過載限制系統 的英文怎麼說

中文拼音 [guòzǎixiànzhìtǒng]
過載限制系統 英文
overload limited system
  • : 過Ⅰ動詞[口語] (超越) go beyond the limit; undue; excessiveⅡ名詞(姓氏) a surname
  • : 載Ⅰ名詞(年) year : 一年半載 six to twelve months; six months to a year; 三年五載 three to five ...
  • : Ⅰ名詞(指定的范圍; 限度) limit; bounds Ⅱ動詞(指定范圍, 不許超過) set a limit; limit; restrict
  • : Ⅰ動詞1 (製造) make; manufacture 2 (擬訂; 規定) draw up; establish 3 (用強力約束; 限定; 管束...
  • : 系動詞(打結; 扣) tie; fasten; do up; button up
  • : Ⅰ名詞1 (事物間連續的關系) interconnected system 2 (衣服等的筒狀部分) any tube shaped part of ...
  • 限制 : place [impose] restrictions on [to]; astrict; restrict; limit; confine; shut down on [upon]: 限制...
  • 系統 : 1. (按一定關系組成的同類事物) system 2. (有條理的;有系統的) systematic
  1. In this thesis, studies are focused on as follows : ( 1 ) based on analyzing the general transfer - matrix, the conception of the generalized double layer soil model is proposed, and the transfer - matrix ( r ) of half - infinite elastic mass is introduce - d to the analytic expressions of stress and settlement under the uniform circular, rectangular and strip vertical loads in multi - layered soil ; ( 2 ) according to the analytic expressions of the additional stress and settlement under unifo - rm circular in multi - layered soil, rectangular and strip vertical loads, the programs are develop - ed to resolve and debugged. the results show that the programs are correct ; ( 3 ) through calculating the coefficient of additional stress on the central axis of uniform circ - ular vertical loads, under the corner point of the uniform rectangular vertical loads, and on the central axis of uniform strip vertical loads, and the settlement on the center of uniform circular vertical loads and uniform rectangular loads in double - layered soil, the characters of stress and settlement are discussed ; ( 4 ) a case, as an example, is studied with different calculation methods, such as traditional theory, fem. the results obtained are compared

    本文在已有研究成果的基礎上進一步開展了以下幾方面的研究: ( 1 )在對層狀地基傳遞矩陣法中的總傳遞矩陣分析的基礎上,提出了廣義雙層地基模型的概念,並把半無體的傳遞矩陣r引入到多層地基在圓形垂直均布荷、矩形垂直均布荷及條形垂直均布荷作用下附加應力與沉降的解析式中; ( 2 )根據多層地基在圓形荷、矩形垂直均布荷及條形垂直均布荷作用下附加應力與沉降的解析式,編了程序,調試通並驗證了其正確性; ( 3 )通對雙層地基圓形垂直均布荷中心軸線上的附加應力數和荷中心沉降,矩形垂直均布荷角點下的附加應力數和荷角點沉降及條形垂直均布荷中心軸線上的附加應力數進行的計算,探討了雙層地基中的附加應力與沉降特性; ( 4 )應用本文的層狀地基體理論對一個工程實例進行了計算分析,並與傳的計算方法的計算結果和有單元方法的計算結果進行了對比分析,結果表明利用層狀地基理論計算更能反映地基中附加應力分佈的實際情況。
  2. This article, through analysis different system radar ’ s superiority and limitation in target identification, proposes to unite the convention air defense radar ’ s echo characteristic and the electronic support sensory system ’ s aircraft - borne radiant characteristic, structure reasonable recognition system. it can satisfie the airplane target identification demand under the different background

    本文通分析不同體雷達在目標識別上的優勢和局性,提出把常規防空雷達回波特徵和電子支援偵察得到的機輻射源特徵聯合起來,構造合理的識別的新思路,以此來滿足不同背景下對飛機目標識別的需求。
  3. The table will write down all about the electronic records during their life period. the content noted in the table will be the only basis on original and reality " testing of electronic records ". the major task of the second levels is to build the tight filing rules, moreover, combined the " life cycle table ", to build the test system to assure the original and the reality of the information during filing ; the assignment of the third level is to build testing and restoring measures of the original and the reality. by maintaining the media of electronic archives or building information file of electronic archives etc, electronic archives can maintain their available ^ visuak understandable during their deadline ; meanwhile, to build the safe control of the system through the workers dispersed authorization and deterring skills, to formulate the standards of the protective system, such as the standard of the basic structure of united electronic records ^ electronic archives. all of this is important to protect the original and the reality of electronic records and electronic archives

