進水位 的英文怎麼說

中文拼音 [jìnshuǐwèi]
進水位 英文
gate location
  • : 進構詞成分。
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名詞1 (所在或所佔的地方) place; location 2 (職位; 地位) position; post; status 3 (特指皇帝...
  • 水位 : stage; water level
  1. The article is based on nation nature science foundation of china, " biogeochemical cycling of pollutants in complex environments of tidal flats in the yangtze estuary " ( no. 40131020 ). the author chose open tidal flat of dong tang chongming yangtze estuary as research object and set up typical section plane so that under the good condition, the author measured hydrology element, total nitrogen and total phosphor index

    本文依託國家自然科學基金重點項目「長江口濱岸潮灘復雜環境條件下物質循環研究」 (批準號: 40131020 ) ,選擇了長江口崇明東灘敞開型潮灘為研究對象,設置典型斷面,在平靜天氣條件下,實測了文、地球化學要素,獲得了、流向、流速、 tn及tp等指標6000多個實測數據,著重對長江口潮灘動力過程、 tn和tp的動力輸移過程行研究。
  2. The company is located in harbin binxi economic development zone, hheilongjiang province. three cement production lines of new dry method, with the international advanced level and a daily chamotte output of 5000 tons, are to be put into production respectively in 2005, 2006 and 2007. the total investment reaches rmb 2billion and the annual outpit of high - standard superior cement will be 6 million tons

    公司於黑龍江省哈爾濱賓西經濟開發區內,新建三條具有國際先平的日產熟料5000噸新型干法泥生產線,分別於2005年、 2006年、 2007年投產,總投資為20億元,年產高標號優質泥600萬噸。
  3. At first, this paper analyzes the factors of water - sand influencing water level of yellow river and the feasibility just using the factors of water - sand to study water level, and collects the corresponding data ; secondly, because there are strong nonlinear relation in the corresponding data, by meticulous theory analysis, this paper integrates basic nonlinear analysis method, theory of random analysis, method of least squares and so on. it puts forward a method which can get the high accuracy simulation of the data, perfects the multi - factor analysis of variable ( over three factors ) of the statistic ; thirdly, it applies the method to the approximation of corresponding water level process which belong to the capacity of sand of middle - high and middle - low, and get the high - accuracy simulation about the typical nonlinear relation ; at last, this paper definitudes the main influence mode that the capacity of sand. it mainly unite with other factors to work on the water level in the yellow river lower reaches ; mor eover, this paper analyzes the difficult point and the direction of improvement to realize the accuracy forecasting of the flood level of erodible - bed channel

    首先,系統分析了影響黃河沙因素,及僅用沙因素有效研究的可行性,並按變量對應思想採集它們的相應數據;其次,由於相應過程數據中含極強的非線性關系,本論文經細致的理論分析,將基本的非線性分析方法、統計建模方法、隨機分析理論、最小均方誤差原則等等數學理論及方法有機揉合,提出了能有效實現這類數據高精度擬合的分層篩選法,並改了統計學中多因子(三個以上)方差分析法;再次,將這一方法用於黃河中高及中低含沙類洪相應過程的擬合,實現了這一典型非線性關系的高精度擬合,各年汛期上下游相應洪過程的擬合誤差都較小;最後,明確黃河下游含沙量對的主要影響方式,即含沙量主要是與其它因素聯合對作用;另外分析了要實現變動河床洪過程準確預報的困難所在及改方向。
  4. For jiangpinghe double - curved arch dam, 3 - d elasto - plastic fem is made, in which the point safety factors of the dam - abutments system and the safety margin for coefficients of sliding resistance on 7 potential sliding blocks of the dam before and after the reinforcement of the dam are calculated under the conditions of the normal storage level and the design flood level respectively based on the results from the analysis made with fem

    摘要對江坪河雙曲拱壩行了三維彈塑性有限元分析,利用有限元應力成果分別計算了正常蓄、設計洪等3種工況下加固前後壩體壩肩系統的點安全系數和7個可能滑動塊體的抗滑富餘系數。
  5. Some researchers have made study on this subject, such as the generation and evolution of frazil ice, shore ice, bottom ice, ice cover and ice jam, the resistance of freeze - up river, flow capacity and variation of water stage

    國內外一些學者通過原型觀測,試驗和數值模擬的方法對內冰,岸冰,底冰,冰蓋和冰塞的生成和演變,封凍河道的阻力、過流能力和變化等有關問題行了研究。
  6. Besides, the sedimentary facies of upper ganchaigou and lower ganchaigou formation were also mapped in supersequences which are the main target strata for exploration. the high resolution sequence stratigraphic framework showed the genetic relationship between the distributions of sedimentary facies and their tectonic settings. the near - source sedimentary systems such as subaqueous alluvial fan and lake - floor fan are often deposed in rise - hemicycles in the steep slope background in the north, the coarse lithology of fan - delta prograded from north to south in fall - hemicycles, and the braided stream facies are formed in the rise - hemicycles in gentle slope background in the south, braided stream facies prograded from sorth to north in the fall - hemicycles, but the lacustrine facies and salt lake facies developed in the middle part of the area

