運垛機 的英文怎麼說

中文拼音 [yùnduǒ]
運垛機 英文
cock lifter
  • : Ⅰ動詞1 (物體位置不斷變化) move; revolve 2 (搬運; 運輸) carry; transport 3 (運用) use; wield...
  • : 垛名詞1. (扶垛) buttress2. (城垛) battlements
  • : machineengine
  1. Brief introduction the model kx920 wheel is one of the series leading products made in our works that is well received both at home and abroad for its reaso - nable design, beautiful contour, and advanced norms. by adopting of three - ele ment torque converter, fixed - axle type pcwer shifing transimission box, in = bub reduction, double - axle drive, hinged frame, all hydraulic steering, and clamping brade. the loader has such features as : large power reseve, fi - neaccelerating performace, comfortable operation, wide field of vision, it " s muti = function, high - effic ient and flexible engineering machinery. mor - eover, it can be equipped with many kinds of working attachments such as flat fort, muti - fnction bucket, and snow plow, so it may be used for loading and unloading, transporting, piling and leveling materials in various kinds of projects. mines, enterprises and city. welcome friends both at ho - me and abroad to visit our factory and to order our products

    Kx920裝載是我公司生產的系列主導產品之一,該設計合理,外形美觀,指標先進,在國內外享有盛譽.它選用三元件液力變矩器,定軸式動力換檔變速箱,輪邊減速,雙橋驅動,鉸接式車架,全液壓轉向,汽液鉗盤式四輪制動,手動鉗盤式停車制動,反轉連桿構,動力儲備大,加速性能好,駕駛舒適,視野寬廣,是一種用途廣,效率高,動靈活的工程械.備有平叉,圓木叉,多用途斗,推雪板,側翻,抓草等多種工作裝置,因此廣泛用於各類工程,工礦企業和城鎮的物料,垃圾裝卸,輸,堆,平整等作業,歡迎國內外朋友們來公司參觀,選購
  2. The paper discusses the operational characteristics of warehouse and gives a common order picking optimal algorithm for travel salesman problem

    摘要分析了自動化倉庫堆揀選作業的行特點,給出了堆揀選作業旅行商數學模型的常用優化演算法。
  3. Of course, this is based on my practices in zhengduo - zhai. and the recoustruction of house - settlement in rongshui is a complex system. its succeed is not only the improving of housing condition and living environment, but also the great change of concept

    第一部分論述了融水木樓集落改建的制及其意義,以筆者親身參與的部分以及整寨的實踐為主,指出融水的民居改建是一項龐大的系統工程,其成功不僅在於居住條件和居住環境的改善,而且伴隨著觀念上的深刻變化。
  4. In the paper, the situation and method of scheduling problem studied of automated warehouse are surveyed completely. the problems of automate guide vehicle transport and stack crane picking order are analyzed deeply in parcel post automated warehouse, basic mathematic model of scheduling is set up

    通過對郵包自動化倉庫系統中的自動導引小車輸問題和巷道堆的揀選順序認真地分析,建立起了調度的基本數學模型,提出了用總的空載時間作為目標函數,並且把這兩類問題都歸結為求解旅行商問題。
  5. ( 3 ) in connection with the agv system of 101 automatic logistics system runs in a low efficiency. according to the path programming principle, using over - all planning method, this project will study and plan the agv moving path, this project will study, improve the agv dispatching management method and discuss the sub - materials management questions thoroughly to make the agv system run well. ( 4 ) in connection with the as / rs system runs in a low efficiency and wastes end - product questions, we will think of adding frequency principles to the research of stacking model to make the stacker run in a high efficiency. through studying, analyzing and comparing methods, this make the machine carry materials safely, steadily and reduce wastage

