選站開頭 的英文怎麼說
中文拼音 [xuǎnzhànkāitóu]
選站開頭
英文
station selector-
This paper elaborates the parameters selection of the 700mw turbine for laxiwa power station located upstream yellow river, which is coming into construction soon. through statistical calculation of specific speed for turbines with large capacity, high operating head in domestic and oversea power station, utilizing turbine homologous theory. adopting regression statistic calculation method, it has got specific speed statistic equation., the demonstration of primary parameters selection, and the primary target parameters suitable for laxiwa power station
本文針對黃河上游即將開工建設的拉西瓦水電站700mw水輪機的參數選擇進行了研究,通過對國內外的大容量、高水頭水輪機的比轉速統計計算,利用水輪機的相似理論,採用回歸統計計算方法,統計出了比轉速統計方程,並進行了水輪機主要參數選擇論證,提出了適合拉西瓦水電站水輪機的主要目標參數。
分享友人