選擇裝置 的英文怎麼說
中文拼音 [xuǎnzháizhuāngzhì]
選擇裝置
英文
strobe unit- 選 : Ⅰ動詞1. (挑選) select; choose; pick 2. (選舉) elect Ⅱ名詞(挑選出來編在一起的作品) selections; anthology
- 擇 : 擇動詞(挑選) select; pick; choose
- 裝 : Ⅰ名詞1 (服裝) dress; outfit; attire; clothing 2 (演員的化裝品) stage makeup and costume Ⅱ動詞...
- 置 : 動詞1. (擱; 放) place; put; lay 2. (設立; 布置) set up; establish; arrange; fix up 3. (購置) buy; purchase
- 選擇 : select; choose; opt; election; choice; culling; alternative
- 裝置 : 1 (機器設備的配件)installation; device; apparatus; equipment; arrangement; gear; appliance; rig...
-
The operation principle and device to produce acetin and hydroxyethyl acetate for foundry firming agent were analyzed in the paper, and the choice of esterification catalyst and dehydrated agent in the esterifying process also were analyzed theoretically, and finally, the better producing operation device, catalyst and dehydrated agent were obtained
摘要分析了鑄造用有機酯固化劑酯酸甘油酯和乙二醇醋酸酯合成工藝原理及裝置,同時對有機酯合成工藝條件中脫水劑和催化劑的選擇的理論依據進行了分析,得出鑄造用有機酯固化劑的最佳合成工藝裝置和脫水劑、催化劑。Engineering consu - etation of deiegn for coal - fired power dlant, especial in the fields of thermal system, mechanical equipment selection and the lagout and erection of the tquipment and piping in dower plant
火力發電廠工程設計咨詢、熱機工藝系統擬定及其計算、熱力設備選型選擇、系統及設備的布置和安裝設計。General speaking, if it is the drying of the electuary and granular materials, which have relative large proportion, only the cyclone separator is needed
一般來說,比重較大的物料只需選擇旋風分離器。比重較輕的物料需配套布袋除塵器,並備有氣力送料裝置供選擇。Firstly, the connected end sets of the relay lines are got using the breadth first search algorithm and the connected relationship of wiring terms is got in the electrical circuit diagram according to different cad block structure of different element type. secondly, the appropriate specification of the relay element is chosen by using the equinoctial graph algorithm, and the panel layout diagram is generated automatically by the combining automatic layout and manual intervention. finally, the optimized path algorithm which passes each vertex in the completed non - directional graph once and only once is put forward, this algorithm and the prim minimum spanning tree algrotithm can generate the inner panel wiring diagram and terminal wiring diagram automatically
首先,採用廣度優先搜索演算法查找電氣原理圖中的連通導線端點集,並根據不同類型的繼電元件對應的cad圖塊結構的不同,得到電氣原理圖中元件接線端子之間的連接關系;其次,根據二分圖匹配演算法為電氣原理圖中繼電元件選擇合適的型號和規格,並採用人工干預和自動布置相結合的方法完成屏面布置圖的自動生成;最後,提出了完全無向圖中經過每個頂點一次且僅一次的優化路徑演算法,利用該演算法和經過預處理的prim最小生成樹演算法自動生成屏內安裝接線圖和端子接線圖。These years we have developed strongly acidic macroreticular catalysts based on styrene dvb. catalyst resin d006 for mtbe tame etbe, also as catalyst use for producing tba by isobutene hydration and direct producing gasoline with high octane rating by light gasoline etherification. d008 for sba ipa, also can be used for making methyl ethyl ketone by acetone one - stepping process, tert - butanol by isobutene hydration, etherified gasoline by the etherification of isopentene and isohexene in light gasoline with methyl alcohol, high
以上,增強了催化活性,從而延長了使用壽命,提高了周期產量二低溫活性好,選擇性強,提高了mtbe的純度,降低了雜質含量三在同樣裝置中,可增大負荷,提高產量,降低生產成本和費用。Eletrical installations of buildings - part 5 : selection and evection of electrical equipment - section 548 : earthing arrangements and equipotential bonding for information technology installations
