過流能力 的英文怎麼說

中文拼音 [guòliúnéng]
過流能力 英文
throughput
  • : 過Ⅰ動詞[口語] (超越) go beyond the limit; undue; excessiveⅡ名詞(姓氏) a surname
  • : Ⅰ動1 (液體移動; 流動) flow 2 (移動不定) drift; move; wander 3 (流傳; 傳播) spread 4 (向壞...
  • : 能名詞(姓氏) a surname
  • : Ⅰ名1 (力量; 能力) power; strength; ability; capacity 2 [物理學] (改變物體運動狀態的作用) forc...
  • 能力 : ability; capacity; capability
  1. The better advantage of high frequency induction in defining thin intercalated bed, discerning high - salinity low - resistivity oil ( gas ) reservoir, estimative of reservoir, estimating water - flooded reservoir and so on are found by analyzing the application of the many frequency induction logs in shengli oil filed

    分析勝利油田多口井的高頻感應測井資料發現,高頻感應在劃分薄夾層、識別高礦化度低阻油(氣)層、定性確定儲層滲、評價水淹層等方面都有明顯的優越性。
  2. Some researchers have made study on this subject, such as the generation and evolution of frazil ice, shore ice, bottom ice, ice cover and ice jam, the resistance of freeze - up river, flow capacity and variation of water stage

    國內外一些學者通原型觀測,試驗和數值模擬的方法對水內冰,岸冰,底冰,冰蓋和冰塞的生成和演變,封凍河道的阻過流能力和水位變化等有關問題進行了研究。
  3. Through process agile design subsystem, enterprises " information share is intensified, and work mode is changed, and cooperation capability is enhanced

    創建工藝敏捷設計子系統來促進企業各部門信息共享,改變企業的工作方式,增強相互的協作交
  4. To provide necessary data for design bypass pipe, an enlargement to bi liu river reservoir, the following problems have been studied by hydraulic model and theoretical analysis : the energy losses in water head of the bypass pipe system and of the flow - control valve and their scale effects, measurement and calculation of the discharge of the bypass pipe system during the bypass pipe system operation with and without the new water power station, the hydraulic characteristics of the water tunnel and draw - off pipe, the flow rate of the aqueduct bridge and the draw - off pipe and the water elevation of the flow in the aqueduct bridge during the old water power station operation with and without the new water power station

    大連市碧河水庫供水工程取水頭部由引水渡槽、節制閘、進水閘、泄水閘等建築物組成。由於本工程場地條件限制,增設旁通管后布置非常緊湊,管道急轉角度大且轉彎距離較小,對于管內水態是否滿足要求,需要經模型試驗進行論證,以確保工程的可靠性。旁通管具有上水與泄水要求,對其過流能力也要經試驗確定,為碧河水庫增建旁通管設計提供依據。
  5. Foreign language : english, have passed cet4 and cet6 ; do well in oral english, can communicate with others naturally

    外語水平:英語,通國家四六級,口語良好,具備基本的口頭交
  6. In view of this situation this article has conducted research to the design of metallurgy auxiliary biography with the frequency conversion table electrical machinery first multianalysis to the frequency changer and the frequency conversion table electrical machinery movement characteristic is carried out, the voltage waveform harmonious which the frequency changer outputs is big, attacks in a big way, and the voltage climbing rate reaches as high as 6600v / mu s which is 20 times ordinary sine alternating voltage, the rolling mill auxiliary biography table set the extremely strict request to the electrical machinery ; its movement frequency is very low, rate frequency in 8 - 20hz ; the velocity modulation scope is wide, the lowest movement frequency lowers to 1hz, and the starting number of times is quite frequently, each hour reaches as high as 600 - 800 time, the impact shoulders in a big way, the overload capacity request is high

    針對這一情況本文對冶金輔傳用變頻輥道電機的設計進行了系統研究。首先對變頻器和變頻輥道電機的運行特性進行詳細分析,變頻器輸出的電壓波形諧波大,沖擊大,電壓上升率高達6600v / s ,是普通正弦交電壓的20倍;軋機輔傳輥道對電機提出了十分嚴格的要求:其運行頻率很低,額定頻率在8 - 20hz ;調速范圍寬,最低運行頻率低到0 . 5hz ,起動次數相當頻繁,每小時高達600 - 800次,沖擊負荷大,要求較高。
  7. By the means of paper - investigation and visiting, we find this kind of teaching manner ( inquiring study is effective for bettering students " interest and ability ( including their ability for exploring, cooperating and communicating. )

    問卷調查和訪談后發現,探究性學習對學生的學習興趣、學習(包括探究和合作與交等)的發展有一定的效果。
  8. Abstract : there are offered many ways how to improve work of a spark plug. but one of the m ost important problems has not been solved yet. this is a thermal mode operation of a spark plug. the ideal spark plug should be instantly heated at the moment of occurrence of a spark and instantly cooled down in expectation of the foll owing electrical pulse. thus it balances between preservation of heat for self ? c leaning from scale and its removal in avoidance self ? ignition. in this article a uthor managed for this time to offer a spark plug with capability “ self ? regula tion ” of heat flux removed from a zone of ignition. essence of the offer is a t ip , which is transparent for heat flux. it is produced from single crystal of sap phire

