配電站 的英文怎麼說

中文拼音 [pèidiànzhàn]
配電站 英文
control centre
  • : Ⅰ動詞1 (兩性結合) join in marriage 2 (使動物交配) mate (animals) 3 (按適當的標準或比例加以...
  • : Ⅰ名詞1 (有電荷存在和電荷變化的現象) electricity 2 (電報) telegram; cable Ⅱ動詞1 (觸電) give...
  • : Ⅰ動詞1 (站立) stand; be on one s feet 2 (停下來; 停留) stop; halt; pause Ⅱ名詞1 (停車點) st...
  • 電站 : power station電站船 generating ship
  1. The following are the large projects undertaking by haifeng company : crude oil electricity plant project of north china oil field hydroelectricity factory, apartment ( 22 stories ) of yuanda real estate company of dalian shipping group, helios hotel of helios group in dalian development zone, tilt aqueduct bridge of shanxi hongqi reservoir ( total span : 267m ), supply and sale building and city construction building ( both are antique architectures ) of shanxi heyang city, sea drainage pipe of hainan fudao fertilizer factory ( 1520 ), 8 oilgas docks of hainan haiyan oilgas company, basha condensable gas transfer station of haiyan company, 10, 000m3 oilgas storage tank of arco company ( usa ) in hainan nanshan, gas pipe and fuel gas installation project of hainan nanshan electricity co., ltd, base and accessory project of hainan gas company, bei da huang cereal and oil market in harerbin, hainan cross island pipe, changhuajiang river pipe crossing project, taihangshan mountain earthwork project ( the 19th section of west - to - east gas transmission project )

    海南海峰公司承建大的工程項目:華北油田水廠原油發工程;大連船泊集團遠達地產公司的遠達公寓( 22層) ;大連開發區香港太陽神集團的太陽神大酒店;陜西紅旗水庫斜拉渡槽工程(全跨267m ) ;陜西合陽供銷大樓及城建大樓(均為仿古) ;海南富島化肥廠排海管線( 1520 ) ;海南海燕油氣公司八所油氣碼頭;海燕公司白沙液化氣中轉;海南南山美國阿科公司儲油氣萬立米大罐工程;海南南山力股份有限公司天然氣管線及燃氣安裝工程;海南南海天然氣有限公司基地及套工程;哈爾濱北大荒糧油批發市場;海南環島管線;昌化江穿越工程;西氣東輸十九標段,太行山土石方工程。
  2. ( 5 ) adopt the embedded system to construct sub control center, system structure tightly packed, the cost declines consumedly

    ( 5 )采樣嵌入式系統構造的,系統結構緊湊,成本大大降低。
  3. The functions of this automation system focus on five aspects : data acquisition 、 supervision and control 、 fault isolate and recovery 、 gis 、 data statistic and report. the design project takes the rcs - 9000 series 、 sd ? 9520 and sd - 9630, which is a new installation that can detect the operation state of the low - voltage current breaker, and send the state to the control room. the other new installation is sd - 9860, which is the monitor of the cable fault

    設計方案中,在採用南瑞rcs - 9000系列、雙公司sd - 9520裝置的同時,採用了新開發的sd - 9630塑殼開關運行狀態採集裝置,檢測塑殼開關的運行狀態,並將運行狀態傳回到集控中心(中間) ;採用了新開發的sd - 9860纜故障指示器,完成纜故障的識別;集控中心的設計實現了整個小區自動化系統的集中通訊、實時監控、統計與管理功能;高、低壓開關實現了自動控制、狀態檢測和無功補償等。
  4. Based on the demand of power department, a full distributed multifuncitional monitoring device is studied. this instrument not only can measure the data of hydroelectric plant, but also integrate the funcition of control the dynamotor, by cooperate with the program of epigynous system, it can realization the auto generate electricity on the hydroelectric plant and ordinal startup - stop of the dynamotor. 2 furthermore, performance of integrated dft arithmetic enhances the acturacy and reliability of measure. by communication several devices can run online to be controlled dispersedly and managed centrally

    本文分析了國內外水自動控制裝置的研究和發展狀況,尤其是國內小型水的自動化現狀,針對現有力部門的需求,設計並實現了一種單元式的微機自動監控裝置,該裝置不僅實現了對水內各種模擬參數和數字信號的實時監測功能,還對水輪發機組進行了調控,通過與上位機處理程序的合,可以實現水的自動發控制、機組順序啟停;在測量發機組機端壓和流參數的時候,採用32點離散傅立葉演算法( dft ) ,增加了測量的準確性和可靠性;通過通訊可以實現裝置的聯網運行,做到「分散控制、集中管理」 。
  5. In order to obtain the most economic benefits, the paper utilized the theory of " homalographic characteristic " and " share alike compensation current characteristic " to build up the best compensation relation for " hour - current " curve applied to transformer substation and for " length - current " curve applied to distribution line

    以獲得最大經濟效益為目標,利用「等面積特性」和「補償流等分特性」理論。推導了應用於變的「時間?流」曲線關系中存在的最佳補償關系,以及應用於線路的「長度?流」曲線關系中存在的最佳補償關系,及補償后的經濟效益計算模型。
  6. Abstract for the foursquare - distribution direct current firing implement, the distributing evenness of its air quantity and powdered coal quantity is very important to the safe and economical operation of power plant boiler

    鍋爐的運行中,對於四角布置的直流燃燒器,其風量和煤粉量分的均勻性對鍋爐安全和經濟運行有著重要意義。
  7. On design and disposition of unmanned substations

