鉆前工程 的英文怎麼說

中文拼音 [zhēnqiángōngchéng]
鉆前工程 英文
prespud operation
  • : 鉆Ⅰ名詞1. (打眼用的工具) drill; auger 2. (指鉆石) diamond; jewel Ⅱ動詞(用尖物在另一物體上轉動) drill; bore
  • : Ⅰ名詞1 (在正面的) front 2 (次序在先的) first; top 3 (過去的; 較早的) ago; before; preceding...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : 名詞1 (規章; 法式) rule; regulation 2 (進度; 程序) order; procedure 3 (路途; 一段路) journe...
  1. This subject belongs to three - dimensional layout problems with behavioral constraints theoretically and concerns the knowledge of spacecraft design, mechanical engineering, computer science, mathematics, mechanics and system engineering. so it can be ascribed as the frontier fundamental and applied research of cross - discipline subject with np complexity theoretically. in term of engineering practice, this subject has extensive applications, such as layout design of spacecraft module, engineering machinery, submarine and shipping, tank, under - water suspension engineering, platform of marine drilling well, bullet train, multiple spindle box of machine tool, robot

    該課題在理論上,屬帶性能約束的三維布局問題,涉及航天器設計、機械、計算機、數學、力學和系統等學科,為交叉學科沿課題的基礎理論和應用基礎研究,具有np難度;在實踐上,具有廣泛的應用背景,如航天器艙、機械、潛艇、船舶、坦克、水下懸浮、海上井平臺、高速列車、組合機床多軸箱、機器人等的布局方案設計問題。
  2. The distance of the single - row curtain grout hole is between 1. 4 to 1. 8 meter, and 2. 0 meter is suitable for the double - row curtain ; the grouting pressure generally is 1. 0 to 1. 5 mpa at the first three grout compartment, then grouting pressure of under the fourth control in 4 to 5 mpa ; for mast grout compartments, a water - cement ratio of 2 or 1 may used in the first grouting

    孔密度也由原來的0 . slm / mz降至o . 64n擴mz ,節約投資447 . 35萬元。 6 、單排帷幕的孔距在1 . 4一1 . 8m之間,雙排帷幕的孔距以zm為宜;灌漿壓力在地表以下三段一般為1一1 . smpa ,第四段以下按4一smpa控制;對大部分孔段而言,開灌水灰比可定為2或1 。
  3. He was appointed to be the tool - pusher of our crew 2 year ago

    他是這個井隊的隊長,名叫李國華,七個從西南石油學院畢業,專修
  4. The engineering drilling machine of kp2200 type is double layers bottom plate, and drives through hydraulic pressure, upper plate can move fore and aft on the lower plate, the drill power leans back under the action of oil cylinder, the lower plate can put the drilling tool within 2. 5 meters into well hole without moving, it is convenient and reliable, and ensures construction quality

    Kp2200型機為雙層底盤,通過液壓驅動,上盤可在下盤上後移動,塔在油缸的作用下後仰,下盤不動即可把2 . 2米以內的具放入井孔內,方便可靠,保證施質量。
  5. This paper aim at guiding drilling basic theoretical research lag behind on reality that project practice at present, on the basis of analysing the technology and principle and researching current situation in detail, through a series of calculation draw the comparatively rational formula of guiding drilling ' s the most important parameter - pull

    本文針對當非開挖導向進基礎理論研究滯後於實踐的現實,在詳細分析藝原理和研究現狀的基礎上,通過一系列計算,得出較為合理的導向進最重要的參數? ?回拖力的計算公式。
  6. Today, cast - in - situ piles are more widely used in deep foundation engineering because of their many advantages, such as better adaptability to various ground condition, providing enormous bearing capacity by a single pile and smaller dosage of reinforcing steel bar. but, their own disadvantages, such as sediment under tip, clay slurry around pile, friction and tip resistance disagreement and initial ground stress freeing, limited their bearing capacity, lowered the utilization ratio of material and increased the settlement

    灌注樁,因其對地層適應性強、能提供較大的單樁承載力、鋼筋用量少等優點,在目深基礎中得到了極為廣泛的應用。但是,灌注樁的固有缺陷,諸如孔底虛土;孔壁泥漿;端阻、側阻發揮不同步;孔后原地應力釋放等,限制了其承載力的發揮,使得材料利用率不高,沉降較大。
  7. The machine is used for transfer the glass beads from front side to backside after finishing front side grinding and polishing

