鄰接端 的英文怎麼說
中文拼音 [līnjiēduān]
鄰接端
英文
abutting end-
Chagan sag is a secondary tectonic unit in chagandelesu depression, northeastern yingen - eji ' naqi basin, and the basement of the basin is a paleozoic fold belt of continental margin or island arc at the connection region of north china plate * tarim plate and kazakstan plate, with the character of erogenic belt. in working area and its adjacent area, the forming tectonic setting of indosinian intrusion was that orogenic belt pressed strongly, intracontinental subduction ; that of early yanshan movement epoch was the stress field transferred from compression to extension meanwhile the incrassate crust of orogenic zone turned to extensional collapse ; and that of early cretaceous volcanics was that the area structure extensional collapse further more during the post period of orogenic phase
查干凹陷屬于銀根?額濟納旗盆地東北端查干德勒蘇坳陷內的一個次級構造單元,其盆地基底為古生代時期華北板塊、哈薩克斯坦板塊和塔里木板塊交接部位形成的陸緣或島弧褶皺帶,具有古生代造山帶的性質。研究區及鄰區印支期侵入巖形成於造山帶強烈擠壓陸內俯沖的構造環境;燕山早期侵入巖形成於由擠壓轉向拉伸、造山帶的增厚陸殼開始發生伸展垮塌的構造環境;早白堊世火山巖形成於造山期后進一步發生伸展垮塌的區域構造環境。The main popular theoretical method adopted to study end - plate connection is finite element technique under monotonic loading at present. this paper applies nonlinear ( material, geometry and contact ) finite element method to analyze the behaviors of connections under cyclic load at fist time. contact elements are set between end plate and column flange, screw cap and neighborhood plane, bolt bar and hole
對于端板連接的理論分析,目前國內外的研究主要局限在單向加載有限元分析范疇,本文首次採用三維非線性(包括材料、幾何與狀態非線性)有限元對端板連接進行了循環加載分析,端板與柱翼緣間、螺栓頭(帽)與相鄰板件間、螺栓桿與孔壁間都設置了反映邊界狀態的接觸單元。Celi junctions were clear observed at the apex flank betwen epithelial celis of the gastrointestinal tract
鱉胃腸道相鄰粘膜上皮細胞側頂端具有清晰的細胞連接,以小腸段最典型。The carrier wave is modulated directly by the baseband signal at several frequency point in l band and s band. firstly, this paper clarifies the theory of i / q modulation, elaborates evm and acpl, and analyzes the effect of amplitude and phase unbalance and dc offset on evm. secondly we review the basic principle of phase locked loop and it ’ s composing parts, including the basic conception and design method of pll frequency synthesizer, especially introduce the charge pump pll frequency synthesizer in detail
首先,在闡述i / q正交調制基本原理的基礎上,通過對誤差矢量和鄰近通道功率泄漏的詳細分析,定性、定量地討論了各種非理想電路因素(如相位不平衡、幅度不平衡、直流偏差等)對調制器性能的影響;其次,介紹了鎖相環的工作原理和基本組成部分,包括鎖相環的設計和環路濾波器的設計,特別詳述了電荷泵鎖相頻率源;第三,介紹了採用直接調制技術模擬衛星信號的射頻前端的設計;最後,對整個直接射頻調制系統進行測試,結果基本上達到了課題要求。The end result is that the semiconductor and metal form two strips side by side, with all the electrical contacts ? two for sensing a voltage, two for passing a current in and out ? along the free edge of the semiconductor
結果半導體與金屬變成相鄰的長條狀,所有電性接點都接到半導體的露出端:包括兩個用來測量電壓的接點,以及兩個分別讓電流流進與流出的接點。With an area of 5300 km2, dongpu depression is located in the southwest of lin - qing depression, bohaiwan basin, bounded with lu - xi uplift by lan - liao fault in the east, with nei - huang uplift by chang - yuan fault in the west, with lan - kao heave by the north feng - qiu fault in the south, with xin country depression by ma - ling fault in the north, while spreading along nne defection, taking on the forms of being wide in the south, and narrow in the north. it is a rift fault depression basin with the characteristics of striking, with the basement being the paleozoic and mesozoic, and the capping beds being the cenozoic
東濮凹陷位於渤海灣盆地臨清坳陷西南端,東側以蘭聊斷裂為界與魯西隆起為鄰,西側以長垣斷裂為界與內黃隆起相接,南以封丘北斷層為界與與蘭考凸起相鄰,北以馬陵斷層為界與與莘縣凹陷相望,是以古?中生界為基底,以新生界為蓋層,古近紀形成的拉分走滑?裂谷型箕狀斷陷盆地。Two edges are adjacent if they have exactly one common endvertex.
如果兩條邊恰有一個公共端點,就說它們是鄰接的。Failure to ensure that the extraneous conductive parts were effectively connected to the main earthing terminal of the fixed electrical installation, under the condition that the former and any adjacent earthed metal work of electrical equipment were simultaneously accessible, in contravention of regulation 11 ( 4 ) of the electricity ( wiring ) regulations
未能確保將非電氣裝置金屬部分有效地與固定電力裝置的總接地終端連接,而鄰近電力器具的已接地金屬部份與該非電氣裝置金屬部分可同時被觸摸,違反了《電力(線路)規例》第11 ( 4 )條的規定。The second portion is located next to lai chi wo and bounded by the line linking chung wan tsui and the northern tip of kau lo tau
第二部分毗鄰荔枝窩,其界線由涌灣咀起連接九蘆頭的北端。The article probes into the methods of the improvement and the control for high intensity of traffic in e - cube switching system fsr216. 3 while ssp and remote office are overloaded ( include scp and terminated office connecting to e - cube )
本文就網路的瓶頸問題分別從ssp和鄰接局(包括scp和與e ? cube相連的端局)發生過負荷時, e - cube程式控制交換機在版本fsr216 . 3中對大話務量的控制方法及改進。When the user approaches the far edge of the beam, the signal strength can degrade rapidly before the system switches to the adjacent beam
用戶若接近波束遠端邊緣,訊號可能在系統還來不及切換到鄰近波束之前,就已經快速衰減。When making connections, take care that none of the individual conducters of the speaker cord come in contact with adjacent terminals, with other speaker cord conductors, or with the rear panel
意思是「當連接時,小心別讓單個的喇叭線頭碰到鄰近的端子或碰到別的喇叭線頭以及機器后擋板。 」分享友人