    淺談無人值守變的設計與
  8. As the important tache, substation is the main surveillant and manipulative point of the electric network

    作為輸系統中的重要環節,變網的主要監控點。
  9. During the optimization of the tie lines for urban medium voltage distribution network, different traverse of the transformer substations will bring different results

    摘要城市中壓網聯絡線優化的過程中,不同的變遍歷順序,可能帶來不同的聯絡線優化方案。
  10. Three steps of the method are, first, genetic algorithm is adopted in the whole planning area to hunt the possible traverse sequence of the substations ; second, the least weight match algorithm in graph theory is adopted to optimize the tie lines between each substation and its neighbors according to the traverse sequence determined in the first step ; finally, the scheme which has the least cost of investment in tie lines will be taken as the ultimate scheme

    第一層優化是在整個規劃區域內,應用遺傳演算法搜索可能的變的遍歷順序;第二層優化是按照第一層優化確定的遍歷順序,應用綱絡圖論中的最小權匹演算法分別對每一個變與其相鄰之間的聯絡線進行優化。
  11. A ship ' s power station is a plant which generators and continuously supplies electric power to various auxiliary machinery on board and meets the electric power demands of the whole ship. normally, a ship ' s power station consists of a prime mover, generators and their ancillary equipment ( to form generators sets ) and distribution boards, being an essential part of the power system on board a ship

    船舶是產生並連續供給輔助機械及全船所需能的設備,它由原動機、發機和附屬設備(組合成發機組)及板組成,是船舶力系統的核心部分。
  12. ( 3 ) according to compensation benefit formation cause and scientific, rational, impartial, equitable distribution principle, put forward distribution project of water supply and generation electricity compensation benefit in the main stream of the yellow river

    ( 3 )根據補償效益成因分析及科學、合理、公平、公正的分原則,提出黃河幹流梯級水補償效益中的供水和發效益的初步分方案。
  13. Built up the optimal compensation regulation model of cascade hydropower stations for water resources system in the main stream of the yellow river, adopted poa method to solve optimal model in order to analysis water supply and generation electricity compensation benefits, discussed its distribution project and implementation countermeasures

    本論文主要針對黃河幹流水資源系統建立幹流梯級水庫、補償調節優化模型,採用逐步優化演算法( poa )求解模型,定量分析計算了黃河幹流水量以及量補償效益,探討了黃河幹流補償效益的分方案和實施對策。
  14. This paper presents the way to configurate the distribution transformer, and the setting method for the stator earth fault protection with the example of hubei tiantang pump - storage power plant

    針對變壓器裝置提供了一套較完整的置和整定計算方法,並結合湖北天堂抽水蓄能的實例進行計算, ?此類接地方式提供了可借鑒的方法。
  15. Consumer substations installed inside a building and fed by hv public distribution system up to 33 kv

    由hv公共系統供的建築物內部的用戶熱力
  16. 33 kv consumer substations - pole - mounted substations fed by an overhead hv public distribution system up to 33 kv

    消費者變.由架空高壓公共系統
  17. Then the sub control center application system is designed out by the uml design method

    在此基礎上採用uml的設計方法對的應用系統進行了設計。
  18. Aiming at such problems in combustion system of homemade middle and miniature boiler, as a complex system with the character of dead zone, time variation, serious non - linearity, large time delay, coupling and a lot of disturbance, this paper presents a new set of optimal control resources. by using well - matched control method on system, stable automatic running is realized. having the serious divulgence coals difference a lot from each other in character, instability of chemistry, value of lowest emission of heat, home - made boiler controller is not at all ideal. instead of traditional model that controls the ratio based on proportional control or with the correct signal of the amount of oxygen, this paper, combined with intellect control theory - - fuzzy control and self - optimizing concept, propounded a kind of fuzzy self - optimizing controller to be used in air supplying system of the boiler, and expatiates on the idea of dividing the control process into two parts, dynamic and static to realize, thus meets the demand of homemade boiler economic running

    本設計針對國產中、小型鍋爐燃燒系統參數時變、嚴重非線性、干擾因素復雜、耦合嚴重、模型不易確定的特點,提出多變量協調控制方案,解決了系統可控性差,難以實現穩定自動運行的問題;在此基礎上,改變以往以煙氣含氧量控制送風的傳統模式,針對國產鍋爐設備主體及一、二次送風迴路泄露嚴重,煤種混雜、成分不穩定、燃燒發熱值低、燃燒效率不高等問題,應用智能控制理論中的模糊控制技術,結合自尋最優控制的思想,設計了一種模糊自尋優控制器,應用在鍋爐送風控制系統上,並闡述了動靜態兩種實現途徑,通過在線優化風煤比,實現最佳經濟燃燒,切實保障了鍋爐的經濟運行。
  19. This paper analyzes the character of the transformer load and presents the control means to reduce the comprehensive power loss to minimum by controlling the transformer operation status, which forecasts the daily load of transformer by periodical auto - regression model ( par ) and divides the daily flow line automatically into two typical phases. then, this paper simulates the par by matlab. at last, a real intelligent control device based on the ti ’ s tms320lf2407 dsp has been completed

    論文分析了變壓器的負載特點;提出採用周期自回歸模型預測配電站日負荷,根據負荷預測結果和用時段,以綜合功率損耗最小為目的變壓器經濟運行控制方法;以ti公司的tms320lf2407dsp為基礎,完成了配電站變壓器經濟運行智能監控裝置的研製。
  20. Power supply : specialized in the design of h. t l. t substation and grounding system

    設計組:高低變配電站設計工程防雷系統。
分享友人