重新連線 的英文怎麼說
中文拼音 [zhòngxīnliánxiàn]
重新連線
英文
reconnect- 重 : 重Ⅰ名詞(重量; 分量) weight Ⅱ動詞(重視) lay [place put] stress on; place value upon; attach im...
- 新 : Ⅰ形容詞1 (剛出現的或剛經驗到的) new; fresh; novel; up to date 2 (沒有用過的) unused; new 3 (...
- 連 : Ⅰ動詞1 (連接) link; join; connect 2 (連累) involve (in trouble); implicate 3 [方言] (縫) ...
- 線 : 名詞1 (用絲、棉、金屬等製成的細長的東西) thread; string; wire 2 [數學] (一個點任意移動所構成的...
- 重新 : again; anew; afresh
- 連線 : cables
-
I rewired the iamp in your office
你辦公室里的臺燈就是我重新連的電線The short green bars show how the managed connection is now tied to the ejb for less time and can, consequently, be reused elsewhere
短的綠色線條顯示託管連接現在綁定到ejb上,以縮短時間並可以在別的地方重新使用。Electrical accessories for domestic and similar purposes. round non - wirable two - pole plugs, 2, 5 a - 250 volts, with cord, for the connection of class ii equipment for household and similar purposes
家用及類似電器附件.級設備連接用帶軟線2 . 5安250伏圓形不可重新接線的二極插頭Realignment and widening of a 500 - metre section of victoria road at the north of its junction with the link road leading to lower baguio villa into a single two - lane carriageway 7. 3 metres wide on the straight section and 7. 9 metres wide on bends
在與通往下碧瑤灣的連接路的交通處以北的一段500米長域多利道,進行重新定線及擴闊工程,使之成為一條雙線不分隔行車道,直的路段闊7 . 3米,彎角部分闊7 . 9米Realignment and widening of a 1. 4 - kilometre section of victoria road at the south of its junction with the link road leading to upper baguio villa, into a single two - lane carriageway 7. 3 metres wide on straight sections and 7. 9 metres wide on bends
在與通往上碧瑤灣的連接路的交通處以南的一段1 . 4公里長域多利道,進行重新定線及擴闊工程,使之成為一條雙線不分隔行車道,直的路段闊7 . 3米,彎角部分闊7 . 9米I don ' t have your problem from the beginning and i can sync with 2 other hp pda apart from m600
個連線同步有問題,自動斷線后,重新安裝后都不能再同步。有?人有同感?An algorithm to resolve the coupling effect problem is proposed during the cross point assignment ( cpa ) stage. in the algorithm, the priority queue concept and the rip - up and reroute strategy are combined to control crosstalk noise caused by interconnect coupling capacitance. first, the nets are arranged into different priority queues according to their weighted sum of their length and criticality. then, the cpa problem for one queue of nets is translated into a linear assignment problem. after the assignment of one queue of nets, a post - cpa checking routine is performed to check and rip up the net pairs which violate the crosstalk noise constraint and then push them into the next queue to be reassigned. the algorithm is tested by a set of bench mark examples, and the experimental results are promising
提出了一種在過點分配階段解決噪聲耦合效應問題的演算法.該演算法採用優先隊列同拆線重布策略相結合的方法,控制由互連線耦合電容引起的串擾噪聲.演算法中,首先按照線長和約束限制,將線網劃分到若干個優先隊列中.然後,將每個優先隊列的過點分配問題轉換為線性分配問題.在完成一個線網隊列的分配后,通過過點分配后處理過程檢查串擾約束滿足情況,對違反約束的線網對進行拆除,放入后續線網隊列進行重新分配.實驗數據表明,該演算法能夠取得好的效果Abstract : an algorithm to resolve the coupling effect problem is proposed during the cross point assignment ( cpa ) stage. in the algorithm, the priority queue concept and the rip - up and reroute strategy are combined to control crosstalk noise caused by interconnect coupling capacitance. first, the nets are arranged into different priority queues according to their weighted sum of their length and criticality. then, the cpa problem for one queue of nets is translated into a linear assignment problem. after the assignment of one queue of nets, a post - cpa checking routine is performed to check and rip up the net pairs which violate the crosstalk noise constraint and then push them into the next queue to be reassigned. the algorithm is tested by a set of bench mark examples, and the experimental results are promising
