部分負荷運行 的英文怎麼說

中文拼音 [fēnyùnháng]
部分負荷運行 英文
operation at part load
  • : Ⅰ名詞1 (部分; 部位) part; section; division; region 2 (部門; 機關或組織單位的名稱) unit; mini...
  • : 分Ⅰ名詞1. (成分) component 2. (職責和權利的限度) what is within one's duty or rights Ⅱ同 「份」Ⅲ動詞[書面語] (料想) judge
  • : Ⅰ名詞1 (負擔) burden; load 2 (虧損) loss 3 (失敗) defeat Ⅱ動詞1 [書面語] (背) carry on th...
  • : 荷名詞(蓮) lotus
  • : Ⅰ動詞1 (物體位置不斷變化) move; revolve 2 (搬運; 運輸) carry; transport 3 (運用) use; wield...
  • : 行Ⅰ名詞1 (行列) line; row 2 (排行) seniority among brothers and sisters:你行幾? 我行三。where...
  • 部分 : (整體中的局部或個體) part; section; portion
  • 負荷 : [電學] load; charge; weight
  • 運行 : move; be in motion; run; working; machine run; operation; corotation; propulsion (影片)
  1. Specification for railway turnouts for private users - medium grade turnouts over which british railways locomotives do not operate, for axle loads not exceeding 25 tons - turnouts using bull head rail

    私營鐵路道岔規范.第3:英國鐵路機車不的軸不超過25噸的中型道岔.第1節:工字鋼軌道岔
  2. Specification for railway turnouts for private users - light grade turnouts over which british railways locomotives do not operate, for axle loads not exceeding 10 tons, using flat bottom rails

    私營鐵路道岔規范.第2:英國鐵路機車不的軸不超過10噸的輕型平底鋼軌岔道
  3. This temperature calculation method avoids the non - correspondence between the flow rate and heat flux, which may exists in that used by boiler manufactures, and was employed to calculate the tube temperature of dangerous position that concerns with the retrofit scheme of superheater 1 of tower type coal - fired 330 mw once - through boiler in pucheng power plant for 100 % and 50 % operation load

    針對蒲城電廠330mw塔式燃煤直流鍋爐1號過熱器的改造方案,利用本文提出的方法與電廠鍋爐常用的壁溫計算方法別計算了100 %與50 %鍋爐下危險位的壁溫。
  4. This paper involves qualitative analysis to inclined belt conveyor for gantry bucket wheel stacker - reclaimer. the component structures and working characters are improved, accomplishing full load operation of the stacker - reclaimer

    摘要通過對門式斗輪堆取料機斜升帶式輸送機的定性研究析,從改變件結構和件工作特性人手,對其進了改進,實現了門式斗輪堆取料機的滿
  5. Furthermore, it was acquired that the parameters of gecko gait ( such as gait period, stride length, duty factor ) and the angle curve of each leg according to the actual motion of them from the recorded datas which was processed and analyzed by computer programme. finally, it is concluded as the following : the angle variation of legs can be repeated during the motion ; in accord with each surface, it is varied that the gecko gait such as the period in which each leg is landed in surface, the sequence in which each leg was whether lift in advance or not during the motion. the motion speed of gecko is changed by adjusting the duty factors of each leg on the same surface

    通過對實驗結果的析比較,得出:動過程中各腿腿角度的變化過程具有明顯的規律性;不同表面上壁虎各腿的支撐狀態(各腿的支撐時間及抬、落腿的先後順序)各不相同;相同的表面上,壁虎的爬速度的變化主要是通過調整各腿的因數而實現的;相同的表面上,壁虎以不同的速度動時,其步態(各腿抬、落腿的先後順序)是相同的。
  6. Specification for railway turnouts for private users - heavy grade turnouts over which british railways locomotives do not operate, for axle loads which may exceed 25 tons, using flat bottom rails

    私營鐵路道岔規范.第4:英國鐵路機車不的軸可超過25噸的重型平底鋼軌岔道
  7. The problem of energy saving of water systems in the operating condition of part load is studied. the aim is to get a more reasonable control method. using this method, the supplied flux of chilled water can meet the needed flux of the building during the operating times of part load, the on / off condition of pumps and chiller can be decided reasonably and it has the advantage of saving energy in pumps and chiller

    本論文主要研究空調水系統在下輸送的節能問題,其目的在於尋求一種較合理的控制方法,使冷水機組和水泵在空調時,輸送的冷量與實際建築物所需冷量相匹配,以決定水泵和冷水機組的啟停,最大限度地節約水泵輸送能耗及冷水機組的製冷能耗。
  8. Specification for railway turnouts for private users - medium grade turnouts over which british railways locomotives do not operate, for axle loads not exceeding 25 tons - turnouts using flat bottom rails

    私營鐵路道岔規范.第3:英國鐵路機車不的軸不超過25噸的中型道岔.第2節:平底鋼軌道岔
  9. The research objective is to improve the control system performance through the combination of the advanced control strategy with the meaningful information mined from the history operation database. firstly, a new solution for the control performance enhancement is presented by the reference of the kdd technology. aiming at practical application, a novel boiler load control method, which combines the multiple model adaptive control strategy with the data mining technology, is put forward in this dissertation

