重迭積分 的英文怎麼說

中文拼音 [zhòngdiěfēn]
重迭積分 英文
overlaintegral
  • : 重Ⅰ名詞(重量; 分量) weight Ⅱ動詞(重視) lay [place put] stress on; place value upon; attach im...
  • : Ⅰ動詞(輪流; 替換) alternate; change Ⅱ副詞1 (屢次) repeatedly; again and again 2 (及) in tim...
  • : Ⅰ動詞(積累) amass; store up; accumulate Ⅱ形容詞(長時間積累下來的) long standing; long pending...
  • : 分Ⅰ名詞1. (成分) component 2. (職責和權利的限度) what is within one's duty or rights Ⅱ同 「份」Ⅲ動詞[書面語] (料想) judge
  • 積分 : 1. [數學] integral; integrate; integration 2. [體育] (積累的分數) accumulate points
  1. In the study of the lumber carrier, one of the very important problem is the in spot and ultimate station due to flooding which will bring tremendous threat to the ship because of the few holds in order to study the lumber carrier buoyancy, stability and longitudinal strength under the condition of flooding, the paper adopt fundamental ship principle and iterative and accumulative concept on the basis of insumersibility theory to detailedly calculate the flooding speed flooding amount front draft after draft stability and longitudinal strength considering the ship " s sinking and inclination which will change the center of gravity and the loading station both in hold and on deck and the effect of flooding and lumber amount in holdo in the last, the paper introduces an example of the actual ship named " fei yun ling " and makes a contrast between not taking measure and taking measure which draws a reasonable conclusion and comes up to some advice the method avoids the cockamamie calculating while insures enough precision the paper draws a conclusion that not all the lumber carrier will submerge when suffering the damaged flooding if the loading or measure is suitable

    為了研究運木船舶在破艙狀態下的浮性、穩性和強度,本文在抗沉性理論的基礎上,運用船舶基本原理,採用了代和累計的思想,將船舶的進水過程劃為很多次進水的累,詳細計算了運木船在破艙進水的過程中,考慮到各種破艙參數、船舶本身的下沉、艙室內木材、甲板貨的裝載情況和在進水過程中船舶本身的傾斜對進水心的影響,以及艙室內的進水量和木材對破口處進水速度的影響,船舶總的進水速度、進水量、首尾吃水、穩性的實時狀態和最終船舶的總縱強度,給出了計算實例,並進行了在採取用泵抽水前後浮態參數的對比,得出了該船舶在艙室內的貨物載量達到某個數值時可以保證船舶在破艙進水時不會沉沒,或者在當開口小於某數值時,採取適當的措施后,可以使船舶避免沉沒。
  2. Secondly, to analyze seismic response of the concrete gravity dam, subspace iterative method was applied to compute free vibration period of the dam, time integration method was built up for the seismic time history analysis and formulation of coupled vibration of reservoir water and dam were also deduced

    其次,針對混凝土力壩的地震響應析問題,採用子空間代法計算了大壩的自振周期,建立了地震時程析的逐步方法,並且推導了庫水和壩體耦合振動的理論公式。
  3. A new system of nonlinear equations can be formed from the variation gray of same point in multiple images and the optimum solution of the system can be obtained, so that the normal vector at that point of the surface can be defined. then we can get the surface height at the point by applying composite numerical integration. according to variational calculus and finite difference method, the fitted surface is further iterated and modified, so the reconstruction error can be reduced

    根據多幅圖像上固定位置一點灰度值的變化列多個非線性方程,通過求解該非線性方程組,確定出各選取點的法向量;然後通過復化確定選取點的高度值,並利用變和有限差思想對所得表面進行進一步的代和修正,以減小構誤差。
分享友人