配合工序 的英文怎麼說
中文拼音 [pèigěgōngxù]
配合工序
英文
compounding operation-
At the same time, the function of measuring coal in every coal storage bunker and measuring coal before its entering into every boiler greatly improves productivity of the whole loading and unloading coal system. on the aspect of operation technics of the loading and unloading coal system, this article analyzes factors which affect operation technics of coal - whippers, stacking conveyers and pusher tractors. no standardization in daily operation, low safety, long operation time and out of line among different machines reduces the efficiency of the loading and unloading coal system
卸煤操作工藝方面,主要分析了卸船機、堆取料機和推扒機在日常作業過程中影響作業工藝的因素,在日常作業過程中主要存在問題是無標準化作業要求,安全得不到保障,作業時間長,各作業機械之間配合差,從而影響整個卸煤系統的作業效率,本文通過對卸船機、堆取料機、推扒機作業流程的設計,規定了單個機械的作業程序,以及相互之間作業時的配合方法,使卸船機作業和堆場作業更規范化,同時,大大縮短卸船作業時間,提高了碼頭泊位利用率,減少機械作業時間,從而提高了整個輸煤系統的工作效率。Each combination dies, assorted with the press machine, can complete all punching procedures of window frame and window sash of one specification
與該設備配套的每個組合沖模,可完成一種規格的窗扇或窗框的全部沖壓工序。To make quality professional metalwork, the factory has equipped itself with high - class means of inspection and high - caliber management personnel and followed the iso9000 quality standard in sorting, melting, pressing, pulling, etc
鄺邊金屬製品廠為製造品質優良的專業金屬,在原料選配熔煉、鑄造、擠壓、拉伸、退火、酸洗、聯合拉? 、精磨等工序,配備一流的檢查手段,高素質的管理人員,結合iso9000品質管理標準,確保鄺邊銅材品質優良。Uses the sata industry standard connector which includes alignment ears and 3 - stage electrical mating sequence, designed specifically for backplanes and hot pluggability
-採用符合sata工業標準的連接器。該連接器內置對接耳及3階段的電子配對次序,專為背板和熱抽換而設計。According to the mis configuration and flows, dfmis - 1 software system has been programmed which is composed of inventory management subsystem, purchasing management subsystem and manufacturing schedule management subsystem. through studying deeply manufacturing schedule management, we find a way to make mrpii and jit be jointed together into manufacturing schedule and monitoring block. the study discusses especially how to make certain the producing period of all of component during dynamic manufacturing with methods of jit and " electronic bulletin ", how to get true capability of implementing plans in all working procedure section, and how to empower monitoring manufacturing in order to avoiding break between working procedure sections
其中一項就是設計並實施了整個公司的網路綜合布線和計算機系統的配置;第二項是根據公司最急需的功能,從「信息流」 、 「物流」和「資金流」的角度,提出了相適應的mis結構和流程,據此開發出具有庫存、采購和生產計劃管理功能的dfmis - 1軟體系統,並對其中的生產計劃管理模塊進行了較深入的研究,實現了mrpii和jit在生產計劃、生產監督上的結合和應用,特別對利用jit及其「電子看板」在生產動態中確定零部件的生產周期、獲得各工序段實際執行計劃的能力,以及在加強生產監督、避免各工序之間的脫節上做了進一步的探討。Fabrication of the box beam is divided into such parts as reinforcement, formwork, concreting, prestressing, moving and storing of beam, pipe grouting under pressure, end sealing of the beam, water - proof layer on the bridge surface system, protective coating etc. the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects, such technologies as : manufacturing and fixing of reinforcement, steel reinforcement fixing baseplate, web plate and top plate respectively and lifting the steel skeleton into form, requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork, optimization of concrete ratio, concrete pouring process of two ends of beam in priority over the middle, in sequence of first baseplate followed by web plate and top plate at last, concrete pouring in inclined section and in horizontal layer, concrete vibration mainly by external vibrator in assistance with internal vibrator, methods and regulation for steam curing of concrete, dual controls over stress and strain to ensure quality of prestressing workmanship, construction method of effective beam moving by heavy - weight special moving facility, some regulations and key notes about construction of grouting under pressure, beam ends sealing, water - proof layer on the bridge surface system, protective coating