建築物電氣裝置第5部分:電氣設備的選擇和安裝第548節:信息技術裝置的接地配置和等電位聯結But when fault was occurred, sometimes there would be great loss. for the reason, the paper put forward a microcomputer bus protection scheme suit for mv or lv power system with low current grounding based on the great researching about the working theory of current bus protections and the characteristic of mv or lv system with low current grounding. based on it, the paper has designed the platform of the hardware and the software programs
針對國內目前中、低壓電網大都未裝設母線保護裝置,發生故障不能及時切除時造成很大損失的狀況,本文在廣泛研究當前主流的母線保護動作原理並認真分析了中、低壓小電流接地系統特點的基礎上,提出了一套適合中、低壓微機母線保護裝置的研製方案,並據此選擇、搭建了硬體平臺,設計了軟體功能程序。Kts knock threshold select
爆震起始選擇裝置Selection for the process for liquefaction plants of natural gas
天然氣液化裝置的流程選擇A lot of experiments have been done in the process of exploiture soft packaging li - ion battery about how to choice the rational arts and crafts. the content include : how to deal with the collector, add how much pvdf in the material, how long the material need to stirring and the right viscidity, how much condubtivity agent the electrode need, what theckness is best, choice different collectors, the degree of dryness of the electrode, theckness of pressed model, how much electrolyte will be added, placement how long after added the electrolyte, system of formation how to influnce the battery, in formation the battery need or not need preesure from outside, how to vacuumize and the optimize matching positive pole and negative pole. with these practice make sure the parameter of the positive pole should less than 90 m ; according to different vacuumize order the conduc - tivity agent in anode will be 5mass % and 9mass %, respectively, and in cathode the data is 2mass % ; every 100mah added to 0. 4 ml electrolyte ; before formation the battery should be placement 8 hours and the system of formation must be less than 0. 01c before the voltage reach to 3. 0v ; should press in outside when battery in formation ; to these batteries which capacity more than 350mah the vacuum time not excess 15s ; the optimize matching positive pole and negative pole between 2. 10 : 1 and 2. 15 : 1. finally make out the battery which cycling performance and security are all very well
液態軟包裝鋰離子電池的研究主要是對關鍵工藝進行了優化設計,具體包括:集流體的處理、 pvdf的加入量、漿料攪拌時間和粘度、導電劑的加入量、電極膜的厚度、不同集流體的選擇、電極膜的乾燥程度、壓型的厚度、電解液的加入量、注入電解液后靜置時間的長短、化成制度的影響、化成時電池所具有的壓力影響、抽真空的處理、正負極活性物質的匹配。最後確定出液態軟包裝鋰離子電池最佳工藝參數:正極膜的厚度小於90 m ;根據化成時不同抽真空順序,確定正極膜中的導電劑的加入量分別為5mass %和9mass % ;負極膜中導電劑的加入量為2mass % ;電解液的加入量為每100mah添加0 . 4ml ;化成前電池的靜置時間應當大於8h ;電池在3 . 0v之前採用小於0 . 01c的化成制度;在化成過程中應當施加一定的外部壓力;對於350mah的電池抽真空的延時不應大於15s ;而正負極活性物質的質量比應當在2 . 1 : 1 2 . 15 : 1之間。The article provides the demonstrations of the light source, transmitting / receiving set and homochromor. the whole work is to fix on the sets and select the parameters of them. at the end of the design of sets, a whole set is achieved by assembling the three main parts
本文在實驗裝置的設計方面,主要對包括光源、收發裝置、單色儀等部分進行了充分論證,確定了光源和收發裝置,對單色儀的參數進行了計算與選擇;在硬體設計的最後部分,對整個實驗裝置進行了系統整合,使之成為了一個有機的整體。In the old days, your only option would be to unmount tmp and remount your new tmpfs tmp filesystem in its place, as follows
過去,您唯一的選擇就是卸載/ tmp並在其位置重新安裝您新的tmpfs / tmp文件系統,如下所示:You get a 3x zoom lens for your money, together with the ability to store 30 second movie clips, five exposure modes, red - eye reduction and the option to take colour, black and white or sepia shots
