部撐柱 的英文怎麼說
中文拼音 [bùchēngzhù]
部撐柱
英文
bilge shore-
From quads and hamstrings - adjustable abdominal support prevents spinal
-可調式的腹部支撐可減低脊柱伸展In this test, a special bolt - jack is used to exent of prestressing force to brace angles as the whole structure is under dead - load. in this state brace angles withstand partly load before twice - load and the stress and strain of concrete are decreased. in this way the aim of removal of load and strengthening can be reached
本試驗中採用專用螺栓千斤頂在恆定荷載水平下對混凝土柱角鋼撐桿施加預壓應力,使外包角鋼在二次受力前即分擔部分荷載,使混凝土應力水平和應變水平降低,達到卸載與加固同步進行的目的。It is 19. 5 meters high and 15. 6 meters around at the base. built entirely of wood, the vault is supported by eight pillars. the roof has no beams but only a great number of brackets entwined within each other
它高19 . 5米,底部直徑15 . 6米,全木結構,殿頂由8根立柱支撐,頂無橫梁,由眾多斗拱上疊,天花板層層收縮,構成美麗的穹窿式藻井。Material of moulding and extrusion. metal mould components. support pillar bush
模壓和擠壓材料.金屬模部件.支撐柱套管Wan chai tai fat hau footbridge provides an intriguing display of art. made up of 30, 000 citizens fingerprints, the sticker pictures on the 50 poles of the footbridge, designed by famous artists and lay out " 50 landscapes of wan chai ", are now in line for inclusion in guinness world records primetime. the footbridge gallery is located at the junction of hennessy road and queen s road east
它的前半部建於一個平臺上,由數枝高10至12尺的石柱支撐,後半部則座落在一塊巨石上,惟現時該巨石為外墻所擋,不易見到;樓頂及墻壁的上半部,則繪有龍鳳于雲間飛騰的壁畫以及蓮花圖案。8 all poles, legs, or uprights of scaffolds shall be plumb and rigidly braced to prevent swaying and displacement
所有的腳手架支柱、支架或上部構件都必須垂直並牢固拉撐,以防擺動和位移。The main building is spacious and symmetric in appearance. it features the granite columns of the renaissance style of architecture and has a tower with four turrets on the top
本部大樓地方寬闊、外型勻稱,四周用文藝復興期建築模式的花崗石柱廊所支撐,頂部則建有一座高塔和四座角塔。It is an imposing institutional structure, supported by granite colonnades in renaissance style and surmounted by a tall clock tower and four turrets
大樓宏偉壯觀,以富有文藝復興風格的花崗石柱支撐,頂部矗立著鐘樓,四角則有塔樓。During construction, special building methods were used to limit environmental damage, such as the piles being bored into the seabed rather than pile driven, to avoid mud sediment settling on the corals and killing them. most of the superstructure was prefabricated off - site, brought in by barge and then placed in position by crane to minimise the pollution, rubbish and noise
例如裝設支撐中心的樁柱時採用鉆挖形式,取代普通的打樁方式,務求減少翻起海床的沙泥,避免珊瑚窒息及死亡大部份上層建築組件是在建築地點以外的地方預先製作,並由駁船運到海下,再以吊車裝嵌,從而把施工帶來的污染垃圾及噪音減至最少。In the process of finite element analyzing, the beam, column and b race that not enter the plastic parts adopt bearn element that considered geometry nonlinear. the links entering plastic adopt space degenerate shell element that considered the nonlinear large - deformation, together with mixed hardening rule, which linearly combines isotropic and kinematic hardening
在有限元分析過程中,對于未進入塑性部分的梁、柱及支撐採用梁單元,梁單元考慮了幾何非線性,對于進入塑性部分的耗能梁段採用空間退化曲殼單元,曲殼單元考慮了幾何和材料的雙重非線性,材料的強化採用了混合強化法則,非線性方程通過newton - raphson迭代結合增量法求解。This kind of rack is small goods, maunal picking and big deposition
另可根據底部需求,以承載立柱支撐樓面,設計成鋼結構平臺。The force transducer arranged as an external support between motor and supporting structure monitors the functional safety of the electric drive via the torque
力轉換器作為馬達和支撐結構之間的外部支柱,通過扭矩監控電動驅動裝置的運轉安全。In keeping with architect daniel libeskind ' s overall site plan, there will be access to the stumps of columns that held up the twin towers and to the slurry wall that prevented the hudson river from flooding the site
在和建築師丹尼爾?利伯斯金的遺址整體方案保持一致的情況下,新的設計中還包括支撐雙塔的立柱殘樁和為了防止(紐約州東部的)哈得遜河泛濫淹沒世貿大廈而修建的水泥墻。This method uses pillars of coal to hold up the mine ' s roof
這種方法使用煤柱支撐礦井的頂部。The tower shafts, most of which are hollow and varying in cross section, and altitudinal construction bring trouble to the form work and the stress of strand wire. and the cracks on the crossbeams will be caused by the following - deformation of the bracing structure joints, elastic deformation , uneven settlement and temperature changes. the additional stress of the base slab and the foundation is caused by the deviation of cable bent tower construction
但大跨度橋梁混凝土索塔施工設備進場及現場管理都比較困難;塔柱多為空心變截面,且為高空作業,給模板工程及預應力張拉帶來一定困難;支撐系統連接的間隙變形、彈性變形、不均勻沉降以及環境溫差可導致橫梁裂縫;索塔施工偏位會引起的承臺和基礎的附加應力,對加勁梁的架設影響大;懸吊結構未完體系(架設時)施工階段的風致振動往往影響到施工的安全和質量;實心塔柱部分體積較大,易產生溫度裂縫。As the important part of steel - structure workshop, the study of the lateral brace for columns is significant
作為廠房的組成部分,廠房柱的側向水平支撐的研究有其重要的現實意義。分享友人