采礦場充填 的英文怎麼說

中文拼音 [cǎikuàngchǎngchōngtián]
采礦場充填 英文
stope filling
  • : 采名詞(采地) feudal estate
  • : 名詞1. (礦床) ore [mineral] deposit 2. (礦石) ore 3. (開采礦物的場所) mine
  • : 場Ⅰ名詞1 (平坦的空地 多用來翻曬糧食 碾軋穀物) a level open space; threshing ground 2 [方言] (...
  • : Ⅰ形容詞(滿; 充足) sufficient; full; ample Ⅱ動詞1 (裝滿; 塞住) fill; charge; stuff 2 (擔任; ...
  • : 動詞1. (墊平或塞滿) fill; stuff 2. (補足; 充滿) replenish; supplement; complement 3. (填寫) fill in; write
  • 礦場 : mine
  1. Working conditions and productive capacities of both drill carrier and carry - scraper used during mechanical cut and fill stopping activities in xinqiao mining cooperation ltd. are evaluated by field testing and theoretical analysis in this paper

    摘要以新橋業有限責任公司大型機械化上向水平分層法中使用的鑿巖臺車和鏟運機為研究對象,通過現測定和理論分析相結合,評價了無軌設備的應用狀況和生產能力。
  2. With the mining of no. 1 ore body which is solwly inclined, large and thick at the west flank of xinqiao pyrite mine as the example, analytic comparision is made between flat - back cut and fill stoping and sublevel open stoping with one - time delayed filling. the suggestion on the optimization of the mining and the discussion on appropraite mining method and the technical parameters of mining technology for slowly inclined large and thick ore body are also made

    以新橋硫鐵體西翼緩傾斜厚大體的開為實例,對生產中應用的水平分層法和分段空嗣後一次法進行分析比較,提出方法的優化建議,探討緩傾斜厚大體合適的方法和工藝技術參數。
  3. Advance in chinas underground mining methods is reviewed, caving mining, open - stope mining and stoping - filling mining that reflect chinas underground mining technological level are summed up and the developmental trend of chinas underground mining methods is forcasted

    回顧了建國50年來我國地下方法的進展,概括總結了體現我國地下技術水平的崩落法、空法和法,展望了我國地下方法的發展趨勢。
  4. Study on the comprehensive technology of presupporting of roof and walls in tailings back - fill mining

    尾砂預控頂護幫綜合技術研究
  5. Rock mechanics analysis of structural parameters of stope using back - filling method

    階段空嗣後結構參數的巖石力學分析
  6. Application of the method of sublevel open stope mining followed by filling at xinqao pyrite mine

    分段空嗣後一次法在新橋硫鐵的應用
  7. A tentative plan for the improvement of sublevel open stoping with subsequent backfilling at tongkeng tin mine

    改進銅坑錫分段空嗣後法的設想
分享友人