過壓試驗 的英文怎麼說

中文拼音 [guòshìyàn]
過壓試驗 英文
overpotential test
  • : 過Ⅰ動詞[口語] (超越) go beyond the limit; undue; excessiveⅡ名詞(姓氏) a surname
  • : 壓構詞成分。
  • : 名詞(古代占卜用的器具) astrolabe
  • : 動詞1. (察看; 查考) examine; check; test 2. (產生預期的效果) prove effective; produce the expected result
  • 過壓 : 1 (過電壓) overvoltage2 (過壓力) overtension; overpressure過壓保護 overvoltage crowbar; overv...
  • 試驗 : trial; experiment; test
  1. In the process of work, according to complex geological conditions such as huge thick soft clay in site and top surface of possible pile foundation supporting course fluctuating in large amplitude, we adopted many advanced exploratory methods ( just as high accuracy exploration of shallow earthquake, crosshole wave velocity test, vane shear test, pressuremeter test, etc. ), we found out that there is an ancient groove of yangzi river in former plant site, therefore we suggested in time that plant site should properly be moved eastwardly, only this item saved nearly about 50 million for pile foundation project cost

    在工作程,根據廠址區軟粘土厚度大、可能作為樁基持力層頂面起伏變化大等復雜地質條件,採取了多種先進的勘探手段(如高精度淺層地震勘探、跨孔波速、十字板剪切、旁等) ,查明了原廠址區存在一個長江古凹槽,並及時建議廠址適當東移,僅次一項就節省樁基工程費用近5000萬元。
  2. Analyzed the reason of stress corrosion cracking on u shape brass tube bundle when it is having penetrative test with ammonia, improved technology of test and gave out the method should be paid attention to during the process of brass tube exchanger

    摘要對黃銅管換熱器管束在氨滲程中發生應力腐蝕,導致銅管破裂的原因進行了分析,改進了施工方案,並提出了黃銅管換熱器製造程中對管束進行耐時的注意事項。
  3. Based on extensive investigation of construction technique history of chinese ancient buildings, the structure method, structure developing history and seismic behavior of chinese ancient timber structure buildings are analyzed in several respects of the structural system and form. through a series of experiments on constituent parts of chinese ancient timber building structure, including the tests on the corbels and brackets called dougong subjected to low cyclic reversed loadings, the tests on the wooden frame using the tenon - mortise joints as connections of column and beam subjected to low cyclic reversed loadings, the tests on vibration isolation effect of friction and slippage between column footing and their socle base, and a series of shaking table tests on a chinese ancient timber structure palace building mode under artificial earthquake at serving conditions, destroyed conditions and reinforced conditions, many valuable results of structures such as moment - curvature hysteretic loops of dougong structure and tenon - mortise joints under low cyckc reversed loadings, the static function, the seismic performance, energy dissipation, vibration reduction, energy - loss mechanism, nechanicalmode and failure mode were studied. aplenty of valuable parameters of the structure system were obtained, such as the natural period of structure, vibration modes, damping ratio, factor of vibration isolation, oscillate amplitude of ineitial accebration, velocity and displacement, magnitude of slippage, and the mechanism of structure failure and collapse etc. based on these research, the complete analysis of ancient timber structure under earthquake were carried out in which including mechanism analysis method, calculating mode, strength analysis of members and joints, strengthening methods for serving damaged ancient timber structure buildings were also taken into account

    依照宋代《營造法式》建造了抬梁式殿堂木結構構件及結構模型,對中國古代木結構中的典型構造如:柱腳在礎石頂面平擱簡支、柱架榫卯連接、柱高不越間之廣、側腳、生起、斗拱等的構造機理及結構功能進行了量化分析和實研究: (一)通木柱石礎靜摩擦,測定了柱腳與石礎古鏡面間的摩擦系數及摩擦力隨上部結構荷載變化的規律; (二)通單柱承載力,測定了古建築中木柱的受力變形特徵、破壞模式、及模型材料的變形模量、極限承載力、極限變形等參量; (三)通柱架低周反復荷載,測定了柱架的抗側移剛度、柱架恢復力特性及滯回曲線、榫卯張角剛度及其變化規律、柱架及榫卯的極限承載力和極限變形、及榫卯減振參數; (四)通斗?低周反復荷載和受,測定了古建築木構件與木構件間摩擦系數,斗?抗側移剛度,斗?恢復力特性及滯回曲線,斗?抗極限承載力及受力變形規律; (五)通抬梁式殿堂間架模型振動臺,測定了殿堂木構架結構自振周期,地震反應振形、阻尼特性及阻尼比;按結構分層特點對柱腳、柱頭和斗?層上的屋蓋的地震反應採用多點同步測量,對柱根滑移、榫卯變形、斗?的變形、復位、耗能減振參數等進行了定量分析。
  4. Overload test the current of 1. 15 times rated voltage 96h

