重量負荷 的英文怎麼說

中文拼音 [zhòngliáng]
重量負荷 英文
weight-bearing
  • : 重Ⅰ名詞(重量; 分量) weight Ⅱ動詞(重視) lay [place put] stress on; place value upon; attach im...
  • : 量動1. (度量) measure 2. (估量) estimate; size up
  • : Ⅰ名詞1 (負擔) burden; load 2 (虧損) loss 3 (失敗) defeat Ⅱ動詞1 [書面語] (背) carry on th...
  • : 荷名詞(蓮) lotus
  • 重量 : weight; scale; heft
  • 負荷 : [電學] load; charge; weight
  1. Accurate load forecasting is helpful to planning generators " starting and stopping in the interior of the electrical networks economically and reasonably, preserving the security and stability of power system, reducing the unnecessary circumvolving repertory capacity, making planning to overhaul the units in reason, ensuring the normal production and life of the society, effectively reducing the cost of generating electricity, increasing the economical and social benefit

    電力預測是供電部門的要工作之一,準確的預測,可以經濟合理地安排電網內部發電機的啟停,保持電網運行的安全穩定性,減少不必要的旋轉儲備容,合理安排機組檢修計劃,保證社會的正常生產和生活,有效地降低發電成本,提高經濟效益和社會效益。
  2. The overburdened heart may be carrying an extra pressure or volume load.

    的心臟,可能承擔額外的壓力或容
  3. And a solve scheme is presented, controlling the voltage of 220kv power network in chongqing under 232kv during low load period. with the increase of load and power supply, the reasonable positions and capacitance of reactive power compensation become reasonless

    隨著的不斷增加,電源亦隨之大幅度增加,使得原網路中本來合理的補償位置、補償容變得不合理,因此有必要新選擇補償點。
  4. In consideration of multitype risk in the operation of insurance companies, this paper studies some important variables in insurance business and then comes to the conclusion that the surplus process is related to safe load and individual claim amount distribution when the preliminary reserve is zero while the surplus process is related to adjustment coefficient when the preliminary reserve is beyond zero

    摘要考慮到保險公司同時經營多種不同質風險的情況,本文從保險業務中需要研究的幾個要變出發,研究了初始準備金為零時,盈餘過程與安全及個體索賠額分佈有關;當初始準備金大於零時,盈餘過程與調節系數相關等情形。
  5. This article aims at the boiler ' s problems in operation : 1 ) under nominal load, the smoke temperature at the outlet of hearth reaches 1200, far more exceeds 1050 the original designed temperature. this will always result in slag inside boiler and the temperature of overheater ' s pipe superheat, so that boiler cannot take nominal load and all these influence boiler ' s nomal operation heavily, 2 ) this article also studied the reason why the assistant oil becoming necessary when coal changes. during the nomal operation, many factors ( makeup of combustor and its disposal, smirch and encrust of water wall, excessive air coefficient, temperature of primary air, coal type and density of coal dust ) can deviate the designed working conditions, then affect the boiler ' s nomal operation

    本文針對該鍋爐在實際運行中存在的問題:在額定下,爐膛出口超溫、低溫段過熱器前煙溫高達936 ,遠遠超過815的設計值;噴燃器四周水冷壁結焦嚴,過熱器管壁溫度超標,無法帶上額定;甚至有時因燃煤質的變化,必須投油助燃的嚴情況進行了分析研究。在實際生產過程中,燃燒器的結構、布置,水冷壁的粘污、結垢,過剩空氣系數、一次風溫、煤種及其濃度變化等許多因素都會偏離鍋爐的設計工況,從而影響爐內的傳熱和燃燒,造成爐膛出口超溫、水冷壁結渣等問題。
  6. The vascular bundle has a similar spikelet number load and sink load in the hphr and shanyou 63

    穗型組合的維管束穎花、總庫容均與汕優63相當。
  7. Heart failure gratified the function is not complete, it is to show the case that has circumfluence of blood of right amount vein falls, because the heart is long - term bear is overweight or heart myapathies caustic makes force of cardiac muscle systole drops, heart cannot enough blood satisfies eduction constituent metabolization need so that all round constituent perfusion inadequacy and pulmonary circulation or blood of systematic circulation yu, a series of clinical symptoms that appear thereby and body are asked for, say for heart failure

    心力衰竭又稱心功能不全,是指有適靜脈血迴流的情況下,由於心臟長期或心肌病損使心肌收縮力下降,心臟不能排出足夠血液滿足組織代謝需要以至於四周組織灌注不足和肺循環或體循環瘀血,從而出現的一系列臨床癥狀和體征,稱之為心力衰竭。
  8. The problem was a familiar one : most of the sewage disposal facilities in the beach hinterlands had been built in the 1970s and designed to serve a relatively small population. with the rapid growth of the 1980s, pressure on the facilities increased to breaking point