    後端面的轉換。操作簡單,轉接過流暢,作效率高。
  8. By analyzing the developing situation of the trenchless technology at home and abroad, and combining the characteristics of the modern computer multimedia technology, the article brings forward that it is necessary to design the multimedia training system on horizontal directional drilling. then base on introducing the content of horizontal directional, the article puts forward the scheme of overall, engineering reconnaissance, slurry knowledge, construction principles, construction process, construction equipment, construction design model, the function, the designing technology, the applying forefound and the mending plan of the the multimedia training system on horizontal directional drilling

    本論文從國內外非開挖技術的發展情況分析,以及結合現代計算機多媒體技術的特性,提出開發「水平定向鋪管技術多媒體培訓系統」的必要性;並在簡略介紹水平定向機鋪管技術的基礎上,給出開發「水平定向鋪管技術多媒體培訓系統」的「總論」 、 「施勘測」 、 「泥漿處理」 、 「施原理」 、 「施藝」 、 「施機具」和「施設計」七大模塊的具體設計方案、實現的主要功能和系統開發的關鍵技術,最後分析了該系統的應用景和改進方向。
  9. Till now we have owned a full set of glass processing line : from automatic glass tube cutting smoothing, supersonic notching, glass sanding to final shaping. also we have our own hand - blown workshop for lampshade and christmas colorful balls

    裝飾。目已擁有成套先進的玻璃加設備,並形成了比較完善的藝流,從玻璃管自動切割與燒口,超聲波孔,玻璃品成型,打砂蒙砂到冰花夢幻後期製作,加藝非常純熟。
  10. We also sell the sports implements from america and taiwan as agent, design and install specially the middle and top grade bodybuilding club, the community bodybuilding path, service and safeguard the implements in gymnasium. feida company has made the self - owned cosmic brand - " fairtall " be famous brand of sports and massage equipments in china through clutching the newest international developing trend in the industry, developing and producing the newest stylist production

    廣州飛達公司目擁有員近千名,並引進國內外先進自動生產設備注塑設備自動機械手臂等多種生產設備,從原物料采購開始,裁沖彎焊銑刨車噴塗組裝等所有生產過皆在廠內完成,便於嚴格控管所有產品的質量。
  11. At present, some have been approved by bores and pits, some have been proofed by geophysical prospecting information

    ,一些成果已被礦山坑、證實,有的已被物探資料所佐證。
  12. Current research of failure mechanism and physics model of pth in manufacture process including drilling, electroless plating and electroplate were reviewed

    孔、化學鍍銅、電鍍三個主要藝入手,對目製造過鍍通孔失效的機理與物理模型的研究現狀進行總結。
  13. An organization of visitors, both domestic and foreign enterprises machinery industry experts and scholars, managers, technical personnel, etc. 2. automobile manufacturers, aerospace, power water, electrical, shipbuilding, farm machinery, engineering machinery, oil drilling, mining machinery, transport machinery bearings and other industrial areas, general manager president, procurement manager staff new product research and development, marketing and machinery for the industrial demand, traders and others came to visit

    1組織國內外機械行業企事業單位專家學者管理人員技術人員等2汽車生產廠家航空航天電力水利電機船舶農用機械機械石油探礦山機械交通運輸機械等軸承業應用領域的總經理董事長采購部經理人員新產品研究開發人員營銷主管及機械業相關的需求商貿易商等來參觀。
  14. Based on the investingation and some study methods of the stability on the goaf, the paper has the goaf of the first and second tunnels of wu long channel on coal mine railway leased line in da ning of shanxi province as an example, according to the engineering geological invesitigation and maping in the earth ' s surface, also combining the visit on the relate people, firstly has a geological judge on the space extend of the mostly ledges which have been picked ; then adopts the instrument of engineering surveying and checking ( for short sws ) which is relatively advanced inside and outside to test by surface wave the rockmass and solid near the middle line of the tunnel ( total forty meter ), and has a relatively exact judgment on the place that the goaf impossible reveal ; lastly passing the validate by drilling, it make clear that the results which tested by sws is reasonable and believable, based on finding out clearly the space extend of the goaf, the author makes a relatively systemic study on the stability of wall rock around the goaf