    「生命周期表」所記錄的內容將作為電子文件歸檔時檢驗原始性、真實性的唯一依據;電子文件歸檔管理層中的主要任務是要建立起嚴密的歸檔度,同時結合「文件生命同期表」建立檢驗措施保證電子文件在歸檔程中信息內容的原始性、真實性;電子檔案保管層中主要任務是建立電子檔案數據原始性、真實性檢驗及原始數據恢復管理措施,通對電子檔案體的維護、建立電子檔案維護管理的信息文檔等工作,確保在保管期中的電子檔案保持其可用性、可存取性、可理解性:建立電子文件與電子檔案原始性、真實性保護體安全控,通工作人員授權分散化、建立用戶標識與認證技術等措施確保「保護體」安全運行;加強「保護體」涉及的標準與規范的定工作,如建立一的歸檔電于文件、電子檔案基本結構等標準對保護電子文件、電子檔案信息原始性、真實性有著重要意義。
  4. He finds the pitch range after calculated the three important parameters through the bladed for windows software, then presents an optimized control strategy that regulate the pitch angle in terms of the wind speed. it must control the output power because the variational output power brings the variational loads. he confirms and optimizes the control strategy that the output power is the control target, the output power is divided into three parts

    將功率作為的目標,將功率分成三段進行控,在低風速區,荷是有的,以功率最大化作為控目標;在額定風速附近,由於處在升力曲線斜率的變化點,功率變化較大,應盡快調整槳距角進入失速區工作,減少荷的波動,該額定風速區的上下工作點要通現場試驗的手段來確定;在額定風速以上,使功率維持在額定輸出,減少功率波動,並通bladed軟體的模擬計算對控策略進行了驗證。
  5. The results of the experiment show this creative ac variable frequency speed - governing experiment system can realize the load relationship of direct electromagnetic torque between the motor group, get the continuous control process easily for the reaction load and potential energy load during four quadrant, achieve the total availability of the regenerate energy at any kind of load, and the system consumed power make up under 30 % of actual load power at any kind of load

    該方案研究獲得的實驗結果表明:這種具有創新特色的交流變頻調速實驗可實現電動機組之間直接電磁轉矩方式的負,可方便地獲得電動機在反應或位能負特性下四象運行的連續控程,並實現了任意負方式下再生能量的全部回饋利用,任意負消耗功率僅占電動機實際負功率的30 %以下。
  6. Green - mode which provides off - time modulation to linearly decrease the working frequency under light - load conditions and power limiting which will turn off the transistor when peak current of inductor reaches the threshold current

    同時該電路集成了能在輕負情況下自動降低頻率的綠色模式以及能在電感峰值電流高時關斷調整管的功率模塊,降低了的功耗。
  7. The aimd has got a widely apply for its briefness and ease. at the other hand, it contain limited information because it has only two status : overload or under load. it cannot represent the true demand of the receiver and at the same time the policies of window adjust destroy the demand of smoothness of load, so it cannot afford the request of real - time streaming media

    Aimd從演算法的簡單性和實際網路容易實現的角度考慮,反饋給發送方的信息有,只有或欠兩種二進狀態; aimd演算法根據瓶頸資源的擁塞狀態向所有用戶發送相同的反饋信號,並不能真實反映接收節點對發送方負量的要求;同時, aimd的窗口調整策略破壞了負平滑性的要求,不能滿足當前實時流媒體應用, aimd的這些不足,體現了一種性能和復雜度之間的折衷。
  8. In this paper, ansys is been used as numerical method. base on one example, fem model is created by using parameterized modeling and the develop technique by ansys, the effect of the model size has been studied. lt has been certified that the proper parameter value of the model is helpful to develop the analysis accuracy. the length, the diameter and the elastic modulus of pile is changed to study their effect. the analysis shows that : as to frictional pile, big length, big diameter, and great modulus is helpful to develop the bearing capacity of piles

