鉆井架 的英文怎麼說

中文拼音 [zhēnjǐngjià]
鉆井架 英文
boring tower
  • : 鉆Ⅰ名詞1. (打眼用的工具) drill; auger 2. (指鉆石) diamond; jewel Ⅱ動詞(用尖物在另一物體上轉動) drill; bore
  • : Ⅰ名詞1 (從地面往下鑿成的能取水的深洞) well 2 (形狀像井的東西) sth in the shape of a well 3 (...
  • : Ⅰ名詞1 (用來放置東西或支撐物體等的東西; 架子) frame; rack; shelf; stand 2 (毆打; 爭吵) fight;...
  1. When it has been decided where we are going to drill, we put up at the surface an oil derrick.

    決定了孔位置后,我們就在地面上豎起
  2. Design rig ' s mast structure & rig ' s substructure

    機的,珩及底座結構件的設計。
  3. With the proposed method, the optimal design of crane booms made of high strength alloy tubes used for drilling platform is carried out in order to obtain the lightest crane booms

    對採用高強度鋼管研製的某海洋平臺起重機臂進行優化設計,獲得了最輕自重起重機臂的最佳設計方案。
  4. Linnan sub - depression which is mesozoic and cenozoic faulted lacustrine basin is located in the southwestern part of huimin sag, depression of jiyang. it is dominated by lacustrine - fill sub - depression. based on well logs, three - dimension seismic profiles, cores and other basic data, 10 horizons including 6 turnaround surfaces and 4 maximum flooding surfaces are defined from es3 to the lower part of es2 formation, and 1 long - term and 5 intermediate - term base - level cycles which are named from c5 to c1 could be identified, and then the chronostratigraphic framework of the sub - depression is built

    本文以巖心、、測、地震資料為基礎,在下第三系沙三段沙二下的一個長期基準面旋迴(二級層序)內部識別出10個有時間地層對比意義的界面,包括6個基準面下降到上升的轉換面(層序界面) , 4個基準面上升到下降的轉換面(湖泛面) ,劃分出c1 - c5五個中期基準面旋迴,建立了等時地層格地層格
  5. Kilometres behind stood the new international airport, lights ablaze like a north sea oil rig, stainless - steel ribs and glass flanks reaching upwards, length extending into the middle distance, its gleaming hallways all but devoid of people

    數公裡外座落著新國際機場,燈火通明好似北海上的石油平臺,不銹鋼骨和玻璃側翼直伸上天,流光溢彩的大廳中人頭攢動。
  6. A fountain of oil gushed up through the floor and high over the top of the derrick into the darkness.

    油噴湧上來了,穿過臺,超過,噴入夜空。
  7. Mine electrical : integrated automation intelligent switch controller ; mine explosion - proof type intelligent combine switch ; mine power center ; mine vvvf devices ; automation system : mine hoist automation system ; coal preparation plant automation system ; drilling machine control system ; lines of motor vehicles and power leakage protection devices, etc

    礦用電器:綜合自動化智能開關控制器;礦用隔爆智能組合開關;礦用動力中心;礦用變頻調速裝置等;自動化系統:礦提升機自動化系統;選煤廠自動化系統;機自動控制系統;線電機車電源及其漏電保護裝置等。
  8. Many classes in fem and the relevant member functions are also defined. derrick is an important structure of petroleum drilling machinery, and its carrying capacity is very important for the implement of drilling process

    在程序中,給出了各個有限元類的定義以及實現函數;是石油機械的重要組成部分,其安全承載能力對工藝的實現起著舉足輕重的作用。
  9. Sequence stratigraphy can contribute directly to the exploration of subtle traps. it is effective to increase the precision of stratigraphic correlation, therefor to enhance the reliability of subtle traps prediction, stratigraphic correlation approaches using in this paper based on principle of stratigraphic base - level cycles developed by t. a. cross, which are well tested in shallow marine and coastal plain strata. utilizing core, drilling, logging, seismic data and other information, the paper focus on recognizing the stratigraphic cycles formed by multi - order base - level cycles, establishing the stratigraphic correlation framework, researching on the distribution of reservoir and the prediction of the prospecting targets of the fourth section of shahejie formation in qi - shu area, liaohe basin

    本文以t . a . cross成因地層研究小組提出的以地層基準面旋迴原理為理論基礎進行成因地層分析和儲層預測的高解析度層序地層學為指導,利用、地震、巖心等多種分析資料,對遼河盆地西斜坡中部齊?曙地區沙四段地層進行了層序地層綜合研究,建立了研究區高解析度等時地層格,在等時格內對本區沙四段進行了沉積體系特徵及其展布規律的研究,在綜合分析成藏要素的基礎上對沙四段有利目標區進行了預測。
  10. The method of measuring and evaluating of the loading capacity on rig derricks

