鉆一口井 的英文怎麼說

中文拼音 [zhēnkǒujǐng]
鉆一口井 英文
bung down
  • : 鉆Ⅰ名詞1. (打眼用的工具) drill; auger 2. (指鉆石) diamond; jewel Ⅱ動詞(用尖物在另一物體上轉動) drill; bore
  • : Ⅰ名詞1 (人或動物進飲食的器官; 嘴) mouth 2 (容器通外面的地方) mouth; rim 3 (出入通過的地方) ...
  • : Ⅰ名詞1 (從地面往下鑿成的能取水的深洞) well 2 (形狀像井的東西) sth in the shape of a well 3 (...
  1. When was the first offshore oil well drilled ?

    濱海油是什麼時候打的
  2. Indeed, after all the various attendant service needed to drill a well are summed up, there could be as many as a hundred service and supply companies working at the drill site at one time or another

    實際上,累計鉆一口井所需要的服務,在場地同時或不同時有百多家服務或供應公司工作。
  3. Then he heard that with his 2, 000 gift it would still take 20 people digging for ten days using a hand auger

    他知道付出了二千美元后,還需要二十人用螺絲十天才能打開
  4. Abstract : according to sidewall unstable problem during dr illing, the study on sidewall stability is developed. the paper analyses sidewall stress state and sidewall unstable type, and combines with log data and indoor e xperimental result of core. through analysis and calculation, the method of calcul ating slough formation pressure is proposed. by application of the method in 3 wells in yancheng area, result shows that slough pressure section fits in with field practical condition. it supplies some basis for design of drilling fluid d ensity

    文摘:針對壁失穩問題開展壁穩定性研究,文中就壁應力狀態和失穩類型進行分析計算,並結合測資料和巖心的室內實驗結果進行分析,建立了套計算地層坍塌壓力的方法,結合鹽城地區3應用對比,坍塌壓力剖面基本吻合現場實際,為液密度設計提供了定的依據。
  5. In the early stage of its exploration and exploitation ( 1905 - 1949 ), five major events occurred in the order of time, namely : ( 1 ) the foundation of yanchang oil plant and the first oil well in mainland china ; ( 2 ) the voice of the oil field run by the local people ; ( 3 ) the drilling and investigation of petroleum geology in northern shaanxi by mobil corporation ; ( 4 ) the early investigation of petroleum geology in northern shaanxi ; and ( 5 ) the strong support given by the oil field to the war of resistance against japan

    在延長油礦早期( 1905 - 1949年)勘探與開采中,有5件重大事件,即:從延長石油官廠的成立與中國近代陸上第、民辦油礦的呼聲、美孚對陜北的探與石油地質調查、中國人進行的早期陜北石油地質調查和有力地支援抗日戰爭的功臣油礦。
  6. The heavy drilling apparatus was blown sky high out of the hole with a tremendous roar.

    那沉重的設備隨著聲驚人的怒吼,脫離,飛向高空。
  7. According to the two companies the studies carried out as part of a joint prospecting project which began three years ago led to the decision to drill a new well in the exploration area which covers a total 29 000 square meters

    聯合石油勘探計劃在三年前就開始了,勘探地區面積達29000平方米。兩公司稱,作為該計劃的部分,他們將在勘探地區新油
  8. At last, we provide six exploring wells. among the drilled three wells, the two gain the industrial oil & gas and another is not good. as follows are the main studies

    最終提供設計位6,其中有3已經完,兩在奧陶系潛山見到工業油氣流,有油氣顯示。
  9. The hamworthy super trident sewage treatment unit is a self contained system for the treatment of sewage from ships or rigs before it is discharged overboard and so prevent the pollution of harbour and coastal waters and inland waterways

    大概意思我知道,就是個船或上的個污水處理單元,在污水排放前的獨立控制系統,防止港和沿海水域和國內航道的污染。
  10. Based on the above methodological analyses and practical situation of feixianguan interval in the luojiazhai and dukouhe structure on the east of sichuan, a set of well log interpretation formation pressure application program is developed. it has been successfully applied to the fine interpretation of luojia4 well and du4 well, and so on. the results of formation pore pressure, fracture pressure and breakout pressure are all accordant with the practical situation

    在上述方法理論研究的基礎上,結合川東羅家寨和渡河構造飛仙關組地層的實際情況,編制了套適合於該研究工區的地層壓力測解釋應用程序,並用於羅家4和渡4的測資料精細處理中,所計算的地層孔隙壓力、坍塌壓力和破裂壓力與實測資料相符,且所確定的泥漿密度窗得到了實際生產的驗證,達到了預期效果。
  11. Dockyards ( shekou ) limited, one of the top10 ship - repairing yards in china, is professionally for ship repair, offshore repair and conversion and ocean engineering works

    聯船廠(蛇)有限公司成立於1989年,是招商局工業集團的全資子公司之,主營各類遠洋船舶、平臺的修理和改造以及海洋鋼結構工程。
  12. An onshore waterflood, on the other hand, generally involves the drilling of several injection wells and the conversion of several existing wells onto injection wells

    方面,陸上注水方案通常要牽涉到注水和轉換幾已經存在的為注水
  13. According to the problems occurred during the first stage of five well drillings in qianmiqiao qianshan structure, technical measures, such as optimal well configuration, bottom hole assembly, bit type and drilling fluid were taken during the second stage of another five deep drillings and better results were achieved. it is helpful to explore and develop in qianmiqiao qianshan structure in dagang oilfield

    分析了千米橋潛山構造第階段5施工過程中遇到的技術難題,從優化身結構、優選具組合、頭優選、優選液體系及組織管理等方面給出了相應的技術措施和對策,並在第二階段5的施工中進行了應用,且取得了明顯的效果,為大港油田千米橋潛山構造的勘探開發奠定了堅實的基礎。
  14. Abstract : according to the problems occurred during the first stage of five well drillings in qianmiqiao qianshan structure, technical measures, such as optimal well configuration, bottom hole assembly, bit type and drilling fluid were taken during the second stage of another five deep drillings and better results were achieved. it is helpful to explore and develop in qianmiqiao qianshan structure in dagang oilfield

    文摘:分析了千米橋潛山構造第階段5施工過程中遇到的技術難題,從優化身結構、優選具組合、頭優選、優選液體系及組織管理等方面給出了相應的技術措施和對策,並在第二階段5的施工中進行了應用,且取得了明顯的效果,為大港油田千米橋潛山構造的勘探開發奠定了堅實的基礎。
  15. Officials say they will not drill a three - foot - wide hole into the mine to low a rescue capsule

    官方聲稱:礦內無法個寬度三英尺、可以放置營救倉的洞
分享友人