    並分析了模型尺寸對分析結果的影響,結論表明,適當的選取模型參數,有利於分析的精度的提高。文章還通改變不同的樁土參數,樁長,樁的直徑,以及樁的彈性模量,得到了樁土的響應,繪了p ? s曲線,結論表明,對于摩擦樁而言,增大樁長,提高樁的直徑,或者提高樁的彈性模量,有利於提高單樁的極力。
  9. The most important characteristic of real - time application systems is that they must receive and respond to a set of external stimuli within rigid and critical time constraints referred to as deadlines, otherwise, a overload fault will probably result in a catastrophic event

    實時應用的特點是,它們應該在嚴格的死范圍內對一列的外部事件作出響應,否則,就可能會導致災難性事件的發生。
  10. The thesis, in the probability analysis and computation, considers the failure history of space frames and trusses, adopts the bound criterion and algorithms on the base of system ' s critical strength, and introduces the soft self - adaptation control bound into the identification of dominant failure modes ; at the same time, with the incremental load method and differential equalized recursive method, computes the limit - state function of failure mode and probability index precisely under no leaking the dominant failure modes

    文中在可靠性分析和計算部分,考慮空間剛桁架結構的失效演化歷程,採用基於臨界強度的約界準則和約界演算法,將柔性自適應控邊界引入失效模式識別程;同時,用荷增量法和微分等價遞歸演算法相結合,確保在嚴格不遺漏主要失效模式的情況下,快速準確地求解失效模式的極狀態方程和可靠度指標。
  11. First, based on the analysis to the development condition of computer and property of the input data of bridge, this paper, taking convenience and practicability as principle, develops the multi passages data - in system made up with human - computer interactive interface and excel import model. second, after comparing and analyzing to the calculation theories and methods of creep and shrinkage, clearing up the key steps of creep and shrinkage analysis, the paper takes incremental method to establish program to analyze secondary inner force caused by creep and shrinkage. third, the paper puts some optimal or simplified treatment to the contents of pre - stress and develops relative program ; in addition, through analysis to the different methods used to calculate the secondary inner force caused by pre - stress, the paper combines equivalent load method with finite element, carries out some simplified treatments, and establishes program to calculate secondary inner force caused by pre - stress

    首先,在分析當前計算機的發展狀況及橋梁結構輸入數據特點的基礎上,以方便、實用為原則,採用人機交互界面和excel輸入方式聯合的多通道數據輸入;其次,通比較分析徐變收縮計算的各種理論及方法,澄清了徐變收縮分析的關鍵程,並採用增量法編製程序,實現徐變收縮次內力分析;再次,對預應力的相關計算內容進行適當優化或簡化處理,並編相應程序;另外,本文還在比較預應力次內力各種計算方法的基礎上,將等效荷法結合有元進行一些簡化處理,編製程序實現預應力次內力的計算;最後以三個算例來校核計算方法及程序運行結果的可靠性,取得了預期效果。
  12. Under the horizontal earthquake action and wind force, aim at " the pure frame structure with rectangle columns ", " the pure frame structure with special - shaped columns ", " the frame - truss structure with special - shaped columns " and " frame - shear wall structure with special - shaped columns ", earthquake action analysis was done by the spacial finite element method through the changes structural parameter. analyzing systematically " structure vibration mode ", " vibration period ", " structure lateral rigidity ", " seismic action force ", " seismic response force ", " floor seismic shear force ", " lateral horizontal displacement of structure " and " members internal force ". results indicate : ( 1 ) based on equal area, the special - shaped columns replaced the rectangle columns, the structural lateral rigidity enlarges, the lateral displacement minishes obviously, the earthquake response increase slightly, the biggest increasing amount of frame columns axis - compress ratio is smaller than 0. 08. the whole aseismic performance of structure has improved ; ( 2 ) when the section ' s length and section ' s thickness ratio of special - shaped columns is smaller than 3. 6, the structure benefits to resist seismic action ; ( 3 ) the angle of horizontal seismic action with the whole coordinate is 0 degree, structure earthquake response is bigger, belonging to a control factor of structure aseismic design ; ( 4 ) the frame - truss structure with special - shaped columns and the " a " - brace has the biggest lateral rigidity ; ( 5 ) the frame - shear wall structure with special - shaped columns have bigger lateral rigidity and smaller displacement, members internal force enlarged just rightly, have much superiority of resisting seismic action ; ( 6 ) in the higher seismic fortification criterion region ( 8 degree of seismic fortification intensity ), aseismic disadvantageous building site ( iii type site ), adopting special - shaped columns structure system, should reduce possibly the building ' s self - weight in order to reduce the earthquake response ; ( 7 ) the response spectrum method of computing seismic response and the time - history analysis method have similar analysis result

