進氣接頭 的英文怎麼說

中文拼音 [jìnjiētóu]
進氣接頭 英文
pressure connection
  • : 進構詞成分。
  • : Ⅰ名詞1 (氣體) gas 2 (空氣) air 3 (氣息) breath 4 (自然界冷熱陰晴等現象) weather 5 (氣味...
  • : Ⅰ動詞1 (靠近;接觸) come into contact with; come close to 2 (連接; 使連接) connect; join; put ...
  • 進氣 : air admission; admission; inlet; onflow; charging; access of air; admittance; air in; air intake;...
  • 接頭 : 1 (連接起來) connect; join; joint 2 (找人聯系) contact; get in touch with; meet 3 (了解情況...
  1. Comprehensive study indicates the dark, 50 - 300 m thick upper permian series, which is rich in the organic material ( om ) and biota, is beneficial to formation and protection of petroleum and natural gas. moreover the stratigraphy possess with better reservoir ability. the reservoir distributed in shallow glacis along beichuan tongkou - guangyuan changjianggou, he 12 well - she 1 well - jiange - cangxi yongningpu - long 4 well - bian 1 well in wujiaping stage and in platform edge beach along beichuan tongkou - jiangyou shuigentou - jiange - cangxi yongningpu - nanjiang

    綜合以上,本文認為研究區上二疊統地層厚50 ? 300m ,顏色較深、生物含量多、富含有機質,並且該套地層自形成后,大多直入埋藏成巖環境,是一套十分有利於油的形成與保存的地層;同時該套地層的局部層段具有一定的儲集性能,在吳家坪期儲層主要分佈在北川通口?廣元長江溝、河12井?射1井?劍閣?蒼溪永寧鋪?龍4井?扁1井一帶,在長興期儲層主要分佈在北川通口?江油水根?劍閣?蒼溪永寧鋪?南江一線。
  2. Isolating joints ready for installation into service pipes in gas and water supply ; built - in - isolating joints ; requirements and tests

    宅供和供水管路安裝用商品絕緣.要求和檢驗
  3. A contemporary twist on the aristocratic ( and narcissistic ) oil portrait above the mantel, the artwork consists of a motion - activated video camera affixed to a large flat - panel television and a computer, tracking and displaying the movements of whatever passes by : underdressed masters of the house, delivery people, ex - wives

    這件藝術品是把壁爐架上方兼具貴族息與自戀傾向的油畫肖像行具當代精神的改造,它包含一臺靠感應動作啟動的攝影機,攝影機再與大型平面電視及電腦連,能追蹤並顯示任何通過鏡前方的物體,例如衣著隨便的屋主、送貨的人、諸位前妻。
  4. With an introduction of the influences of the final quality of rail aluminothermic welding, such as : the quality of welding kits ( esp. the portion ), the result of pre - heating, the welding operation and the level of operators etc., this paper analyzes some problems when rail welding under special conditions

    摘要介紹了焊材料質量、預熱效果、操作人員水平等因素對鋼軌鋁熱焊質量的影響,以及幾何誤差不同、軌寬度不等、寒冷候等特殊條件下行鋁熱焊應注意的問題。
  5. It has the advanced radial technology and the movement path likes 11 pieces plum blossoms shape, this machine uses a head screw pole to go up and down to control the power head, it has the enlarged bench, and air current double - direction adjusting valve to controlled the riveting speed effectively. the electricity system added the counter to count the work piece which was be processed, he time relay control the riveting times

    Jm3tq - d是汽動類小型徑向鉚機,與jm3tq - b和jm3tq - c相比,提高最大工作行程到40mm ,除應用有國際先的11瓣梅花徑向鉚技術外,該機採用部絲桿升降粗調,加大了工作臺面,路加裝雙向調節閥,有效控制鉚速度。
  6. The basic point of the russian policy lies in realizing that carries on the strategy of military confrontation with u. s. a., expand the soviet union s sphere of influence in the far east timely, make every effort and prevent from and the direct military conflict take place with u. s. a. in case of not doing a good job of the adequate preparation yet in the soviet union

    蘇聯政策的基點在於實現與美國行軍事對抗的戰略,不失時機地擴大蘇聯在遠東的勢力范圍,但在蘇聯本身尚未做好充分準備的情況下則力求避免與美國發生直的軍事沖突。中國政策的基點在於保證剛剛成立的新中國的穩定和發展,但在迫不得已的情況下,以大無畏的革命概不惜與世界號強國兵戎相見, 「抗美援朝,保家衛國」 。
  7. Air inlet air hose