箱梁製造由鋼筋工程、模板工程、混凝土工程、預應力工程、移存梁工程、孔道壓漿工程、梁體封端工程、橋面防水層和保護層工程等施工環節組成。文中介紹的採用胎具製作和綁扎鋼筋,分底腹板和頂板分別綁扎並吊裝鋼筋骨架入模;拆裝式和液壓式兩種模板的設計、製作要求和使用方法;綜合考慮、優化混凝土配合比,混凝土灌注從兩端至中間、先底板、后腹板、再頂板的施工順序和斜向分段、腹板水平分層、附著式振搗為主、插入式搗固為輔的施工工藝,蒸汽養護的方法和規定;應力應變雙控制確保預應力施工質量的施工技術;採用重物移運器有效移梁的施工方法;壓漿、封端、橋面防水層和保護層施工的一些規定和注意事項等都是對箱梁製造行之有效的施工技術和施工方法,並可為以後類似施工作借鑒。The demodulation circuit interfaced with the local bus, demodulates the signals transmitted on the pstn and restores the acquired data. in order to work nomally, hardware needs cooperation with software. the driver for pci demodulator has been developed
本地總線上掛接解調電路,對傳輸來的信號進行解調,恢復採集的數據。硬體需有軟體的配合才能正常的工作,因此為pci解調器設計了驅動程序。Accessibility programming is the process of designing and developing specialized applications that work with a computer s operating system to accommodate specific impairments, such as a limited range of motion or blindness
輔助功能編程是設計和開發這樣的專用應用程序的過程:這些應用程序與計算機的操作系統配合工作以適應特定的身體缺陷,例如行動不便或失明等。Time standards for nkr front axle assembly line, jap, is reset based on modapts, and time unit is reduced, and capability of the line is induced. the balance rate of the assembly line is developed from 62 % to 76 % by process elimination, combination, rearrangement, and simplification applied with rules for motion economy and eff iciency
論文應用模特排時法對江鈴車橋廠nkr前橋裝配線重新制訂工時定額標準,降低裝配線生產節拍,提高裝配線生產能力,按照動作經濟原則,通過工序剔除、合併、重排、簡化使前橋裝配線作業平衡率由62提高到76 。The thing flows the trolley name carrying trolley ; the surface uses the electricity to galvanize, the contour artisticly, the service life is long ; attaches the security leather belt, the fixed link loading and unloading speed is quick, both is advantageous for the mechanized transporting, and is suitable for the short distance the manual shift, may realize the plan production, saves the manpower, reduces the cost ; with thing and so on turnover box flows the vessel coordination use, may realize the modular management, the setting at space is big, folds the collection not to occupy the space ; is suitable the thing flows the transporting in the enterprise working procedure ; also may or allocates and dispatches the center in the factory to install the cargo to transport to the store, a direct achievement commodity goods part
物流臺車又稱載物臺車;表面採用電氣鍍鋅、外形美觀、使用壽命長;附安全皮帶、固定桿裝卸速度快,既便於機械化搬運,又宜於短距離的人力移動,可實現規劃生產,節省人力,降低成本;與周轉箱等物流容器配合使用,可實現單元化管理,置物空間大,折疊收藏不佔空間;適用於企業工序間的物流搬運;也可在工廠或配送中心裝上貨物運到商店,直接作為商品貨架的一部分。The high balance crane is widely used for the material feeding and laying off of lathe in the workshop, the workpiece swinging and the spare part assembling of production line in processing room, and the swinging in warehouse and other places
機械高型平衡吊廣泛用於工廠車間的機床上下料工序間生產線的工件吊運零部件裝配及車間碼頭倉庫等到場合的吊運作業。At present, consensus about rural industrialization and rural population migrants has not been achieved in the economic literatures, controversies still exist about strategic status of rural modernization and choices of rural industrialization and choices of rural population migrants ; in pr - actice, although usually emphasize the importance of problem of the farmer and rural and agriculture, but always did not put a premium on the rural reformation, only from the perspective of provisionment security and social stablity and expanding demand. various policies does not coordi ? ated
目前,理論界對農村工業化和農村人口城鎮化的認識還不一致,對農村經濟現代化的戰略地位、農村工業化道路選擇、農村人口城鎮化道路選擇等問題存在一定的分歧;在實踐中,雖然經常強調農業和農民問題的重要性,但始終沒有將進一步推進以農村為重心的改革提高到戰略高度,只從保障糧食供給和穩定社會秩序、擴大內需的角度來強調「三農」工作的重要性,各項政策措施缺少協調配合。In this paper, referring to qingju water power station, temperature control analysis and study has been done : study on the match ratio of the concrete and question of modifying of the special fine sand concrete to improve resisting ability of splitting of concrete ; study on the technology of the highly mixed fly ash to reduce the adiabatic temperature rise of concrete ; in case of the condition of resisting splitting to allow, study on the temperature control measure to strengthen and water the size of building, simplify the operational procedure, accelerate the construction speed, economize the expenses of the project
