運河工程 的英文怎麼說
中文拼音 [yùnhégōngchéng]
運河工程
英文
canal project- 運 : Ⅰ動詞1 (物體位置不斷變化) move; revolve 2 (搬運; 運輸) carry; transport 3 (運用) use; wield...
- 河 : 1 (天然的和人工的大水道) river 2 (指銀河系) the milky way system; the galaxy 3 (特指黃河) t...
- 工 : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
- 程 : 名詞1 (規章; 法式) rule; regulation 2 (進度; 程序) order; procedure 3 (路途; 一段路) journe...
- 運河 : canal
-
At an the forry ahp atall i6 op1ied to the taizha - - ytheiap be. in the mess of oplication, the atic1e cnis the bew methed wtth the twic ateraitw mess to solve ch weight, nd cbothes the fuzry statistics wtth the bebo meed to deted boion degree of bos
最後將此方法應用於泰州引江河工程的社會評價中,提出了德爾菲與層次分析相結合方法推求指標權重,採用模糊統計與德爾菲法確定指標隸屬度,體現了方法運用中取長補短的原則。From roundwood reservoir in county wicklow of a cubic capacity of 2, 400 million gallons, percolating through a subterranean aqueduct of filter mains of single and double pipeage constructed at an initial plant cost of 5 per linear yard by way of the dargle, rathdown, glen of the downs and callowhill to the 26 acre reservoir at stillorgan, a distance of 22 statute miles, and thence, through a system of relieving tanks, by a gradient of 250 feet to the city boundary at eustace bridge, upper leeson street, though from prolonged summer drouth and daily supply of 12 1 2 million gallons the water had fallen below the sill of the overflow weir for which reason the borough surveyor and waterworks engineer, mr spencer harty, c. e., on the instructions of the waterworks committee, had prohibited the use of municipal water for purposes other than those of consumption envisaging the possibility of recourse being had to the importable water of the grand and royal canals as in 1893 particularly as the south dublin guardians, notwithstanding their ration of 15 gallons per day per pauper supplied through a 6 inch meter, had been convicted of a wastage of 20, 000 gallons per night by a reading of their meter on the affirmation of the law agent of the corporation, mr ignatius rice, solicitor, thereby acting to the detriment of another section of the public, selfsupporting taxpayers, solvent, sound
但是由於夏季久旱,再加上每天供水一千二百五十萬加侖,水位已降到低於排水口。都市監察官兼水道局技官土木工程師斯潘塞哈蒂奉水道局的指示鑒于有可能會像一八九三年那樣被迫利用大運河和皇家運河那不宜飲用的水,除了飲用外,下令一律禁止使用市裡供應的自來水。尤其是南都柏林濟貧院,盡管限定用六英寸的計量器,每個貧民每日配給十五加侖水,然而在市政府法律顧問辯護律師伊格內修斯賴斯的監督下,經查表證實,每夜要浪費兩萬加侖水,從而使院外的社會各階層也就是自費並有支付能力的納稅者們蒙受損害。Investigations on the moving eastward of the grand canal shandong section
京杭大運河山東區段東移工程考Digging the canal was a herculean task
開鑿運河是項極其艱巨的工程。Zhuzhou hydropower junction project is a large - scale project with great capital invested, and the project would impropriate the land and work on the neighborhood environment. especially when the project develops up to a certain degree, the influence would be profound. therefore, the construction and operation of zhuzhou hydropower junction project should be on the basement of sustainable development in order to meet the need of the development of economy, environment and social service
株洲航電樞紐工程是一個規模大、耗資多、影響面廣的大型工程,它以永久性佔用土地、影響環境為代價,特別是內河航道發展到一定程度后,這種影響將更為廣泛,因此,株洲航電樞紐工程的建設與運營應謀求其可持續發展,以滿足工程移民區域及移民安置影響地區目前及將來經濟、環境、社會發展的需求。On irtysh - karaghanda canal water transfer project in kazakhstan
卡拉干達運河調水工程These resources were overstrained in the completion of the grand canal , and in the undertaking of other construction projects, including the reconstruction of the great wall
人民不堪重負,在開鑿大運河、重建長城、修築其他的許多建築等工程中耗盡了體力。During recent decade and more, major and super floods have taken place frequently in the yangtse river and huai river. the natural phenomenon of flooding is inevitable. it is not a surefire plan only to take engineering measures for flood control while climatic variation is far from being known