    進氣接頭尺寸pt
  8. While the speed is very large, the fuel - air mixing behind the airstream is decreased and the span that the fuel flow in the second combustor is reduced, so the combustion efficiency is decreased, h ) if the fuel streams impinge with the airstreams directly at the air - inlet exit, it make against increasing the combustion efficiency, i ) increasing air - to - fuel ratio within proper range can increase the combustion efficiency

    增加燃噴射速度有利於增強迴流區強度,部燃燒溫度上升,但速度太大則會減弱燃同空道下游的摻混燃燒,減少燃在室內停留時間,燃燒效率降低; 8燃射流與空流在道出口直撞擊不利於燃燒效率的提高; 9在適當范圍內增大空燃比能顯著提高燃燒效率。
  9. Air pessure air inlet air hose

    進氣接頭pt
  10. Air hose air consumption

    進氣接頭pt
  11. Air inlet air

    進氣接頭pt
  12. Air hose air

    進氣接頭pt
  13. The simulations results show that the average combustion temperature is much lower in fuel - rich state and little higher in oxygen - rich state near the best o / f ratio. by extending the post - chamber length the oxidizing gas and the fuel pyrolytic gas can burn completely and the average combustion temperature can be prominently increased. the fuel - rich recirculation zone close to the head of combustion chamber is very important for the combustion

    計算結果分析表明:發動機在富燃狀態下平均燃燒溫度偏低,在近理想配比的富氧狀態下平均燃燒溫度有所提高;加長補燃室可以大幅度提高發動機的平均燃燒溫度,並促氧化劑體和熱解體的充分燃燒;燃燒室部的富燃迴流區對發動機的燃燒非常重要,去掉燃燒室部突擴段后,氧化劑體和燃料熱解體不能充分燃燒,發動機的平均燃燒溫度大幅下降。
  14. To address the regional air pollution problem, the environmental protection department ( epd ) of hong kong and the environmental protection bureau of guangdong province conducted a joint study on regional air quality during 1999 - 2002. the aim of the study is to analyse the relative significance of different industrial and commercial sources of pollution and their direct and indirect impacts on regional air quality so that air pollution control measures can be prioritised accordingly

    為解決區域性的空污染問題,在一九九九年至二二年間,香港環保署聯同廣東省環保局行了一項區域空質素研究,分析各工商業污染源的比重以及對區域空污染的直和間影響,以助訂立污染管制措施的優先次序。
  15. Since then, the mission operations team at nasas jet propulsion laboratory in pasadena, california, has run through nearly all its backup plans to try to contact the probe

    此後,團隊作戰使命美國宇航局帕薩迪納噴實驗室,加利福尼亞貫穿幾乎所有的備份計劃嘗試觸探
  16. Jm6tq is developed in foundation of jm6t, its adopted the advanced radial technology, the motion path of riveting - head resembles 11 pieces plum blossom s shapes. the ascend and descend of power head by screw pole and it can control the rough adjust effectively, and micro - adjust by screw cap of power head, the center hole of bench are coaxial with the spindle, and it put the holder available, and added the aerosol lubricate system in the air current it has the function of filter

    Jm6tq動是在jm6t基礎上發展而來的動z中小型徑向臺式鉚機,除應用有國際先的11瓣梅花徑向鉚技術外,該機應用有國際先的徑向鉚技術外,同時採用絲桿升降式工作,臺面具有夾具梯形槽,工作臺中心孔徑與主軸軸線同軸,可用於夾具定位。
  17. When install the connector box, fixed the cable ends into line to avoid cable twist ; fixed cable strengthen pieces including metal - strengthening core and metal outer security layer to ensure no electric connectivity

    安裝盒時,固定好兩端線光纜,避免光纜扭動;固定光纜加強件,包括金屬加強芯和金屬外護層,確保電不連通。
  18. Step motors ; mounting dimensions, type plate, electrical connection

    電機.安裝尺寸銘牌電
  19. The unit shall be equipped with a standard 120v plug - in cord. electrical heating elements shall be screw - in, direct - immersion, stainless steel sheathed, resistance - type. element operation shall be controlled by a thermostat

    這種熱水器應該配置一個標準的120伏插電纜。電加熱元件應該螺紋擰的,直浸入式,不銹鋼外層,電阻型加熱元件。加熱元件的工作應該由一個溫控器控制調節。
分享友人