溫控問題成為青居水電站設計和施工的關鍵技術問題。 、本文對水工大體積混凝土溫控問題進行了分析和總結,結合青居水電站閘壩工程,開展溫度應力及溫度控制研究:研究混凝土的配合比及特細砂混凝土『改性問題,提高混凝土的抗裂能力;研究高摻粉煤灰技術,降低混凝土的絕熱溫升:在抗裂條件允許的情況下,研究施工過程中溫控措施的簡化,以加大澆築尺寸,簡化施工程序,加快施工進度,節約工程費用。This dissertation is faced to the process of steel rolling to found network of manufacture material flow, basing on it founding guide line evaluation system of the cost of unit standard producing working procedure, guide line evaluation system of the quality cost of unit standard producing working procedure and guide line evaluation system of performance and efficiency ; and base on the cost data of all kinds of material flows, manufacture flow, flux data, manpower, energy consume, material consume, capital asserts occupied, fund occupied, and the production in working procedure, throughput of the materials in working procedures in the flow and countercurrent flow in the network of material flow of recorded in working procedure producing, using the “ whole closed down lane ” model to describe network of manufacture material flow of steel rolling, found the cost analyzing model system of the network faced to producing process. make the cost increasing of the producing by abnormity material flow in working procedure, and even the cost increasing of the producing procedure as the cost of the management behavior of working procedure fallen under cost evaluation guideline in responsible working procedure, so as to ration measure the factors fast correlated with management behavior by measuring the cost
在企業管理信息化輔助工具所建立的數據平臺基礎上,建立了以基準物流圖模型為基礎的軋鋼生產主流程物流網路拓撲圖,根據圖論的理論求解最大流量和最小費用;計算每個生產節點的加工成本,分離質量成本,克服了單純財務數據進行成本核算所帶來的缺陷;建立了軋鋼生產主流程工序含鐵物料吞吐能力基準圖模型,並根據此模型建立了軋鋼生產主流程工序激勵物流協調性和匹配性、工序響應物流協調性和匹配性分析的過程能力指數計算方法;通過引入決策單元綜合投入與綜合產出效率最優原則的模型和基於投入不變、分析產出是否有效或基於產出不變、分析投入是否有效的模型,實現了對多個績效指標在不同績效值集合之間的相對比較,並可根據投入產出效率準則、或者投入(產出)有效性準則進行排序。Secondly, the interface and coordination of time order are analyzed in light of the principle of ccd. the image data is collected by single - chip computer, and then transferred to a personal computer where a software programmed with vc shows the data and a clear image can be seen
在解決紙幣圖像讀入的過程中:從ccd的工作原理出發,系統的分析了ccd和微處理器的介面和時序配合問題,在走紙機構、光學系統的配合下採用單片機系統成功的讀入了紙幣圖像數據。Insulation co - ordination - part 5 : procedures for high - voltage direct current converter stations
絕緣配合.第5部分:高壓直流電流變壓器站的工作程序Automatic control system in the production of jin liquor refers to rational unit division and allocation of the main processing procedures such as the extraction of efficient components from herbs, production materials distribution, liquor aging, filtration and filling etc. and all the production units are computer - controlled and network communication has realized automatic control
摘要對保健酒生產過程中中藥材有效成分的提取、物料調配、陳釀、精濾和灌裝等主要工序進行合理細分單元和配置,科學地對生產單元的管理採用計算機控制系統和網路通訊技術進行自動控制。Process capability index ( pci ) is also an important method to measure and improve quality, which has play a key role in assuring quality evidence, lowering cost and raising customer satisfaction indexes ( csi ). this paper studies the applications of pci and control chart from the actual viewpoint, and discusses the applications of the probability a, ( 3 of type i, ii error of the control chart, the detecting power and pci based on x control chart. in addition we explore the relationship between qlf and pci, put forward the concepts of relative loss and loss extent, adopt the linear plan to optimize pci and decide the best loss extent of each process. an example is given
)控制圖為例,討論了控制圖的兩類錯誤、檢出力與過程能力指數在實際中的應用;重要的是討論了質量損失與過程能力指數之間的關系,提出了相對質量損失、損失度等概念;研究了多道工序相對質量損失、損失度對總質量損失的影響,並從質量損失的角度出發,採用線性規劃的方法,優化多工序的過程能力指數,確定各道工序的最佳損失度,實證討論了這種關系,同時可以利用這種關系對供應商進行評價,給出了從全局的、動態的角度選擇供應商的方法,為上下游企業間的配合、監督及共同進步提供了理論基礎和實現途徑。The key to improve the quality of the motor is to control the quality of the core strictly. this includes many kinds of ways, such as design, manufacture, procedure
控制鐵芯的生產質量需從多方面來考慮,包括產品總體設計、製造工藝設計、工序間相互配合設計等等。The construction processes of large - scale underground structure group are very complicated. in order to quicken the construction processes, reduce price and assure success, it is necessary that adopting scientific system simulation method to simulate the whole construction processes, to make all tunnels, all activities and all machine equipment harmonious and make construction sequence schedule reasonable
大型地下洞室群施工過程是極其復雜的,採用科學的系統模擬方法對地下洞室群施工全過程進行模擬,使各洞室、工序及施工機械設備相互協調配合,使洞室群施工順序和施工進度計劃更加合理,對于加快洞室群施工進度,降低工程造價,保證工程順利進行非常必要。分享友人