邊孔井 的英文怎麼說

中文拼音 [biānkǒngjǐng]
邊孔井 英文
marginal bore
  • : 邊Ⅰ名詞1 (幾何圖形上夾成角的直線或圍成多邊形的線段) side; section 2 (邊緣) edge; margin; oute...
  • : Ⅰ名詞1 (從地面往下鑿成的能取水的深洞) well 2 (形狀像井的東西) sth in the shape of a well 3 (...
  1. The study includes the hole color tv imagery system for drill hole, even - pole bore - hole acoustic system and acoustic meter, bore - hole multi - point consolidation apparatus, the quick camera computer - aid image for high rocky slope, image technology for layer analysis, safety monitoring technology for the section close to the dam, software for processing and forecasting the slope monitoring data, high precision geodesy monitoring automation system, etc. all the study results are new, advanced and practical, which has applied in the project and gained the obvious benefits

    彩色電視壁成像系統、直接橫波測研究偶極子下聲系和聲波儀、鉆多點滲壓儀及壓模系統、巖質高坡快速攝像微機地質素描成圖、層析成像技術、近壩庫段安全監測技術、坡監測數據處理預報軟體研究、高精度大地測量監測自動化系統等項目,研究成果內容新、先進、實用,已在工程中應用,效益顯著。
  2. By direct shear for and normal triaxial shear tests of non - saturated desert sand, the parper studied the effect of water content and dry density on the strength of the non - saturated desert sand, and set up the code of this sand. based on the plane strain test of non - saturated desert sand slope, the paper analysed the destruction way of the excavaion side during the construction by means of adding water, and brough forward a formule that calculates the allowable of excavation and pile hole

    通過非飽和沙漠砂直剪試驗和常規三軸剪切試驗,研究了含水量和干密度對非飽和砂強度的影響,建立了這種砂的強度準則。通過非飽和沙漠砂坡室內平面應變試驗,分析了沙漠場浸法施工中就基坑壁的破壞方式,推導出了基坑和樁容許開挖深度的計算公式。
  3. The construction methods and caving protection measures for punching high thick and loosen soft coal seam in luling coal mine no. 2 dark tilt well in huaibei coal mine area are introducded. they include small section enlarged after the heading caving, high negative pressure and multi - raw drilling holes and strenous drawing - off, concentrated cross drill holes, cutting while drawing - off and putting the metal frame away

    介紹了淮北礦區蘆嶺煤礦2主暗斜採用小斷面導硐后刷大、高負壓多排鉆強抽,密集交叉鉆抽及設置金屬骨架施工方法和防突措施揭穿高突特厚松軟煤層。
  4. It is also used to prevent or solve geologic calamity, such as landslide and rock collapse etc. in addition, it is also used to drill small size water well and hige - pressure jet grouting hole

    適用於水電站鐵路公路坡大噸位預應力錨固排水的施工,以及預防滑坡巖石坍塌等地質災害治理工程。也適用於小型水的施工高壓旋噴引的施工。
  5. It also used to prevent or solve geologic calamity, such as landslide and rock collapse etc. in addition, it is also used to drill small size water well and high - pressure jet grouting hole

    Yg - 80a鉆機適用於水電站工程鐵路公路坡大噸位預應力錨固排水的施工,以預防滑坡巖石崩塌等各類地質災害治理工程也適用於小型水鉆高壓旋噴引的施工。
分享友人