量水壩 的英文怎麼說

中文拼音 [liángshuǐ]
量水壩 英文
measuring dam
  • : 量動1. (度量) measure 2. (估量) estimate; size up
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : 名詞1 (攔水建築物) dam2 (固堤建築物) dyke; embankment 3 [方言] (沙灘; 沙洲) sandbar; sandba...
  • 水壩 : dam; pen
  1. Graziers are accused of over - stocking and siphoning off water for their own use without paying for it, while cotton growers are accused of coveting an over - allocation from the upstream burrenjong dam

    放牧人被指責是牲畜飼養過,從濕地中引自用卻不支付任何費用;同時,棉花種植者也被指責一心只想從布瑞鐘上游裝置分引入裝置而導致的後果。
  2. A fracture dynamics analysis is given to an accident on a gudgeon link of the miter gate of a dam

    摘要對某船閘人字門拉桿斷裂事故進行斷裂動力學的定性與定分析。
  3. So as the enter point of the stream, the income of the reservoir, the time of the flood peak lasted, the quantity of sandiness income and the strobe of the darn. we must do some work to forecast and watch the different density stream. by experiments, we made out that it is impo rtant for us to reduce the water lever in work of the river belongs lots of sandiness

    從異重流試驗看,在正常運用下,庫產生泥沙異重流的機率較大,能否運動到前排出庫外,還要看異重流潛入點位置、入庫流、洪峰歷時、入庫含沙庫閘門運用等因素,需要做好異重流預報監測工作。
  4. Reservior - induced seimicity closely get in touch with the reservoir - region geological surrounding and engineering scale, is the important factor to measure the reservoir - safety and dam - stability

    庫誘發地震與庫區地質環境和庫工程規模有著密切的聯系,是衡庫安全及大穩定性的重要因素。
  5. Controlled by summersville dam, the gauley is filled when the sum - mersville reservoir is lowered for storing winter melt and spring rains providing about 20 days of whitewater rafting

    受夏日蓄控制,當蓄池為了儲存融雪和春雨而放時,高利河裡滿載,提供了20天左右的白漂流。
  6. Such mechanisms were soon built into dams to harness vast amounts of electricity.

    不久就把這種機器安裝在上,用來大發電。
  7. The mathematical model was applied to serve the engineering projects. the different water levels and flow discharges in nanjing river reach are calculated, bed scour and sedimentation in this engineering reach during one hydrologic year are verified. all results are in good agreement with field measurements

    西氣東輸過江工程,採用該模型模擬南京西泗源溝河段不同流流運動,並計算一文年過程該河段的河床沖淤變化,結果和實測資料也基本一致。
  8. As the largest hydroelectric plant in the world, its 26 turbines will generate enough electricity to power 28 cities of 1m people each

    三峽是當今世界最大的利發電站(計劃到2008年時,每年發電會達到8 , 470億千瓦) 。站內的26座渦輪可以給28座人口多達百萬的大城市供應充足的電力。
  9. Only 6 % of congolese have access to electricity and more power will be needed to get at the country ' s trove of minerals

    從理論上講,在剛果河流湍急的沿路建造多個的宏偉計劃將提供三萬九千兆瓦特的能,這些足夠為整個非洲大陸提供能
  10. In the bible, the book of revelations says, " i stand at the door and knock. if anyone will open the door, i will come in to him and i will eat with him. " revelations 3 : 20 we push the button and we allow the power and the force of jesus christ to come into our lives and go through our lives and empower us with his spirit and his goodness

    1972年, gamal abdel nassar總統為主持開幕禮,他走進去,按下按鈕,他一按按鈕,就開始流過渦輪機,渦輪機開始轉動,電力開始輸出,埃及蘇丹和鄰近地區都被照亮了,那按鈕並不能製造電力,它只是把能釋放出來,電力是由塘里二千億立方碼的製造的,流過,推到渦輪機造成電力,我們跟神的關系也一樣,我們邀請耶穌基督進入我們的人生,這就是按按鈕。
  11. Since dams can ‘ t be filled until the risk of flooding is past, the models predict they will trap just 70 to 85 per cent as much run - off as they do now

