采完的礦 的英文怎麼說

中文拼音 [cǎiwándekuàng]
采完的礦 英文
worked-out mine
  • : 采名詞(采地) feudal estate
  • : 4次方是 The fourth power of 2 is direction
  • : 名詞1. (礦床) ore [mineral] deposit 2. (礦石) ore 3. (開采礦物的場所) mine
  1. The kilns at wun yiu finally ceased to operate in 1932. mr. au ka - fat, a local archaeologist, conducted two archaeological investigations at the wun yiu kiln site in 1995 and 1999 and discovered well - preserved remains including china clay quarrying pits, water mills, animal - driven grinder, clay - soaking tanks, paste - making workshop and dragon kilns, which illustrate the complete process of porcelain production. this is in fact a very rare archaeological discovery in the development of chinese porcelain

    一九九五和一九九九年,考古學家區家發先生在碗遺址進行了兩次考古調查,結果發現,遺址保存了生產陶瓷從到入裝燒各項工序整遺跡,包括坑、洞、水碓作坊、碾磨作坊、淘洗池、制坯作坊和等,這在中國陶瓷考古史上是十分罕見,是香港重要文化遺產。
  2. Develop as the development of socialist market economy, the buildup of idea of people goods economy, the person with thin idea of a few legal system, below the drive of economic interest, illegal building takes up the road is produced or waste material of rubbish of operation of stone of blast of market trade, cut into a mountain, mining, dump and building is formed to be banned repeatedly inside formulary control division more than ; use illegally, embezzlement, pollution, destroy, destroy highway the road is produced and trade of strike of facilities of larcenous highway transportation, machines and tools, equipment, raw material, steel is cultivated and the random on highway check that set a station, chaos collects fees, random amerce, highway is shown street change spread ; exceed restricted transport to be defeated the in good condition, safety that waits for minatory highway, expedite the development with highway career, of benefit of the economic benefits of highway, society and level of road network service rise, more and more rely on what road politics government works to strengthen

    隨著社會主義市場經濟深入發展,人們商品經濟觀念增強,一些法制觀念淡薄人,在經濟利益驅動下,非法建築物佔用路產或在規定控制區內形成集市貿易、開山炸石、作業、傾倒垃圾和建築廢料屢禁不止;非法利用、侵佔、污染、毀壞、破壞公路路產和盜竊公路交通設施、機具、設備、原材料、盜伐行道樹以及在公路上亂設站卡、亂收費、亂罰款,公路呈街道化蔓延;超限運輸等威脅著公路好、安全、暢通和公路事業發展,公路經濟效益、社會效益和路網服務水平提高,越來越依靠于路政治理工作加強。
  3. This paper probes into mining mode of metalliferous deposit based on the viewpoint of industrial ecology, in the hope of improving resources efficiency, eliminating the four big hazard sources which can bring negative environment impact due to mining of metalliferous deposit, avoiding " end - treatment " engineering needed when mine are closed, keeping integrated mine ' s ecosystem in the process of mining metalliferous deposit

    探討了基於工業生態學觀點金屬床開模式,以期提高資源效率,消除床開對環境造成負面影響4大危害源,消除山閉坑后末端治理工程,使山在生產過程中保持整生態體系。
  4. Self - contained forecast model of mining subsidence

    山開沉陷備預計模型
  5. Through opencut mining of cihai hidden iron ore deposit in recent years, it is found that there are multiperiodic diabase walls penetrated the steeply north - inclining iron ore bodies in different directions in early postmineral period so as to destroy the integrity of the iron ore bodies and divide them into many small south - inclining bodies

    通過對該隱伏露天挖掘開,發現鐵床在成后,早期有多期次輝綠巖墻以不同方向穿插於向北陡傾之鐵體中,從而使鐵整性受到破壞,肢解成眾多向南傾小體。
  6. An example indicates that the updated map, taking on the same data structure with original terrain map and the precision being satisfied with demands of terrain map, can be applied to land planning and mgis used as basic datum

    實例應用表明,更新后圖形數據結構與原地形圖全相同,其精度滿足大比例尺地形圖要求,可作為開沉陷區土地規劃和建立區地理信息系統基礎圖件。
  7. An improvement on the mining method of conveys ore by blasting force

    爆力運改進與
  8. We propose the concept of digital tenor model ( dtm ) for the first time, and applied it in practice to solve some problems of deposit. on the base of basic geologic reference of the deposit, we designed many digital tenor models of different ore - bodies, prospecting lines and profiles

    通過對區基礎地質資料和山開實踐資料二次開發,成了區不同體、不同勘探線、不同斷面銅三維數字品位模型設計。
  9. Xingda stone has several mining rights of mining, 10 of thousands of piling squares for stones and advanced processing facilities, which can guarantee the complete service for consumers

    星達石業擁有數座權,萬余平米荒料堆場和先進石材加工設備,保證為客戶提供服務。
  10. This paper takes rock mass structural plane that influences the stability of rock mass construction as the main subject of investigation and the underground mining in chengchao iron mine as an illustrating example. for a systematic study of the mechanical features of rock mass structural plane and of measures to control the rock mass structural plane, the methods of theoretical analysis, field survey, computer simulation, numerical calculation and engineering practice are employed jointly, aided by the integration of macro - study with micro - study, qualitative approach with quantitative one and theory with practice. the principle of combining rock mechanical theories with engineering practice is followed from beginning to end, which makes it possible to apply theoretical results to engineering practice, perfect the research method in raising the structural stability of underground construction and solve problems with production in enterprises

    本論文以影響巖體工程穩定性巖體結構面為主要研究對象,以程潮鐵地下為例,採用理論分析、現場調查、計算機模擬、數值計算和工程實踐等多種研究方法,將宏觀與微觀、定性與定量、理論與實踐相結合,系統地研究巖體結構面力學特徵,研究控制巖體結構面方法、手段和措施,旨在將巖石力學理論與工程緊密結合,使理論成果能夠在工程實踐中得到應用,不斷善提高地下工程結構穩定性研究方法,解決企業生產難題。
分享友人