    本文第一為熱工過程式控制制與數據信息採掘,研究的重點是通過先進控制策略的應用以及數據中發掘的有用信息,提高現有典型熱工過程式控制制系統的性能,內容包括:首次提出了借鑒數據信息採掘技術的思路和方法,用於完善現有的熱力系統優化控制方案;在此基礎上結合生產實際,提出了用多模型自適應策略實施鍋爐控制,並利用關聯規則的數據信息採掘方法,通過對燃料發熱量信息的在線診斷,優化控制器結構,同時實現鍋爐燃燒配風的自適應調整,提高、燃燒控制系統性能。
  10. It put out the system requirements from the whole structure, function structure, developing mode, user management, the design of software and database, safety design, system running efficiency, developing plan, etc. it put out the basic graphics operation, the module building and editing of the electrical network, the devices records and function management the devices operating management, the function producing the electrical subject chart, the outside interface function, the in - out function and webgis, etc. it discusses some advanced functions including the theory loss and practical loss computing of the distribution line, the reliability basic data producing and conversing tools, power cut management, the load supplying from other ways, the repairing management on user fault reports, th e new load installing assistant function, the management of hanging the cards and simulating operation, the monitonng and analyzing management of the running information, load monitoring and load density analyzing function and so on

    從系統總體結構,功能結構,開發模式,用戶管理,軟體和數據庫設計,安全性設計,系統效率,開發計劃等方面滿足了系統的總體要求;系統實現了基本圖形操作,電網建模與編輯,設備臺帳及管理,設備操作管理,電力專題圖生成,外介面,輸入輸出, web - gis等基本功能;系統還具有配電線路理論線損計算及實際線損計算,可靠性基礎數據生成和數據轉換工具,停電管理,轉供功能,用戶報修管理,用戶報裝輔助,掛牌管理和模擬操作,信息析監控管理,監控及密度析等高級功能:並能從方式,用戶權限,日誌三個方面闡述本系統的管理方式。系統總體結構合理,功能及介面齊全,配置擴展方便,可操作性強。
  11. First, build the building model and air conditioning dynamic cooling load analysis model of the stock exchange in the basis of the experiment. second, calculate the air conditioning dynamic cooling load in summer ( april to october ) hourly by software simulation, obtain the maximum cooling load daily, the minimum cooling load daily, the proportion of each cooling load occupying the total cooling load and cooling load time frequence, analyse them by using twin load curves. last, contrast theoretical calculations with test results, analyse them and prove the model proper

    首先,以實驗為基礎建立了證券營業的建築模型及空調動態冷析模型;其次,通過逐時逐日計算出了其夏季( 4月? 10月)空調動態冷、各項冷在空調總冷中所佔的比例及空調冷時間頻數,並用雙曲線法對每日最大冷與每日最小冷析;最後,與實測數據進對比,二者曲線基本符合,效果良好,證明所建模型適當。
  12. And, the coefficient of heat conduction, temperature rise and fall in shelter chamber experiment are made, the result shows the stable plate heat conduction method is applicable, the integration of experience formula for calculation of heat and cool load and experiment analysis is suitable for design and validation of temperature in shelter chamber, the integration can nicely reflect the condition of microclimate temperature in shelter chamber, and have importance reference value for research of microclimate condition in shelter chamber. at last, in article the comparison is made between the felt techniques and foam techniques of the laminate plates, and improved manufacture techniques of composite laminate is brought forward. the experiment indicates the improved techniques can ensure the structure strength and heat preservation and insulation performance

    基於軍用醫療方艙特殊的微環境使用要求,用穩定平壁傳熱析方法建立了軍用醫療方艙鋁塑復合夾層大板傳熱系數理論計算模型,對軍用醫療方艙鋁-聚氨酯-鋁復合夾層大板材料隔熱保溫性能進了理論析;用經驗析方法進了冷熱計算析;並對兩計算採用傳熱系數和艙室升溫、降溫試驗進了對比試驗研究,結果表明穩定平壁傳熱析方法計算傳熱系數方法可,為方艙鋁塑夾層大板的隔熱保溫結構和性能設計提供重要依據,並準確表徵艙室內微環境溫度條件,對軍用醫療方艙艙室微環境設計提供參考。
  13. Discussion on operation mode at part load for an its system with a base chiller

    帶基載主機的冰蓄冷系統在工況下模式的探討
  14. So, it is quite necessary to save energy of water systems to lower the total energy consumption of the whole systems. in about 90 % operating times, the air conditioning system runs at 65 % load, the designed condition and part - load operating condition are different, so 1 the operating mode of pumps and chiller should be decided by the actual operating condition of part load in order to distribute the chilled water flux soundly

    由於在的空調系統與設計工況並非一致,而空調系統近90的時間在65的,因此空調系統需要根據實際工況要求來決定水泵和冷水機組的方式,以合理配冷凍水和節約水系統能耗。
  15. The subsidiary generator output depends on the load of power system when the main generator and subsidiary generator operating in separate power system

    當副發電機與主發電機於兩個獨立電網時,由於機組轉速取決于主發電機所在的大電網,副發電機將承擔其所在電網的全變動
  16. In accordance with the practical situation of ben - gang water supply systems, this thesis find out the problem in the operation. the research contents include three aspects which are short - term load forecasting and decision of optimum operation scheme and the renewal of equipment in water supply systems. the firstly discusses the short - term water consumption problem with three models : grey forecasting model, artificial neural network model and modified artificial neural network model, it is very valuable that the modified artificial neural network model

    本文根據本鋼供水系統的實際狀況,找出了本鋼供水系統中存在的不足,進而提出了相應的改進措施。主要內容包括供水系統短期預測,確定系統最優調度方案和設備更新與設備投資問題。在預測用灰色預測方法, bp神經網路方法和改進的神經網路方法進用水量預測,並進比較析,重點提出用遺傳演算法進神經網路權系優化的改進演算法。
分享友人