    1 . 15倍額定電的電流96h
  5. According to the force balance equations, the values and distributions of bond stress between steel shape flange and concrete in eccentric loading columns were established by statistically regression with experiment data. and the influence of the factors such as relative eccentricity e0 / h, the slenderness ratio l0 / h on the bond - slip properties was analyzed

    利用力的平衡方程,通數據統計回歸,得到了偏柱型鋼兩側翼緣與混凝土的粘結應力的大小及分佈規律,並分析了偏柱長細比、偏心距對其的影響。
  6. Gas permeability tester and mechanical folding device were developed to study the barrier property and deformation failure behaviors. the surface characterization, chemical structure, optical, mechanical properties of pet coated with dlc have been investigated by x - ray photoelectron spectroscopy ( xps ), contact angle measurement, light transmission analysis, nanoindentation and friction wear tests

    x射線光電子譜分析、接觸角測定、光學透率分析、納米痕、摩擦磨損、機械彎折、氣體透,對膜層的表面特徵,光學、力學及氣體阻隔性能進行了系統的研究。
  7. Test results indicated : with the hoist of altitude, the increase of ice amount and the rise of pollutant, the average flashover voltage reduced. the character exponent generally depends on the insulator profile, ice amount, ice state and pollution severity etc. by means of a high - speed camera, a data acquisition system and high voltage test facilities, a series of the flashover processes on ice surfaces were record. the experimental results form this study and the subsequent theoretical analyses suggested : the thermal ionization of the air in front of an arc root resulted in arc movement ; the electrostatic force had an auxiliary effect of impelling arc propagation ; the electrical

    對攝像機、數據採集系統及高裝置記錄覆冰絕緣子表面閃絡電弧的發展程的結果進行理論分析得出:弧根周圍空氣的熱電離導致了電弧的發展,靜電場力對電弧的發展起到了加速作用,電擊穿僅發生在閃絡最終的跳躍階段;通測量閃絡程中的放電電、泄漏電流、閃絡時間、覆冰水電導率、電弧長度及電弧半徑等參數,得到了不同階段電弧(電弧起弧階段、電弧發展階段及完全閃絡)的發展速度、臨界電弧長度均隨覆冰水電導率的增加而減小。
  8. The following conclusions are gained : ( 1 ) the located shear band prongs the ligament near the top crack tip and the structure may occur shear - mode fracture at the angle of 155 ? to crack when load is 87. 92mpa ; the mode of fracture of the flange joint structure is not possible to be void - mode ; ( 2 ) it is proved that loading and then unloading repeatedly can not increase the possibility of invalidation of the structure when the times of loading and unloading are not too more when load is operating pressure ; the structure is safe when the vessel is operating ; ( 3 ) in the fe model of the thesis, not considering the influence of water pressure test which is in the process of fabrication of vessel in fe results in larger deviation in analysi

    得出了以下結論:在8792mpa的載荷下筒體一封頭連接結構處的集中剪切帶貫穿韌帶,可能發生沿與原裂紋線成155 「角方向剪切型斷裂;筒體一封頭連接結構不可能發生韌窩型斷裂; ( 2 )在工作力下進行次數不多的反復加、卸載,結構不會破壞,也不會喪失安定性:結構在工作狀態下是安全的; m在本文的彈塑性有限元模擬計算中,對于裂紋尖端進行力學分析時,不考慮力容器製造程中水的影響,將導致計算結果出現較大的偏差; ( 4 )筒體完全屈服時的載荷為92石3mpa ,封頭完全屈服時載荷為86
  9. Overload examination 1. 15 times current of rated voltage 96h

    1 . 15倍額定電的電流96h
  10. Before and after test the samples were studied by the scanning electorn microscope to analyze and make a comparison between the microstructures, to grasp and reveal the mechanism of the gold transportation deposition and enrichment

    本項工作選擇了該區的礦化圍巖作三軸高溫高,並對前後樣品進行掃描電鏡研究,分析對比微觀組織,研究主要賦金礦物遷移、富集程,從而了解和揭示金的遷移和富集機制。
  11. Finally, use spss analyzing experiment data, the most suitable mix design was gained, and an experience expression about material strength and cement / water ratio was found