    因此,查明采空區的具體位置,在此基礎上對場地進行適宜性評價,對整個建設具有重要的指導意義。本論文在總結人對地下采空區勘察及有關穩定性研究方法的基礎上,以山西大寧煤礦鐵路專用線五龍溝1 ~ # 、 2 ~ #隧道采空區為研究實例,在詳細的地表地質調查和測繪的基礎上,結合通過對采空區有關人員的探訪,首先對主要開采礦層的空間展布進行地質判斷;然後採用國內外較為先進的勘探與檢測儀(簡稱「面波儀」 ) ,對1 ~ # 、 2 ~ #隧道中線兩側一定范圍內(共40米)進行了面波測試,對采空區的可能出露部位進行了較為準確的判斷;最後通過探加以驗證,表明面波儀的測試結果是較為合理可信的。
  15. The railway tunnels along canton road and underneath the former marine police headquarters will be constructed by the bored tunnelling method to minimize impacts on the adjacent environment. other than the excavation works that need to be carried out within the works site near the canton road government offices for the new station and introducing the tunnel boring machine, the works that need to be carried out at the street level along canton road will be small in scale so as to minimize the impact on the environment in the neighbourhood

    在廣東道沿路和水警總部地底的鐵路隧道,會以挖隧道方式建造,除了在廣東道政府合署現址附近的地內挖開地面以便興建新車站及引進隧道挖機外,需要在廣東道路面進行的規模會很少,以便盡量減少對毗鄰環境的影響。
  16. For the problem of present engineering no criterion market and industry standard disunity of no - dig horizontal directional drilling under pipe paving, the view is put forward in particularity and security of no - dig horizontal directional drilling pipe paving and in reason using of under resource. it emphasizes engineering method data management and unify layout management of no - dig horizontal directional drilling. and it analyzes technology economic and discuss the development of under pipe directional equipment and put forward new thought and studying aspect of no - dig horizontal directional drilling construction engineering criterion management - the effect of all kinds of tache and factor in the different no - dig directional drilling construction are discussed from a great deal of detail no - dig engineering examples

    就當水平定向進鋪設地下管線市場不規范和行業標準不統一的問題,本文從非開挖水平定向進鋪管技術特殊性和安全性及地下資源空間的合理利用方面提出了自己的看法和見解,特別強調了對非開挖定向進鋪管技術資料的管理和非開挖施的統一規劃管理的問題,並對非開挖水平定向進施進行了技術經濟分析,並就非開挖施的管線定位的儀器研發進行了分析探討,為非開挖施的管線規范管理提出了新思路和研究方向。
  17. And it is necessary to explore other new resource base. gaosong field is the only field in which work degree is low, and there is only a no. 10 group being mined. while some geological, geochemical, geopgysical data and a few drill data of gaosong field having been accumulated after liberation, and with the work of this time, it can be satisfied to predicate mineral resource in this field

    而高松礦田是個舊礦區目度較低的區域,僅在礦田中部北段開采10號礦群,但自解放以來該區域積累了一定的地質和物化探資料及少量的孔資料,再加上本次做的一些作,基本可以滿足綜合礦產資源信息分析與預測的需要。
  18. Based on the successful application of mudlogging data analysis in evaluations of oil and gas beds, formation preessure and monitoring drilling engineering in the pushen well no. 1, one of the key - wells of the daqing oilfield, the authors explain the importance of this mudlogging technique in exploration of oil and gasp and emphasize the significance of the technique for the exploration projects of oil and gas of similar category

    摘要根據大慶油田重點預探井葡深1井錄井施中綜合錄井資料在評價油氣層、地層壓力檢測和監測等方面的成功應用,闡述了該技術目在油氣勘探中的重要作用,及對今後同類油氣勘探項目建設的借鑒意義。
  19. Adopt at present most advanced large - scale super sap finite element structure analyse procedure to go on numerical value calculation for model of drilling rod, drilling rod whole stress simulation of state that receive show and reflect drilling rod various kinds of stresses under different working states distribute the characteristic clearly, make stress state of drilling rod reach visual, make people able to understand informations of drilling rod of stress status in depth too at the same time, so that the design of the improvement drilling rod constantly is in order to meet the demands of actual project

    採用當最先進的大型supersap有限元結構分析序對桿的模型進行了數值計算,得到的桿整體應力狀態的模擬顯示清楚地反映了桿在不同作狀態下的各種應力分佈特徵,同時也使桿的應力狀態達到了可視化,使人們可以深入了解桿應力狀態信息,以便不斷的改進桿的設計以滿足實際的需要。
  20. If this method is adopted, the work of geologic prospecting can be reduced before blasting construction, which saves a lot of engineering expense. and on the other hand, this method is more accurate than general ones, which is in favor of blasting construction and can reduce the mistakes and the accidents that are unwanted

    這種方法,一方面可以減少爆破的地質勘查作,節約開支;另一方面從爆破孔過中可以獲得每個炮孔不同部位的巖石性質,比常用的方法更精確,更有利於爆破的施,減少爆破施中不必要的失誤和事故。
分享友人