    西安理工大學碩士學位論文在水平地震作用下,並考慮風荷組合,分別對「矩形柱純框架結構」 、 「異型柱純框架結構」 、 「異型柱框一析架結構」及「異型柱框-剪結構」等四種結構體,通改變結構參數,運用空間有元方法,進行地震作用計算。地分析研究「結構振型」 、 「振動周期」 、 「結構側向剛度」 、 「結構地震反應力」 、 「樓層地震剪力」 、 「結構側向位移」 、 「層間位移角」 ,以及「構件內力」 。結果表明:在等面積原則下,異型柱代換矩形柱后,結構剛度增大,側向位移明顯減小,地震反應力略有增加,框架柱軸壓比最大增幅小於8 % ,結構整體抗震性能有所提高;當異型柱肢長肢厚比小於等於3 . 6時,結構有利於抗震;水平地震作用力與整體坐標夾角為0度時,結構地震作用效應較大,屬結構設計的控因素之一;異型柱框一析架結構採用「人」字斜撐,側向剛度大於「八」字斜撐和「人一八」字混合斜撐;異型柱框一剪結構側向剛度大、位移小,構件內力增大適中,是一種抗震性能優越的結構體:在抗震設防烈度較高地區( 8度)和抗震不利的建築場地( m類場地) ,採用異型柱結構體時,應盡可能減輕結構自重,降低地震作用力;分別採用「振型分解反應譜」法和「時程分析」法進行地震作用計算,兩種方法所得結果基本一致。
  13. Equip along with the weapon continuously creative, the sharp weapon also raises continuously in the quantity and the request on the quantities, processing to produce the mode and productions to process the production request that the equipments have already ca n ' t satisfy the long sail company originally possessed. through the common consultation of the company leadership and all employee, decide to throw in the capital, carry on to the company to reform completely, expand the scale, lead quantity and quantities that controls the production line to raise the production into the number, thus satisfy the competition ability that the productivity request combines to raise the business enterprise continuously. this thesis mainly what to study is the long spring aviation liquid to press to control the limited company number to control the degree of progress that the production line installs the item excellent turn, pass to use the item management of theories resolve the problem within actual application

    長春航空液壓控公司前身是中國航空第二集團下屬第133廠,是一個為飛機配套機設備的軍工企業,成立於1998年,隨著我軍裝備事業的不斷發展,對武器裝備的需要也越來越迫切,大批量的高精尖武器裝備已經成為打贏高科技精裝備條件下局部戰爭的法寶,因此長春航空液壓控公司針對這一嚴峻形勢,果斷地提出利用項目管理的知識體,引進數控生產線項目,在保證企業正常生產和安裝質量的前提下,縮短工期,節約成本並通項目管理知識體的運用,用的管理知識,提高管理效率、管理水平,並運用到其他的項目中,從而最終提高企業的生產力和競爭力。
  14. According to the characteristic of nine - area diagram of substation vol / var coordinated control, this system gives the defination of fuzzy sets and the degree of membership of input / output variables, and designs corresponding control rules. the results of simulation demonstrate the system can satisfy the constrains of the day - adjusting times of the switching of on - load transformer and paralleled compensation capacitors, and ensure voltage quality, reactive power basical balance. considering the var requirement in different load time period and the control demand in load saltation, a improved control scheme is provided. the results of simulation show the improved scheme can meet the demand of vol / var in different load time period, protect the wrong operation when either voltage or reactive power appears saltation, and decrease the times of regulation of the switching of on - load transformer and paralleled compensation capacitors finally, a background software module of substation vol / var coordinated control is designed, based on the supervisory control and data acquisition system of substation

    模擬結果證明該能在各種負荷條件下確保電壓合格和無功基本平衡,且能滿足變電站對有調壓變壓器分接頭日調節次數和並聯補償電容器組的日投切次數的。通考慮不同負荷時段對無功功率的需求和負荷突變情況下的控要求,對上述模糊控策略進行了改進,模擬結果證明改進后的控策略能滿足不同負荷時段對電壓和無功的要求、抑電壓或無功突變情況下的誤動作,且有效地減少了有調壓變壓器分接頭和並聯補償電容器組的調節次數。最後基於變電站scada設計了一后臺電壓無功綜合控軟體模塊。
分享友人