    數據的分析,給出了最優配合方案,利用spss證經公式,給出了高強水泥基材料強度與膠水比的經公式以及抗折強度與抗強度之間的線性關系。
  12. Distributes wide range of high productivity equipment. includes inkjet printers, machines for laser marking, pad printing, hot stamping, heat transfer, and welding, and aluminum assembly and automated production systems

    -主要產品有大中小型液泵站液臺各種濾裝置管路油箱及液系統清洗裝置真空凈油裝置加註裝置。
  13. Six circular concrete columns were tested under concentric loading, to investigate the confinement effect of confining reinforcement in both normal strength and high strength concrete columns. test results were analyzed and compared. practical formulas were proposed for the minimum volumetric ratio and the spacing of the stirrups

    對6根圓柱體混凝土柱的軸,研究普通混凝土及高強混凝土在箍筋作用下的約束效應,並將結果進行分析比較,提出了配箍率及箍筋間距實用計算公式。
  14. So far as the mixing material for building the earth - rock fill dam with clay core for shiquanhe hydropower station is concerned, the effect from the variation of the sand content for the filter material on the maximum dry density and the relevant parameters are to be determined within the variation area of the mixing mass ratio of ( 46 ~ 54 ) : ( 54 ~ 46 ) through this experiment, due to the max, dry density is largely influenced by the mixing ratio of both the lifter material and the clay and the sand content of the filter material, so as to determine the actual filling compactness of the mixing material of the core

    摘要由於獅泉河水電站粘土心墻土石壩摻合料的最大幹密度受反濾料與粘土料的摻合比例、反濾料含砂率的影響較大,因此擬通確定摻合質量比在( 46 ~ 54 ) : ( 54 ~ 46 )范圍變化時,反濾料含砂量變化對最大幹密度的影響程度及相關參數,從而確定心墻摻合料填築的實際實度。
  15. Sufficient test data were acquired for investigating the damage and constitutive behavior of concrete. second, according to the fitting of experimental data, the evolution equation of damage is obtained. the main factors affecting the damage development are examined and the causes are expounded

    其次,通結果的非線性回歸分析,得到損傷演化的經表達式,並以此為依據,分別深入地研究了混凝土在經歷常規三軸受和三向等等荷載歷史后,抗強度和抗拉強度隨荷載歷史增加而發生劣化的演化規律。
  16. It can serve as reference material for projects of similar nature, such as compaction test process, results, test equipment and technical methods etc

    工程的碾程、結果,和設備的配置、工藝方法等,可為同類工程參考。
  17. Based on the productive rolling experiments on two material sources of the excavated debris for construction of the downstream side of dam body, the compaction characteristics of the materials are analyzed and the rationality of the related design filling standards are verified, and then the economic and reasonable compaction method, rolling equipments and the construction parameters accorded with the filling standards concerned are recommended as well

    摘要通對下游壩體填築石渣料的兩個料源進行生產性碾, ?解分析其實特性,核實設計填築標準的合理性,推薦達到填築標準的經濟合理的實方法、機械類型、施工參數等。
  18. Based on the roller - compacted test, check on construction and observation during operation, the fill - criteria of the design for the dam is obtained, and then the economic and reasonable roller compacted method, including selection of the roller, mechanical parameters, watering amount for material of sandy gravel etc., is determined as well

    摘要通、施工復核及大壩運行觀測,得到了大壩的設計填築標準,從而確定了經濟合理的實方法,包括實機械選型、機械參數、砂礫料加水量等。
  19. Designed a program which can use the mean pressure coefficient of jin ’ ao mansion to calculate mean wind load of the whole buildings and local floor. the integral result can apply into the practical design of construction, also can compare with the results of wind tunnel balance test to validate the veracity of this test

    自編的程序對金奧大廈表面時均風系數進行積分計算獲得其整體和局部樓層的平均風荷載,積分計算的結果一方面可以方便地運用於實際的建築結構設計中,另一方面可以與風洞天平測力結果進行比較證動態測的正確性。
  20. Experiments validate that the encoder can realize real - time video coding at the speed of 25 cif pictures per second. moreover it possesses good visual quality and high compression ratio

    證,該編碼器在保持很好的圖像質量和高縮比的同時,實現了實時的視頻縮,處理速度可以達到cif格式的25幀/秒。
分享友人