    基於一定風險水平的施工進度計劃研究
  14. If no such time is stated in the appendix to tender, the employer shall give the contractor right of access to, and possession of, the site within such times as may be required to enable the contractor to proceed in accordance with the programme submitted under sub - clause 8. 3 [ programme ]

    如果投標函附錄中未註明時間,則僱主應在一合理的時間內給予承包商入現場和佔用現場的權利,此時間應能使承包商可以按照第8 . 3款進度計劃提交的進度計劃順利開始施工。
  15. For the elevation of the scientification and rationality of the construction organization designment and construction management in the modern construction projects, an computer aided design system of integration of construction schedule and layout drawing has been researched and developed in this paper. with this cad system we can realize the layout of the drawings and the compiling of the construction schedules separately, and also this system can used to exchange the data between the two separate systems, and then they can express each other

    為了提高現代建築工程項目施工組織設和施工管理的科學性和合理性,本文以電廠建設工程項目為例研究和開發了集成化的施工進度計劃和施工布置的算機輔助設系統,利用該系統不僅可以獨立的實現施工布置和施工進度計劃的編制,而且可以利用開發的自定義文件行這兩種系統的數據交流和表達。
  16. Study on the method of data warehouse project schedule development

    數據倉庫項目進度計劃編制方法研究
  17. According to the procedure of activity definition - - - activity ordering - activity time estimating - working out schedule plan - control of schedule plan, schedule plan should be established, which is used to control the whole process. in additional, project time management should be brought to objective management system

    按照項目活動界定? ?項目活動排序? ?活動時間估? ?進度計劃編制? ?進度計劃控制的程序,制定出項目進度計劃,據此行過程式控制制;並將項目時間管理納入目標管理體系。
  18. At the present time, there are some kinds of project management software. these software try to perfect the highway engineering project management from the drawing up of tempo planning, the controlling of the tempo and cost to the analysis of the practical tempo at the angle of economy type

    目前已有多種項目管理軟體,力圖從實用的角分析在工程項目管理過程中,從進度計劃的編制、、費用控制、實際分析等方面完善公路工程項目管理。
  19. Use the relevant background information to put together a project charter

    運用相關背景資料編制項目實施進度計劃
  20. Use the project tools such as the project charter, network diagram, gantt chart, risk management and issue resolution worksheet, to monitor project implementation and deal with changes and issues requiring resolution

    運用項目管理手段,如項目進度計劃表,網路圖,柱狀圖,風險管理與決策實施清單,跟蹤檢查項目的實施情況,落實項目變更管理,並對相關問題行決策