配筋不足的 的英文怎麼說

中文拼音 [pèijīnde]
配筋不足的 英文
under reinforced
  • : Ⅰ動詞1 (兩性結合) join in marriage 2 (使動物交配) mate (animals) 3 (按適當的標準或比例加以...
  • : 名詞1 (肌的舊稱) muscle2 [口語] (肌腱或骨頭的韌帶) tendon; sinew 3 [口語] (可以看見的皮下靜...
  • : 名詞[書面語] (剁物所用的木墩) a block of wood
  • : Ⅰ名詞1 (腳; 腿) foot; leg 2 (姓氏) a surname Ⅱ形容詞(充足; 足夠) sufficient; ample; enough;...
  • : 4次方是 The fourth power of 2 is direction
  1. This paper is focused on a series of experiments including two kinds of large - scale composite walls with different joint fashion under low cyclic loadings. the experiments are carried out in order to know the seismic of composite walls out - of - plane and research the impact of deformation out - of - plane on carrying ability in - plane, experimental design reference is expected to achieve and tech support provide

    為了彌補這方面研究,本文對兩種連接方式尺復合墻片進行了低周反復荷載作用下恢復力試驗,以了解砌塊復合墻平面外抗震性能,同時研究平面外變形對墻體平面內抗震性能影響,為砌塊復合墻設計提供依據。
  2. Not only the load is considered, but also the distance, the span, the wide and the percent of the reinforcement is considered. the chosen section is also meeted the stiffness

    該公式僅考慮到荷載大小、而且考慮了梁格間距、跨度、梁寬、以及梁率等因素,且所選截面滿剛度要求。
  3. The scc has the following advantages : remarkably reducing the noisy pollution and the worker s labor intensity in construction, deducing the rough surface or segregation because of missing - vibration or excessive - vibration in conventional construction, resolving the quality - defect problems resulting from lacking - vibration in the section of complex shapes and densely - packed reinforcement area. at the same time, large of industrial solid waste such as fly ash and blast furnace slag is utilized in the proportioning of scc. it is helpful in comprehensive utilization of resource and environment protection, so the scc belongs to " green concrete ", it is a branch of hpc which will be developed in the future

    這種混凝土可以顯著降低混凝土施工中噪音污染;大幅度減輕工人勞動強度;減少傳統混凝土施工中因漏振或過振造成麻面或離析;解決了密集、結構復雜部位因振搗而造成質量缺陷問題;同時,由於自密實混凝土在製中,大量利用粉煤灰、高爐礦渣等工業固體廢棄物,有利於資源綜合利用和生態環境保護;從而被譽為「綠色混凝土」 ,是未來混凝土向高性能發展方向之一。
  4. Firstly, the master zhang binbin ' s tests further verified that the design methods brought forward by the code for design of reinforced concrete high - rise structure ( jgj3 - 2002 ) can not satisfy basic seismic requirement. at the same time, our research group find that some acceptable improved reinforcement arrangement scheme in domestic and foreign researches can not attain satisfying ductility performance

    其中首先通過碩士研究生張彬彬試驗研究工作,進一步證實《高層建築混凝土結構技術規程》 ( jgj3 - 2002 )提出設計方法能滿抗震基本要求;同時查明,國內外已提出某些施工可以接受改進方案仍未達到較滿意延性性能。
  5. In order to reveal load mechanism and failure mode of thick pile caps, by means of the test of 1 / 4 - scale models of thick pile caps with six piles and post - handling study of 3 - dimensional non - linear finite element adina, this paper points out the shortage, which is that the design of pile caps is carried out by flexural strength in chinese technical code for building pile foundations jgj94 - 94 and american reinforcement concrete building construction code aci318 - 02, promulgates that the failure mode of thick pile caps is punching failure and load transfer mechanism is the strut - and - tie, which is that zones of concrete with primarily unidirectional compressive stresses are modeled by compress struts, while tension ties are used to model longitudinal reinforcement over pile

    摘要為揭示厚承臺傳力機理和破壞形式,通過對4個1 : 5比例六樁厚承臺模型試驗研究與三維非線性有限元adina后處理研究,指出中國建築樁基技術規范jgj94 - 94與美國鋼砼房屋建築規范aci318 - 02規范中,承臺以彎曲強度進行計算設計方法之,揭示出厚承臺破壞模式是沖切破壞,傳力機理是以帶有主要單向壓應力砼區域作斜壓桿,樁頂區域作拉桿空間桁架。
  6. Have to out : 1 temperature constructional reinforcing not can place in heat area to mass concrete design. temperature constructional reinforcing of bottom of mass concrete need content that owing to temperature change produce bottom control stress smaller than anti - pull strength at the same. get minimum rate of reinforcing to content construct request

    得出: 1在大體積混凝土結構溫度構造鋼置中,構造鋼宜放置於高溫區;大體積混凝土底部溫度構造鋼應滿溫度變化產生底部約束拉應力小於混凝土同齡期抗拉強度要求,從而求出抗拉要求最小率。
  7. Effect of load and indirect load such as shrinkage, creep was often taken into account separately to satisfy the requirement of crack width in reinforcement design of large area prestressed concrete frame structures

    摘要大面積預應力混凝土框架結構設計時一般將直接荷載產生作用與溫度、混凝土收縮產生作用分開計算,分別以滿裂縫控制要求,這種做法盡合理。
  8. Middle strength ( 1370mpa ) spiral ribs steel wires is a new type of high strength and good ductility and anchoring strength rolled steel, which is the ideal steel for the high effective pre - stressed reinforced concrete hollow slab. the slab with it has lower price than the traditional ones as well better mechanical property

    中強( dw1370 )螺旋肋鋼絲是一種強度高、延性好、錨固性能優良新型材料,是高效預應力空心板理想受力鋼,以這種鋼預應力空心板僅具有較好力學性能,滿現代建築市場對預應力空心板要求,而且其價格比低於傳統冷加工鋼
  9. In the light of the deficiency of the routine calculating method in the application of multi - curve style prestress steel bar in the large span structures, an applied program is written to calculate the loss of the prestress. fem is used to calculating the concrete stress of the frame beam under prestress load, in the process of which, many successful improvements have been made in the element division, load application and the treatment of the support restraint

    針對常規計算方法在大跨結構中預應力多波曲線置應用中,編制了計算預應力損失應用程序;用fem計算了框架梁在預應力載荷作用下混凝土應力,其間在單元劃分、載荷施加及支座約束處理上有成功改進。
  10. In this paper, there are three main purposes to be attained. firstly, enough ductility of coupling beams is needed, namely no shear failure occurs too early. secondly, the capacity of energy dissipation is satisfied on the grounds of enough stiffness

    本文主要研究目是首先保證連梁具有延性,即保證連梁端部在達到較大彎矩之前,過早發生剪切破壞;其次是在保證剪力墻整體強度前提下,連梁還需具有良好耗能性能;連梁構造太復雜,方便施工。
分享友人