該相機配有一個3倍的變焦頭,可以存儲30秒影片,有5種曝光模式,具備防紅眼的裝置,可以選擇彩色、黑白、深褐色彩。Series full - auto pipe expander with drawing device and program interface is used with extruding machine. it is also used solitarily, while expanding pipes, the machine adopts translation, the action is steady and corret, it does not damage pipe materical, the machine adoptes double - infrared heating oven type, each oven is equipped with heating cire, the shaping method adopts expanding - end shaping, the size of pipe mouth is correct. on its panel, there is a transfer swith of expanding solvent type pipe socket ( straigh port ) and expanding sealloop type pipe socket ( rport ). the choice of expanding pipe type is very convenient, the technologocal adaptability is strong, its main electric control elements are all imported. the syetem charecteristics are steady and reliable
配有與主機配套的接料牽引裝置和相應的程序介面,既能與擠管主機聯線使用,又可以作單機使用;擴管時管材的移動均採用平移方式,動作平穩準確而且不易損傷管材;這種機型採用紅外線加熱方式且為雙加熱爐型,每個加熱爐都配有中心加熱爐芯;成型方式均採用擴管頭定型方式,管口成型尺寸準確;該機型在控制面板上設有擴溶劑型承介面(直口)和擴彈性密封圈型承介面( r口)的轉換開關,擴管方式選擇十分方便,工藝適應性強;主要的電器控制元件均採用進口元件,系統性能穩定可靠。The first part. task analyse of handling technology design. is explain the place, basic establishments entironment of yangshan port and the conditions basic tenet and technical parameter of design. the second part, project study out. is discuss the design contents the choice of the leading and the assistant engine, the form of the handling mechanisation system, project study out. the third part, size design, is count the berth pass capacity, the amount of handling engine, the area and capacity of yard, road and gate, the worker amount. the fourth part. technology and economy argumentation, commendable project confirm, is confirm the commendable project by technology and economy argumentation. in the end, considering the technology, economy and use. discourse commend the project of rubber - tyred gantry crane. at present. centre government is studying yangshan project, but in handling technology part of container terminal, the design is simply. so this discourse has important consult value. and has important value of economy and community too
第一部分的裝卸工藝設計任務分析主要就洋山港區的地理位置、基礎設施、自然環境,設計前提條件,設計原則以及設計主要技術參數進行說明;第二部分的裝卸工藝方案擬定主要就工藝設計的主要內容,主要機械及輔助機械選擇,裝卸機械化系統組成以及工藝設計方案擬定進行論述;第三部分的裝卸工藝方案規模設計主要就泊位通過能力,裝卸機械臺數,堆場面積及堆存能力,道路及大門,司機及工人人數,工藝流程進行計算分析;第四部分的技術經濟論證及推薦方案確定主要就技術、經濟指標進行對比論證,並在此基礎上確定推薦方案。Built in 25 min timer, can be disabled if not needed. pneumatic remote on off switch. separate 12 v signal light
內置25分鐘時計,氣動式遙控開關掣,分開安裝的12 v的訊號燈,可選擇內置數碼式控制器。Two guidelines were defined to evaluate the selective assembly quality : matching rate and assembly precision, and two computer - aided selective assembly methods were suggested : the matching according to the average deviation of the closing link and the matching according to the ideal size position of the closing link
摘要定義了評定選擇裝配質量的兩個指標:匹配率和匹配精度,提出了計算機輔助選擇裝配的兩種基本方法:按封閉環理想尺寸位置匹配和按封閉環平均偏差值匹配。Pre - selecting device for watches ; dimensioning and designations
手錶預選擇裝置.尺寸和名稱Then select one of the devices, and change its irq, i / o, and / or dma to a free location
然後選擇裝置之一,而且將它的irq 、輸入輸出以及/或dma換成一個免費的位置。How to : set conditional installation based on user choices
如何:基於用戶選擇設置條件安裝分享友人