近十多年來在我國長江、淮河流域連續不斷發生的大洪水或特大洪水再次向我們展示了這樣一個道理,洪水是一種自然現象,當環球大的氣候因素及其變化規律遠未被認識時,試圖僅依靠工程措施來控制洪水並非萬全之策,逐步運用非工程措施,常常能起到「以柔克剛」 、 「以弱勝強」之功效。Dongshen - hong kong water supply scheme to channel dongjiang water to flow southward to shenzhen requires to convert one of the tributaries flowing north to dongjiang - the shima river - into an artificial canal by pumping of water from the shima river from its lower course to its upper course
東深供水工程,引東江水南流至深圳市,需將其中一條原本由南向北流入東江的支流石馬河變成一條人工運河,河水由下游抽回上游,逆流而上,工程因而相當艱巨。Hydropower stations of shiquan and xihe river both lie on the hanjiang river upstream and work in multifunction of irrigation, flood control, water carriage, aquiculture etc. in addition to electric power generation
石泉、喜河水電站位於漢江上游,均以發電為主,兼有防洪、灌溉、航運、養殖等的綜合水利工程。The improved scheme can ensure the south branch to be open to navigation and the flow here not to be broken in low water seasons, and it will have active effect on protecting the south branch and fuyuan town. this study is an attempt of applying three - dimensional mathematical model in analogue calculation and analysis of flow, sediment and riverbed movements in a long river reach. it is very important for the future thorough research, and has great significance for promoting the application of the three - dimensional model to resolve
本研究是三維數學模型對較長河段水流、泥沙、河床運動模擬計算分析的一次嘗試,其對今後進一步深入研究和應用三維模型解決工程實際問題,完善模擬方法、提高模擬水平,真正發揮數學模型其省時、省力、靈活方便和模擬細膩等在研究水沙運動規律和河床變形等方面研究中優勢具有重要的意義。This paper took an example of heibei province installation engineering co. and being instructed by modern project management theory, it systematically analyzes the problems exiting in the construction enterprise in the aspect of the accessory system reform, personnel employing mechanism, responsibility - right - benefit assigning system and supervising - inspection mechanism etc. and based on this analysis, it brings up a comprehensive and whole course project management method. moreover, the method has been put into practice and realized good results
論文以河北省安裝工程公司為對象,運用現代項目管理理論作指導,系統分析了施工企業在配套制度改革、用人機制、責權利分配、考核監督機制等方面存在的問題,在此基礎上,提出了全面、全過程項目管理方法,並將之應用於工程實際,取得了很好的效果。Hong kong s airport was the only asian achiever in a list that included the panama canal, the channel tunnel and egypt s aswan high dam
香港國際機場贏得這項殊榮,是亞洲區唯一可與巴拿馬運河英法海峽隧道和埃及阿斯旺水壩同享殊榮的建築工程項目I also summarized briefly the qualifications for tender agency, factors which would block the development of tender agents and the countermeasures, a nd anticipated the foreground of its development in water conservancy systems of hebei province, and then, i advanced my suggestion on the standardization of tendering and bidding procedures in the relevant projects ; i also analyzed the insufficiencies of decision - making system, documents study and circumstances research in the tenders. at the same time, i introduced the skills and strategies in the tendering and bidding, and advanced my analysis results and suggestions. through the introduction of the procedure from opening to evaluating and deciding the tenders, and the scores registration method on evaluating tenders, i pointed out the status quo and main problems occurred in the tendering and bidding in the construction of water conservancy projects in hebei province, and put forward my suggestion on the system of opening, evaluating and deciding of tender in the projects