    石油機用承載能力檢測評定方法
  11. Specification for grading appraisal of petroleum drilling derricks

    石油分級評定規范
  12. On the basis of sedimentary facies division, the author firstly divided super short - term and short - time base - level cycle on well drilling cores, and playback the cores to well logging curves to scale them, and set up different classes of base - level cycles answered to well logging respond models. finally the author discussed how to use log well curve to divide super short - term and short - time base - level cycle characters, and to set up super short - term and short - term base - level cycle comparison framework, and analyzed sand body origin cause of formation type and spreading rules

    在深入的沉積相研究基礎上,對巖芯進行了超短期?短期基準面旋迴劃分,將巖芯歸位,並對測曲線進行刻度,建立了不同級次基準面旋迴的測響應模型,進而應用測曲線劃分低級次基準面旋迴,建立了超短?短期基準面旋迴地層格,探討了砂體成因類型及展布規律。
  13. Based on well logs, three - dimension seismic profiles, cores and other basic data, author recognized the sequence horizons of high - scale by the changes of a / s ratio, and established high - resolution chronostratigraphic framework using multi - term base - level cycles of high - resolution sequence stratigraphy, combining sequence theory with sedimentology. the depositional system characters and distribution were outlined and the prospective areas for stratigraphic traps were defined : jishan and jiangjiadian

    本文是以、地震資料、巖心和各種分析化驗資料為基礎,以多級次基準面旋迴為參照面的高解析度層序地層學理論與研究方法將層序地層分析技術與沉積學原理緊密結合起來,運用a / s比值的變化趨勢可以識別高級次層序界面,建立高解析度層序地層對比格
  14. Analyzed with the developed software, the stress and deformation distributions of f320 derrick and j250 / 42 - k derrick under several working conditions are obtained. the results obtained here are consistent with tha t obtained with supersap93, which illustrates the program is correct and practicable. finally a fem pre - processor and post processor is developed

    本論文用編制的程序分析了f320型和jj250 / 42 - k型石油在幾種工況下的應力、變形分佈,及兩種的固有模態、屈曲模態和可靠性,所得結果與supersap93的計算結果比較,應力和位移誤差均相差很小,說明本程序系統是正確可行的。
  15. On the basis of analyzing the rock mechanics, the bit working circumstance and property in the bottom hole of 6000m deep well, and making use of the former equipment such as a derrick, platforms etc, the paper demonstrates that the research and design of the mechanical device have been established including the high pressure simulating well bore, the high pressure connector between the static well bore and the rotating drill pipe, the high pressure simulating system of circulating fluid and the high pressure desander etc. the produce, control and dynamic analysis of the bottom hole four - dimensional pressure ( over burden, confined, pore and column pressure ) have been studied

    本文在對底巖石的受力狀態以及頭的工作環境和特性加以分析的基礎上,藉助原有的、平臺等設備,研究設計了模擬6000米底壓力壞境的高壓模擬筒、柱高壓轉聯器、液高壓模擬系統以及高壓除砂器等機械裝置,並研究了底四維模擬壓力(上覆壓、圍壓、孔隙壓和液柱壓)的產生、控制及其控制的建模與模擬,從而實現深至6000米的四維底壓力環境的模擬。
  16. Specification for drilling and well servicing structures

    和修底座規范
  17. Bob - tail rig

    安裝緊湊的
  18. As the report points out, many of them rely on water freelancers ? laying pipes, drilling wells, or trucking water ? who sell water to people unserved by public utilities

    報告指出,大多數窮人依賴做水生意的人,他們給沒有公共供水的用戶服務,象自己管子、、或用卡車運水。
  19. The target stratigraphy is sha - 2 formation and sha - 3 formation and the study task of the thesis is to make high frequency stratigraphic classification, and to build spatio - temporal stratigraphic framework, as a result, spatial distributing and evolvement process of the sediment formation could be recover, and favorable oil and gas trap could be predicted with the help of the data analysis such as seismic section, well logs and core

    研究目的和任務是對該區目的層段進行高解析度層序地層劃分,建立起時間和空間的地層格,以層序為單位,準層序組或體系域為對象,充分結合地震、以及巖芯資料,恢復地下地層的空間展布以及地層的演化過程,從而進行有利含油氣區帶預測。
  20. When it has been decided where we are going to drill, we put up at the surface of an oil derrick.

    當決定要在哪裡孔時,我們在那塊地面上豎起一個
分享友人