文摘:提出了一種在過點分配階段解決噪聲耦合效應問題的演算法.該演算法採用優先隊列同拆線重布策略相結合的方法,控制由互連線耦合電容引起的串擾噪聲.演算法中,首先按照線長和約束限制,將線網劃分到若干個優先隊列中.然後,將每個優先隊列的過點分配問題轉換為線性分配問題.在完成一個線網隊列的分配后,通過過點分配后處理過程檢查串擾約束滿足情況,對違反約束的線網對進行拆除,放入后續線網隊列進行重新分配.實驗數據表明,該演算法能夠取得好的效果When using the latter, you have the capability of working offline, creating and managing documents locally, and later synchronizing your updates to the server when you reconnect to the network
使用後者時,可以進行離線處理,在本地創建和管理文檔,以後重新連接網路時,可以將更新同步到服務器。Construction of a link bridge linking the re - aligned sassoon road and the access road to queen mary hospital
建造一條橋梁,把通往瑪麗醫院的通道與重新定線后的沙宣道連接起來Changing operations on the fly ? converting, say, a calculation of a matrix of numbers to a parallel - processing computation ? requires the relatively slow rewiring of connections between large blocks of transistors, not the individual elements ( gates ) that perform a processor ' s logic operations
若要以動態的方式改變操作(例如將數字矩陣的計算轉換為平行計算) ,得將大區塊電晶體間的連結緩慢地重新接線,而非直接改變處理器里執行邏輯運算的個別元件(邏輯閘) 。In any role - switching scenario, once the new principal database comes online, the client applications can recover quickly by reconnecting to the database
在任一種角色切換情況下,一旦新的主體數據庫在線,客戶端應用程序便會通過重新連接到數據庫來快速恢復。B realignment of sections of container port road south, hing wah street west, lai po road and lin cheung road northbound ; and
B將部份貨櫃碼頭南路,興華街西,荔寶路及連翔路進行重新定線工程及Widening and realignment of a 3. 7km long section of castle peak road between sham tseng and ka loon tsuen, tsuen wan to a dual two - lane carriageway with 3m wide footpath on both sides
把深井與嘉村之間一段3 . 7公里長雙線不分隔車道的青山公路擴闊和重新定線,由雙線不分隔車道改為雙程雙線分隔車道連兩旁3米闊行人路Widening and realignment of a 3. 7km long section of castle peak road between sham tseng and ka loon tsuen, tsuen wan to a dual two - lane carriageway with 3m wide footpath on both sides ; construction of five covered footbridges
1 .把深井與嘉村之間一段3 . 7公里長雙線不分隔車道的青山公路擴闊和重新定線,由雙線不分隔車道改為雙程雙線分隔車道連兩旁3米闊行人路This is a realigned 0. 7 - kilometre single two - lane carriageway linking the nam wai and ho chung areas to enhance the safety of motorists and the flow of traffic in the two areas ; it was substantially completed in july
:一條重新定線的700米長雙線不分隔車道,連接南圍和蠔涌區,以提高駕駛人士的安全並改善交通流量。Every day, miracles happen in our lives once we reconnect ourselves with god. all we have to do is just sit there and try to listen to what hes says
一旦我們和上帝重新連線,每天都會有奇跡發生,我們只要坐下來,靜靜聽?的指示就夠了,就這么簡單。But after the reconnection, we can go higher and higher, and then we can be clearer. we know the wisdom of god, and we can take care of things better when we come back down again
但是和上帝重新連線之後,我們可以到越來越高的境界去,看事情比以前更清楚,並了悟上帝的智慧。Widening and realignment of a 4. 6km long section of castle peak road between area 2 and sham tseng, tsuen wan to dual two - lane carriageway with 3m wide footpath on both sides ; construction of a 300 - metre long single lane flyover in ting kau and six covered footbridges
把荃灣第2區與深井之間一段4 . 6公里長的青山公路擴闊和重新定線,由雙線不分隔車道改為雙程雙線分隔車道連兩旁3米闊行人路Widening and realignment of a 4. 6km long section of castle peak road between area 2 and sham tseng, tsuen wan to a dual two - lane carriageway with 3m wide footpath on both sides ; construction of a 300 - metre long single lane flyover in ting kau and six covered footbridges
把荃灣第2區與深井之間一段4 . 6公里長的青山公路擴闊和重新定線,由雙線不分隔車道改為雙程雙線分隔車道連兩旁3米闊行人路分享友人