在對招標人、招標代理機構和招標過程的法律規定與分析后,指出河北省水利工程建設招標人和河北省工程建設招標代理機構的現狀及存在問題,提出了市場經濟條件下,最合理的招標組織形式為招標代理,並簡述了招標代理機構的資格要求、河北省水利工程建設管理機制中阻礙招標代理機構順利發展因素及對策,預測了招標代理制度在河北省水利系統的發展前景,對進一步規范河北省水利工程招標活動提出建議;對投標過程中存在的投標決策、招標文件研究、投標環境調查不足之處進行了分析,同時介紹了河北省水利工程建設投標報價技巧及策略,對河北省水利工程投標活動現狀及存在問題提出規范化的分析和建議;通過對水利工程開標、評標、定標運行程序和河北省水利工程評標計分辦法的介紹,指出了河北省水利工程建設招標投標定標運行的現狀和存在的問題,提出了河北省水利工程建設開標、評標、定標運行體系的建議。1805 ferdinand de lesseps, french diplomat and engineer, the builder of the suez canal, was born at versailles
法國外交家、工程師、負責蘇伊士運河工程的建築師費迪南?德?雷賽布生於凡爾賽。With an analysis of the project construction and strategic significance, the paper illustrates the impact of the reconstruction of the hang - yong canal on the logistics pattern of eastern zhejiang province, mainly hangzhou, shaoxing and ningbo
摘要在分析杭甬運河工程建設與戰略意義基礎上,論述了杭甬運河的重新改造對浙江東部杭、紹、甬三地物流格局變化的影響。This text is by way of would rather analyses the yellow river hydrology silt characteristic, river course property of ningmeng as well as after the long liu reservoir application to the influence of meng heduan, the importance would rather to have expounded that train in the ning meng river course. by way of analysing the present situation of the ningmeng course river course management and father, and puts forward the major problem that exists, and carries on corresponding countermeasure research be dead against these problems. according to property and the engineering present situation of river course, engineering experience and the correlation theory are used, to renovates the principle and renovates the scheme and the measure has carried on the analysis research of overall system
通過分析寧蒙河段河道整治及河道管理的現狀,提出存在的主要問題,並針對這些問題進行相應的對策研究。根據河道的特性和工程現狀,運用工程經驗及相關理論,對整治原則、整治方案和措施進行了全面系統的分析研究;對整治流量、整治河寬和整治半徑進行了分析和計算;對河道整治工程的幾種結構形式進行了分析和評價;提出了具體的整治措施及工程整體布局;對黃河上的幾種新型結構形式進行了特性分析以及功效評價;最後對寧蒙河段今後治理和研究提出了若干建議,並對前景進行了展望。However, since the contractor has produced a letter from the tung chung rural committee ( tcrc ), claiming that the materials came from the flood protection project for the stream now underway, the consultant considers that before establishing the " non - legality " of the source, there are difficulties in invoking the terms and conditions of the contract to stop the contractor from transporting such materials to the construction site at its own risk and bearing all consequences and liabilities
但由於承建商曾出示一份東涌鄉事委員會發出的信件,聲稱石料乃來自進行中的東涌河治河工程,工程顧問表示在未能確定該等石源是非法前,若根據工程合約條款禁止有關承建商在自負所有可能後果及責任的情?下運載石料進入工地,實存在困難。Shengxian wang : 1991. 8 ~ 1994. 9, assistant engineer, yancheng chemical fiber factory, jiangsu ; 1999. 4 ~ 2001. 9, lecturer, secretary of degree committee in college of material science and engineering state key lab of concrete material research, tongji university, shanghai, china ; 2001, 9 -, senior research scientist, chemical technology lab, ge ( china ) research and development center
姜樂華: 2005至今,主任,國防科學技術大學指揮軍官基礎教育學院渡河指揮系工程裝備教研室; 2002 - 2004 ,博士后,國防科學技術大學機械與電子工程博士后流動站; 2001 - 2002 ,副主任、副教授、碩士生導師,國防科學技術大學工程兵學院機械教研室,學校「十五」學科(載運工具運用工程學科)建設負責人兼學科帶頭人。In this paper, in view of the poor water exchange condition and deteoriorated ecological environment in the two bays, a strategic scheme to excavate an artificial jiaolai canal is proposed, the excavation of artificial canal will link up the jiaozhou bay and laizhou bay so as to speed up the water circulation in the two bays and improve the ecological environment in the yellow sea and bohai sea inshore areas, and the canal project will be advantageous to the shipping industry, tourism, ecological conservation and economic development
文以萊州灣及膠州灣水體交換條件差、生態環境惡化為背景,提出開鑿膠萊人工海河工程的戰略構想,通過開鑿人工海河,貫通膠、萊兩灣,以達到加快兩灣水體循環、改善渤海和黃海近岸海域生態環境的目的,併兼有航運、旅遊、生態、城市及經濟開發之利。分享友人