    詳細的沉積相研究發現,紅獅地區第三系發育有沖積扇、下沖積扇、河流、三角洲、扇三角洲、湖泊和湖底扇7種主要沉積相類型,並對作為區內主要勘探目的層系的下乾柴溝組和上乾柴溝組行了以超層序為單的沉積相平面編圖,以較高的時間解析度揭示了區內沉積相帶的平面展布及其在不同構造背景中的分佈規律,比如在北部的凹陷陡坡背景下,上升半旋迴低期通常發育有下扇、湖底扇等陡岸近源特徵的沉積體系,下降半旋迴高期,扇三角洲相粗碎屑巖由北向南積;在南部的凹陷緩坡背景下,上升半旋迴主要發育辮狀河流相,下降半旋迴辮狀河三角洲相由南向北積;而中部紅柳泉一獅子溝一帶則為湖泊相沉積和鹽類沉積。
  7. This procedure can imitate the single well pumps water the chronometer calculates at all point water level in district declines deep with horary variety ; study the sport law of the rivers ; solve definitely flow draw water issue wanton boundary the wells of termses, predict that dives under water in the location, guide and construct and excavate the progress, appraise the rationality of the precipitation scheme

    此程序可以模擬單井抽時計算區域各點降深隨時間的變化,研究流運動規律;求解任意邊界條件下的井定流量抽問題,預測潛,指導施工開挖度,評價降方案的合理性。
  8. This model of electromagnetic valve has the single - way check function and a patent design of block - up resisting and is the ideal self control valve for the water supply system with a high level container or tank or the automatic water supply system with a high level container or tank or the automatic water supply facility required the function of adverse current prevention. the amalgamation inflicts to hike in the inflexions of can percolation function that purge

    Fcd . 3 148f :口與出口均為4分15外螺紋銅接頭該型電磁閥具有單向止回功能,專利防阻塞設計,是高容箱器供系統或其他兼需防逆流功能的自動供設備的理想自控閥門;並增加了過濾裝置。
  9. Through synthetically study, some achievements are made as follows : 1. based on the application of sequence stratigraphy, for the first time the characteristics of sequence stratigraphy in the xicheng concentrated mineralization area are discussed systematically and 13 three graded imperfect sequences of devonian stratum are recognized. the result shows that hydrothermal sedimentary mineralized type and hydrothermal sedimentary - rebuilded mineralized type ore deposits occur in intergrade between two sequence, as well as occur in intergrade between highstand systems tract and transgressive systems tract

    通過對該區礦床成礦作用的綜合分析研究,取得了如下一些成果和認識: 1 )應用層序地層學理論,首次系統論述了該區泥盆系層序地層的特徵,識別出13個不完整的三級層序,並行了區域對比。層序地層分析發現海底熱沉積型礦床和海底熱沉積-改造型礦床的賦礦部是兩個層序的過渡部,既高體系域向海侵體系域過渡。
  10. During the adjustment. it decided the amount and the rate of humidification. the system can test the states of water level by water lever sensor, thereby the main control module can control the entrance and drain of water and give warnings ; as its good man - machine interaction, the system can expediently set the humidity and the amount of humidification and control water - in valve and leading winds through control panel. the system can communicate with computer thereby the net supervise is enabled

    本系統主要能夠完成以下功能:採集空氣中的濕度狀態,並送入主控模塊,主控模塊根據現有的濕度判斷是保持原來狀態還是行加濕以及加濕量的大小和加濕速度等;能夠通過傳感器測試的狀態,從而通過主控模塊控制、排、預報警、報警等;具有良好的人機交互性,能夠通過控制面板比較方便地行濕度設定、加濕量設定、閥的控制、導風的控制等;能夠和上行通信,從而實現網路監控。
  11. Firstly, the status of our nation ' s water resources, flood and arid hazards is overviewed to illustrate the necessity for study on dynamic control of flood season limited water level. disadvantages in traditional limitsd water level design, static control of limited water level design, static control of limited water level and fuzzy limited water level curve are pointed out, and mending methods for these are introduced. dynamic control and its key problems are analyzed hi next section. the allowable range of limited water level is determined, so as the allowable extreme risk index. the definition of extreme risk is re - illustrated, risk analysis methods in reservoir operation is discussed either. according to the definition of extreme risk rate, the allowable extreme risk rate of reservoir is systematically demonstrated with variant extreme risk indexes and flood season limited water level

    本文首先闡述了我國資源狀況和旱災害、說明庫汛期限制動態控制研究的必要性;介紹了傳統汛限設計、汛限靜態控制、模糊汛限過程線存在的問題及其初步改方法;分析汛期限制動態控制的方法及關鍵問題;一步闡述了庫極限風險率的定義;根據極限風險率定義,詳細敘述了不同極限風險指標時、不同汛期限制下起調,庫所能承受的極限風險率計算方法。然後,基於極限風險率計算方法,以白石庫為背景,研究「考慮壩體自身安全、考慮壩體安全與下游防護對象控制下泄流量的汛限動態控制的極限風險率」 。
  12. Boats going over the overflow weirs ; access when water levels fluctuate leaving steep banks

