配置項驗證 的英文怎麼說

中文拼音 [pèizhìxiàngyànzhèng]
配置項驗證 英文
configuration item verification
  • : Ⅰ動詞1 (兩性結合) join in marriage 2 (使動物交配) mate (animals) 3 (按適當的標準或比例加以...
  • : 動詞1. (擱; 放) place; put; lay 2. (設立; 布置) set up; establish; arrange; fix up 3. (購置) buy; purchase
  • : Ⅰ名詞1 (頸的後部) nape (of the neck) 2 (款項) sum (of money) 3 [數學] (不用加、減號連接...
  • : 動詞1. (察看; 查考) examine; check; test 2. (產生預期的效果) prove effective; produce the expected result
  • : Ⅰ動詞(證明) prove; verify; demonstrate Ⅱ名詞1 (證據) evidence; proof; testimony; witness 2 (...
  • 配置 : dispose (troops, etc. ); deploy; allocation; collocation; configuration; positioning; allotment
  • 驗證 : test and verify; checking; proving; testing; confirmation; [數學] corroboration; inspection; veri...
  1. Then we define criterions including a series of software practice process and method and tools, which are also fit most of home software corporation to application software exploration and fit them to improve their software exploration engineering management before passing evaluation of cmm. the criterions we defined using a series normative process and document to engineer software exploration, which include " project management criterion ", " configuration management criterion ", " software test criterion ", " document writing criterion ", " software exploration and maintenance criterion ", ' software life cycle guide ", etc. " project management criterion " defines area and principle of software research management, which is practiced to manage the people, technology, resources, software, process and so on to improve efficiency and to ensure quality and increase income

    目管理規程》定義軟體研發管理的范圍、原則,通過實施該規程來對目中的人員、技術、資源、軟體、過程等進行全方位的管理,一西南石油學院碩卜學位畢業論文以達到提高效率、保質量、降低消耗、增加收益的最終目的; 《管理規程》 ,通過實施該規程對目開發過程中的所有資源進行控制; 《軟體測試規程》定義對軟體系統測試所用工具、過程和責任: 《文檔編制規程》提供滿足國家《計算機軟體文檔編制規范gb8567 》標準的各種文檔模板來建立統一的文檔編制規范; 《軟體開發和維護規程》定義了軟體開發過程以及採取的方法和工具; 《軟體生命周期指南》 ,根據軟體目管理的經,將典型軟體過程形成軟體過程模型,用於指導以後軟體周期的選擇; 《年度公司規劃》 ,對需要公司總體安排的資源統一調度的過程。
  2. In this paper, the hal - c conception is studied according to the project requirements, and describes the functions of the hal - c in software waveform implementation. then the issues implementing the hal - c on the specialized hardware processor are addressed, and the methods of managing the components on fpga and dsp by proxy components with the domain descriptor file and the configuration table are brought out. in the end, the validity of the proposed methods is tested

    論文以sca體系結構實現目為背景,深入研究了sca專用硬體補充規范,重點分析了硬體抽象層連接的意義以及它在波形組件開發中的作用,提出了它在dsp / fpga上實現的方法、步驟;接著從sca波形應用的角度描述了硬體抽象層連接在波形開發中的作用,給出了代理組件如何通過域描述文件和表管理專用硬體處理器上演算法組件的方法;最後對dsp / fpga上的硬體抽象層連接進行了性測試。
  3. Then the coupling beams with new reinforcement layout were made an inquiry into, and the improvement on the seismic behavior by coupling beams diagonally reinforced with a few rows in end regions was found out at last, based on the observations of the experimental phenomena and the analysis of the measurement result, and by the comparison of seismic behavior by making use of hysteretic response, ductility and energy dissipation behavior, a conclusion is presented : the code for design and construction of reinforced concrete high - rise structures ( the draft asked for advise hi 2000 ) ca n ' t ensure that the coupling beams have fairly good seismic ductility ; the result of improvement of the seismic ductility of the coupling beams by the increase hi stirrups besides the strengthen of longitudinal detailing reinforcement was n ' t obvious ; the coupling beams diagonally reinforced with a few rows in end regions have fairly good mechanisms, and the ductility and the behavior of energy dissipation are better than conventionally reinforced concrete coupling beams, so it is suitable to te tised in short coupling beams

    本文通過對三根小跨高比(均為l h = 1 . 0 )剪力墻洞口連系梁在低周反復荷載作用下的試,了解了嚴格按《鋼筋混凝土高層建築結構設計與施工規程》 ( 2000年徵求意見稿)設計的連梁具有的抗震性能,研究了採取增大連梁箍量同時加強縱向構造筋的方案對抗震性能的影響,並進一步對新的筋形式的連梁進行了探討,了解了在連梁梁端多排交叉斜筋方案對連梁抗震性能的改善。通過對試現象的觀察和量測結果的分析,利用荷載?位移滯回曲線、延性和耗能性能等指標對各個試件的抗震性能進行了比較,最後得出結論: 《鋼筋混凝土高層建築結構設計與施工規程》 ( 2000年徵求意見稿)不能保小跨高比連梁具有較好的抗震延性:通過增大連梁箍量同時加強縱向構造筋的方案對改善連梁的抗震延性的效果不太明顯;梁端多排交叉斜筋的連梁具有相對較好的受力性能,其延性和耗能性能等各性能指標均優于普通筋連梁,宜在深連梁中採用。
  4. Now every work item can be claimed by any unauthenticated user and you can skip part 12. with this configuration, you don t need to have a manager group either

    現在任意未經的用戶都可以聲明每一個工作目,用戶可以使用該略過第12部分,用戶也不必擁有manager組。
  5. In has been through repeatedly the construction plan layout builds the technology necessary after each item, is the base construction excellent stage, each step repeatedly confirms and practices the part which the manufacture pretage plans, in builds in the process respectfully to obey the labor to settle with the environmental protection high standard demand, in safest, the steady process constructs constructs the high quality to construct the thing

    在歷經建築規劃布局與各營造技術套之後,就是基地施做的精良階段,每一個步驟均反覆與實踐出製造前所規劃的部份,在營造過程中恪遵工安與環保高標準需求,在最安全、穩健的過程中建構出高品質建物。
  6. Configuration item verification procedures

    配置項驗證程序
  7. Configuration item verification

    配置項驗證
分享友人