采場礦柱 的英文怎麼說
中文拼音 [cǎichǎngkuàngzhù]
采場礦柱
英文
stope pillar-
With computer imitation and laboratory physical analog as the lead and on the basis of test ore blocks and industrial blownoff - ore rock tests, study on the enlarged - structure parameters of sublevel caving in meishan iron mine was carried out, which included single tests of drilling and blasting parameters , transition sublevels and equipment complementation. the timely popularization of this enlarging structural parameter technique has greatly improved the performances of the sublevel caving mining and promoted the technological advance of underground mining
梅山鐵礦加大無底柱分段崩落法采礦結構參數研究,採用計算機模擬、實驗室物理模擬為先導,試驗礦塊、工業放出體試驗為基礎,分別進行了采場鑿巖爆破參數、過渡分段、設備配套等單項試驗,並在全礦及時進行了推廣應用,極大地改善了礦石開采過程中的各項指標,促進了地下礦山開採的技術進步。The study indicates that with the increase of the coal pillar width the peak mining stress delays its appearance and the increase of the displacement and stress are not synchronous
研究表明,綜放沿空留巷受采場礦壓影響時間和程度隨留巷煤柱寬度的增加表現出明顯帶后現象以及位移和壓力增長的不同步現象。Abstract : this paper discussed the roadways pressure characteristics of south sublevel caving region in fengshan copper mine. by means of engineering practice and the measure results in site test, to counter the feature of roadways pressure, the supporting / reforcing technology of roadways and the controlling treatments for ground pressure is proposed in varying geological conditions
文摘:對豐山銅礦南緣無底柱崩落法采區的巷道地壓特徵進行了探討,針對其地壓顯現特點,結合工程實踐和現場實驗測量的結果,提出了不同地質條件下巷道的支護加固方案和地壓控制措施。
分享友人