    ( 4 )針對101自動化物流系統中as / rs系統行效率低、成品損耗嚴重的問題,首先在庫存模式的研究中考慮新增頻次原則,以此來提高堆行效率,而對輸送系統則通過研究、分析,用比較的方法,並進行更換鏈條或各種改進以達到輸送物流平衡、穩定、降低損耗;又對as / rsecs和倉庫管理系統( ims )各項功能的完善以及改進,以實現操作便捷,達到節省時間,提高工作效率的目的。
  6. Abstract : combining the running status of high - rise warehouse of dongfeng automobile destribution bureau, we designed the three - level timely computer supervising control system and the automatic control system of aisle stacking crane

    文摘:結合東風汽車公司配套處立體倉庫的行狀況,在調查研究的基本上,設計了立體倉庫的3級計算實時控制系統及堆控制系統。
  7. This paper discusses structure and feature of the crane traveling mechanism of a 1. 5t bridge type stacking crane at a warehouse, analyzes the existing problems and makes improvements to it referring to overhead traveling crane traveling mechanism

    摘要分析了某廠倉庫1臺1 . 5t橋式堆大車構的結構、特點、存在的問題,並參考橋式起重大車構對其進行技術改造。
  8. The moving process of a certain single mast stack - crane was simulated and analyzed with multi - body system method

    摘要以某型號單立柱有軌巷道式堆作為研究對象,用多體系統方法對其行過程進行模擬分析。
  9. Agv ( automated guided vehicle ) optimization is a typical np problem, in the course of initial group generation, this article applied accumulator process, crossover operator based continuous insertion heuristic mode, and push - connect - exclude method. according to stacker running process and characteristics, stacker optimization was devided into two parts, the first one was shelves number optimization, the second one was travel scheduling problem. finally, this article written genetic algorithm program based on c

    Agv的優化調度屬于典型的np問題,在初始群體的產生中,採用聚加過程,並建立了可行插入的條件;提出了基於連續插入啟發式的交叉算元;採用了推?銜接?排除過程來使任務的滿意度達到最佳;針對堆行過程,建立了數學模型,並依據其行特點,把堆的優化分為兩部分,一是針對庫位號的優化,改變傳統的庫位號排列方式,利用遺傳演算法建立起比較合理的庫位號排列順序;二是把堆行線路簡化為旅行商問題,並做了適當的修改。
  10. Then the hoist motor of the stacker crane is controlled successfully by the vvvf speed regulation and the better orientation precision and running speed of stacker crane are expressed in the practice

    通過實際系統的行和調試,堆的提升控制系統在控制中獲得了更高的定位精度和更快的行速度。
  11. In accord of layout precept, this paper conduct activity process layout and realizing project, mainly included : in and out warehouse, handling, checking, supplement and returning goods, distribution etc. in the fifth chapter, it introduces principle of equipments option of logistics center and technic parameter of storage equipments, handling equipments, conveyer system, and analyse activity capacity of palletizer and in and out conveyor, and bring forward some requirement on assist fixtures

    根據規劃方案,提出了物流中心的作業流程規劃及實現方案,主要包括:入庫、出庫、搬、盤點、補貨、退貨、配送等作業流程。在第五章,介紹了物流中心設備選型的原則,儲存設備、搬設備、輸送系統的技術參數,對堆和出入庫輸送的作業能力進行了分析,並對輔助設施提出了設計要求。
  12. The control strategy of hoist system of stacker crane is studied. through reliability analysing of control system of hoist, comparison of running and fork movement system, the weakness of controlling methodology of hoist system is found and then creates the improving model and the proposal of controlling system of hoist, in which use ac vvvf speed regulation instead of variable speed regulation, so as to get the stacker crane with better orientation precision and running speed

    通過對堆的提升控制系統進行可靠性分析,對比行駛和伸叉控制系統,找出提升控制系統中控制方法最薄弱的環節,建立了提升控制系統的改進模型,提出了提升控制系統的改進方案,對堆的升降電控制採用交流變頻調速方法,代替原系統中提升電的變級調速控制,以使堆在升降時獲得更高的定位精度和行速度。
分享友人