    如何在下降而堤岸外露情況下,仍可安全塘范圍;
  13. Thedevelopment development hydraulic jack, the bearing heater, thebearing get up pulling out, the hydraulic pressure spanner, thehydraulic pressure pulls a horse, the hydraulic pressure small crane, nut broken cutting, the oil filter machine and the pipe bendingmachine and so on the advanced practical mechanical and electricalservice product has the world advanced level, the product and thetechnology widely applies to domain the and so on electric power, petrification, chemical industry, metallurgy, mine, spinning andweaving, papermaking machinery service department and the machinemanufacture unit, and in the daya bay nuclear power station, beijingsteel corporation, wuhan steel corporation, the baoshan steelcorporation, the daqing oil field, the victory oil field, the golmudoil field, the three gorges power plant, yangzi petrifies, qi and lupetrifies and so on in the national large and middle scale enterprisesand the project the comprehensive promoted use

    研製開發的液壓千斤頂,軸承加熱器、軸承起拔器、液壓扳手、液壓拉馬、液壓小吊車、螺母破切器,濾油機和彎管機等先實用的機電維修產品有世界先平,產品和技術廣泛應用於電力、石化、化工、冶金、礦山、紡織、造紙等領域的機械維修部門和機械製造單,並在大亞灣核電站、首鋼、武鋼、寶鋼、大慶油田、勝利油田、格爾木油田、三峽電站、揚子石化、齊魯石化等國家大中型企業和工程中全面推廣使用。
  14. Abstract : the qiantang estuary with violent hydrodynamic conditions is well known for its tidal bore. the regulation of the estuary in the past, especially the progress since the founding of new china are reviewed. the principles of the regulation and planning of the qiantang estuary formulated in 1960s are expounded, i. e., to narrow the river to reduce the tidal prism, and to increase the ratio of the river flow to tidal discharge. the experience of estuary regulation / reclamation is summarized, especially the engineering measures to protect the groin head and to use polder dykes as sea defense works. finally, the effect is analyzed of the large - scale constraction / reclamation in the estuary on the tides, flooding high water level, estuary bed and the northern deep waterway in the hangzhou bay

    文摘:以涌潮聞名的錢塘江河口,動力強勁,破壞力極大.回顧錢塘江河口歷代治理情況,重點記述1949年以來治理工作的展,論述60年代提出的錢塘江河口治理規劃的指導思想,即縮窄江道,減少潮量,增大山潮比值的整治原則.總結整治規劃實施過程中治江圍塗經驗,特別是「以圍代壩」和丁壩壩頭保護等工程措施.分析錢塘江河口大規模治江圍塗后對錢塘江河口潮汐、洪、河床以及杭州灣北岸深槽的影響
  15. It was specially pointed out that, when the tail water is constant maximum tide, the computed flood surface is higher than that of nonsteady current, so there is some safety superelevation. underestimation of the roughness will make downward bias to compute along - river surface and bring hidden trouble for flood control. to improve the section can decrease the water level or offset the water rise for increase of floodplains " roughness, but it need much engineering works

    特別提出,按照恆定流計算出來的設計比非恆定具有一定的安全儲備;而對于灘地糙率的低估又會造成設計的偏低,給防洪工作帶來隱患;如果利用改斷面形式來降低或彌補糙率增加帶來的抬高,需要較大的工程量,所以平時應注意灘面的減糙管理工作。
  16. By modeling of " y " - shaped junction of the compound river channel with an intersection angle 90, the flow velocity and water level at the junction were obtained by use of the acoustic doppler velocimeter ( adv ) and point gauges

    摘要通過製作交匯角為90的復式斷面河道" y "型交匯河口模型,利用三維聲學多普勒流速儀( adv )和測針獲取流速及數據,對支流河口處的流流態包括面形態、流流速和流分區行分析。
  17. The goal is to control the water outlet temperature by manipulating the flow rate of the steam and control the water inlet rate by manipulating the height of the water level in the water tank

    本文中,換熱器的控制任務主要有兩個,首先通過控制閥門開度,而控制而控制換熱器流量。
  18. The flow behavior of resin, water outlet structure at bottom of the mixed bed, water inlet position of hydraulic transportation, water intake ratio, and pneumatic transportation etc. have been analysed, giving out optimal selection of them combined with reality in the field

    對樹脂的流動性能、混床底部出結構、力輸送進水位置、比例以及氣力輸送等行了分析,並結合實際給出了最佳選擇。
  19. Through the analysis of hydrological yeologys features by analyzing the gielding water of mining section, the critical value of waterhead, the critical thickness of water - resisting layer and othr hydrological geology factors concerned, the researches on the feasibility of the extraction of eastern mine area liyi mine at - 660m under ground with the menance of high - level limestone water have been done

    主要通過文地質特徵分析,從采區涌量、臨界頭值及臨界隔層厚度及相關的文地質因素對李一礦- 660m平東翼采區在高灰巖威脅下開採的可行性行了研究。
  20. Water body is shallow and sediments are coarse in lst and hst, but in tst, being deep and fine

    體系域和高體系域體較淺,沉積較粗,而湖進水位域則體較深,沉積較細。
分享友人