    由於蓄只有在洪泛濫的危險過去后才能蓄滿,模擬研究預計它們攔阻的能力只是目前平的70至85 。
  12. Traditional irrigation, however, has degraded the soil in many areas, and the reservoirs behind dams can quickly fill up with silt, reducing their storage capacity and depriving downstream farmers of fertile sediments

    然而傳統的灌溉法已對多處地區的土壤造成侵蝕現象,而攔截而形成的庫,也很快就有沙石淤積,除了降低庫的蓄,還使得下游農民喪失了肥沃的沉積土。
  13. ( 4 ) according to analysis of water resources characteristics of the dam system, following conclusions are obtained : amount of yearly available water resources of the dam system presents uncertainty ; water resources utilization by the dam system should focus on fully utilization of rainfall, runoff and flood ; meanwhile, water resources exploration of the dam system should reach the objective of maximum economic benefit in years ; a modeling system for water resources utilization and exploration by the dam system is established on the basis of reasonable investment and above objectives

    資源的特點進行了深入研究,得出以下結論:資源年可利用具有較大的隨機性;開發利用資源就是充分利用降雨和徑流洪資源開發應以多年經濟效益總體期望值最大為目標。同時引入了最佳資源投入的概念,並建立了資源開發利用模型。
  14. The plans included the establishment of dams, for the purpose of increasing the reservoir s capacity to 194 million gallons, the construction of pumping stations and the installation of pumping machines

    漆鹹的計劃草案較具體的工程內容包括了興建(使塘容增加至1 . 94億加侖) 、抽站及加設抽機,整體工程費用預算為78萬港元。
  15. Under legal agreements made during that time, the buendia dam is still obliged to relinquish enormous quantities of its precious water to quench the thirst of residents living in murcia in southern spain where the climate is even drier

    按照當時的法律協議,布溫迪亞要放出大極為寶貴的來解決生活在西班牙南部穆爾西亞的居民的缺問題,因為那裡的氣候更乾旱。
  16. Basing on the abundant statistic and testing data of xiluodu hydroelectric project, the spatial characters of rock mass structure and quality in dam foundation are detailed studied. some progress is made in the following aspects : quantification of rock mass structure indexes, quantized quality classification of dam foundation rock mass, establishment of spatial database of rock mass quality indices and the diagrammatic representation of rock mass quality

    本文結合溪洛渡電工程,以豐富的統計、測試資料為基礎,以巖體結構為主線,深入研究了基巖體結構、巖體質的空間變化特徵,在巖體結構分類指標定化、基巖體質化分級及巖體質指標空間數據庫的建立、巖體質圖形展示技術方面取得了一定的進展。
  17. The impacted stream should be restored to its original conditions, in particular its ecological functions, as far as possible. the illegal constructions, including the haul road and dam should be removed

    政府應把受影響的河道盡恢復原狀,特別是其生態功能,並把非法興建的運輸通道和拆卸。
  18. On the basis of fvm and unstructured grids, tvd ? muscl scheme is constructed with high performance. according to the discharge and water level of breach, the scheme is used to compute velocity and water level of center node of all elements

    在應用有限體積法無結構網格的基礎上建立了高性能的tvd ? muscl格式,根據堤潰口處的流位,計算出沿程下游各點的流速、位。
  19. The huge flood storage capacity will lessen the frequency of major floods

    三峽的大容可以減少災的頻率。
  20. Until now, governments and development agencies have tried to tackle the problem through large - scale projects : gigantic dams, sprawling irrigation canals and vast new fields of high - yield crops introduced during the green revolution, the famous campaign to increase grain harvests in developing nations

    直到目前為止,一些政府和開發機構處理這項問題的手段,都是採用大規模的工程計畫,像是巨型、綿延的灌溉溝渠,以及利用大型農田來種植綠色革命時期所引進的高產作物(綠色革命是為了使開發中國家的穀物收成增加而興起的著名運動) 。
分享友人