    水質欠佳的主要原因是當時泳灘腹地的污水處理設施均建於1970年代,原本設計只可供少數人口使用,至1980年代人口急劇上升,令污水設施大增,沉的壓力幾乎導致系統崩潰。
  9. With the speed - raising of railway and the marketing of the management, the load that the electric locomotive burdens increased annually. in order to guarantee the security of the locomotive, the overhaul must be transited from preventive maintenance to state maintenance, which can accelerate the speed and the quality of the locomotive overhaul and reduce the overhaul cost. the most important achievement is that the overhaul can be performed automatically and digitally and can be effectively competent for the record management of the overhaul data

    隨著鐵路提速和運營生產的市場化,機車運行逐年增加,為了有效保證機車的運行安全,機車檢修必須從定期維修向狀態維修轉變,以提高機車檢修的速度和質,降低機車檢修成本,更要實現檢修自動化、數字化,完成對機車檢修數據進行有效的記錄管理,建立機車關鍵設備的狀態參數數據庫,從而實現對機車狀態有效控制。
  10. In chapter 3, the subgrid eddy - viscosity model for large eddy simulation is applied to calculate the three dimensions unsteady periodic turbulent flow in yantan francis turbine. the pulsating characteristics of some main physical parameters in flow field are found. the calculated axial water thrust of hydraulic turbine agrees with the model - test value

    第三章採用大渦模擬亞格子渦粘模型,對巖灘混流式水輪機的流場進行三維非定常湍流分析,得到了流場中各物理的脈動特性,計算出ms的軸向水推力與模型試驗值大小相當;同時論證了對于下機架承的混流式水輪發電機組可採用其推力軸承作為水電站廠房振動的最大垂直激振載。
  11. The overhaul of power units are arranged in terms of peaking capacity balance and the power loads are dispatched based on the principle of equal incremental coal consumption rate in the new method, which is anticipated to solve the economic operation of the power system

    實際上,抽水蓄能電站的容效益與電網的水平、曲線形狀和常規水電的比有關,而節煤效益除與水平、曲線形狀有關外,還與電網的電源結構、火電機組的動力特性有關。
  12. The load on the platform must not exceed the indicated capacity

    平臺的不能超過所指示的。 (不允許超。 )
  13. A load or burden that is too full or heavy

    超載過或過的載
  14. It includes : solving " excess attempt " and " defective attempt " of agc by load prediction in extraordinary shot time, that is preceding control technique ; ( 2 ) enhancing the regulating capacity and speed of agc of chongqing network by 5 measure ; analyzing the policymaking that chongqing network could achieve criterion now or after three gorges power station running, discussing the managing measure how to enhance regulating capability of agc of chongqing network

    其中包括:利用超短期預報解決agc 「過調」和「欠調」問題的超前控制技術;以5種實現方式提高慶電網agc可調和調節速度;探討了當前和在三峽電站投運后慶電網達到考核標準的對策,討論了從管理上提高慶電網agc調節性能的辦法和措施。
  15. With the recently demonstrated effectiveness of eccentric loading and of repetitive low - energy shock wave therapy in patients with midsubstance achilles tendinopathy, the aim of the present randomized, controlled trial was to verify the effectiveness of both procedures exclusively in patients with insertional achilles tendinopathy

    最近有研究表明偏心復低能沖擊波療法對跟腱中部病變的病人有效,本隨機對照研究的目的是為了證實這兩種手段對跟腱附著點病變病人的療效。
  16. Secondly, their aims are made the investment of substations, feeders or running cost of electric power system minimum. but they do n ' t take into account of land utilization, street accessibility of right of way, etc., but demands of electric power system. generally, a straight line distance, namely, euclid distance, was used for calculating the distance between a load point and a substation, which is a straight forward but non - practical way for most planning techniques

    其次受研究工具的限制,這些模型以工程投資、運行費用等最小為目標,僅能考慮導線載流、電壓降等電力系統技術約束條件,簡化略去了用地限制、街道可達性等要的自然約束條件,且求解這些模型的前奏是計算點到變電所的歐幾里得距離(直線距離) ,簡便但不切合實際(這一點在城市電網規劃中尤其要) ,因此較難給出技術上可行的最優解。
  17. With the development of modern industry, the nonlinear loads of power system are greatly increased. they absorb the non - sine current waves from power network and result in voltage aberrance. voltage aberrance makes the power quality severely deteriorate, endangers the safe and economical running of power system and affects some users ’ s normal work

    隨著現代工業的發展,電力系統中的非線性增加,這些非線性從電網吸收非正弦電流,導致電網電壓發生畸變,使電能質惡化,危及電力系統安全和經濟運行,影響了用戶的正常工作。
  18. The vast interior is thus wholly free of suggestion of ponderous load, and its effect is that of a weightless golden shell that seems to possess a miraculous inherent stability

    從而,整個遼闊的內部都沒有暗示出沉,它產生出的效果就是一個無的金黃色外殼,似乎是擁有一種不可思議的固有穩定性。
  19. Mass, as weighed value, force, weight force, weight, load ; concepts

    值力重量負荷.概念
  20. As the important load center of power system, the establishment and evaluation of distribution system ' s reliability index has his characteristics

    作為電力系統的中心,城市電網配電系統可靠性指標的建立及定評估有其自身的特點。
分享友人