    文摘:在如何提高火花塞的工作質量方面有多種方法,但是其中最重要的一個問題還沒有得到解決,那就是火花塞工作的熱學模型問題.理想的火花塞應該在點火的瞬間被立刻加熱,並且在接下來的電脈沖程中迅速冷卻,由此在熱量的存儲與散發之間取得平衡,以避免自點火.本文圖展示一種具有自動調節源於點火區域熱的火花塞,其技術的關鍵是頂部絕緣體材料,它是由藍寶石單晶製作,而非傳統的氧化鋁陶瓷
  9. Under the control of a current loop, the system can make advantage of the motor ' s ability of over - current with a maximum limit, as a result, the motor can implement constant - current staring under a maximum let - through current. therefore, the motor ' s rotational speed can rise at a maximum acceleration and reach the given speed within the shortest time

    在電環的控制下,系統在起動的時候夠最大限度的發揮電機的過流能力,使電機以最大允許的起動電起動,則電機轉速可以以最大的加速度上升,並且以最快的時間達到給定轉速。
  10. The test results show that the water - sediment regulation can reduce aggradations of the channel, increase its flowing capacity and improve the sediment delivery conditions of the channel in the lower river

    分析結果表明,調水調沙不僅夠減少河道淤積,而且夠有效增大主槽的過流能力,改善下遊河道排沙條件。
  11. According to the test results from the yellow river water - sediment regulation, especially the first test, e paper analyzes the results of the scouring or deposition in the lower river and the area of the river - mouth bar, the adjustment of the channel morphology, the effect of channel regulation and the changes of flowing capacity of the lower reaches

    根據這兩次黃河調水調沙試驗成果,特別是首次調水調沙試驗成果,對下遊河道沖淤效果、河口攔門沙區泥沙沖淤量及其分佈、河勢調整、整治工程作用及河道過流能力變化進行了分析。
  12. The discharge capacity decrease and the water level rise as the floodplains " roughness increase

    隨著灘地糙率的增加,灘地的過流能力降低,沿程水位隨之抬高。
  13. The runner has distinctly low level in energy index and discharge capacity as well

    該轉輪量指標明顯偏低,過流能力也偏低。
  14. The labyrinth weir is a special kind of practical and effective weir patterns. it can evidently increase the discharge for a given outflow width

    迷宮堰作為一種實用高效的特殊堰型,它在不改變泄水寬度的情況下,可大幅度提高過流能力
  15. The relationship between the flow capacity and inner structure is the guidance to the structure design and fluid road design, so the change of the structure is of importance

    清洗液閥的內部結構和過流能力的一般關系是通大量的有限元計算而得出的,對各類閥門的結構和道設計有指導作用,因此清洗液閥的改型具有重要的意義。
  16. The results showed that considering the general performance of turbine and the discharge capacity of runner hl240 - lj - 420, when the design head was 36. 2m, the electricity generated by turbine generator increases to 4. 8 million kw, which was relatively reasonable

    結果表明:考慮到水輪機的綜合性和hl240thj一10道的過流能力,在設計水頭為36 2米時,水輪機發電機出增容到4
  17. Then, a series of physical model experimentations are made to research the flow pattern character and the discharge capacity of curve - labyrinth weir. in this process, the major effect factors of outletcapacity are discussed and a new calculated method of discharge is given

    物理模型試驗,觀測了曲線型迷宮堰的態特徵,根據實測資料,分析研究了該堰型的過流能力及其影響過流能力的主要因素,並提出了曲線型迷宮堰的量計算方法。
  18. As for the straight - labyrinth weir, the flow pattern character, the discharge capacity and its effecting factors are discussed ; the flow formula is deduced ; a set of discharge coefficient formulas are given basing on the former study ; and the efficiency is discussed

    系統討論了直線型迷宮堰態特徵、過流能力及其影響因素;推導了直線型迷宮堰量公式,並在前人研究的基礎上擬合出綜合量系數的計算公式;討論了直線型迷宮堰的效率問題。
  19. This paper discussed the relationship of the flow capacity and the inner structure, completed the numerical simulation of flow field and the characteristic of resistance, set up the finite element model and done the finite element calculation of the existing component and the improvement component of the cleaning valve, and done the experimentation manner

    對清洗液閥門現在的型號和改進的型號的道形狀建立有限元模型,進行有限元分析計算,獲得相應的過流能力的值,並進行比較,提出提高過流能力的新方案,並針對理論計算提出實驗系統方案。
  20. Water delivery has been run over 30 years. the main canal has the problem that the actual conveying capacity is very low now and the conveying capacity of the east - one main canal i only half of the design value, this lead to guaranteed real - time efficiency of the irrigation of the farmland recede greatly. the downstream has no water and crops were drought to death have been seen more times in the irrigation period, this lead to the contradictory between the upstream and downstream on water usage, moreover, the lower discharge capacity of the dry canal in irrigation period is the main cause of the actual irrigated area is only half of the design value

    三十年的輸水運行,目前乾渠工程存在嚴重的輸水低問題,其中東一乾渠輸水達到原設計的1 2 ,使農田的適時灌溉保證率大大降低,多次發生灌溉期下游見不到水而旱死莊稼的情況,造成上下游用水矛盾突出,而且灌溉期乾渠過流能力偏小,是導致實際灌溉面積僅為設計值的1 3的重要原因。
分享友人