鉆孔于 的英文怎麼說

中文拼音 [zhēnkǒng]
鉆孔于 英文
vent
  • : 鉆Ⅰ名詞1. (打眼用的工具) drill; auger 2. (指鉆石) diamond; jewel Ⅱ動詞(用尖物在另一物體上轉動) drill; bore
  1. The hunt oil company of dallas has become the first international company to receive permission to drill for oil in the kurdistan region of northern iraq since the local government issued an oil - and - gas law last month

    亨特塗油水達拉斯的公司已經成為第一家國際的公司受到許可在北部伊拉克的庫德斯坦區域中為油自從地方政府發行了油和上個月的瓦斯法律。
  2. Drilling temporary soil nail for retaining wall no. 44 at cheung sha

    長沙的擋土墻編號44進行臨時泥釘的工程
  3. This article aims at the characteristics of a baibie harbor great bridge, by the spot construction test and mechanicses, limited an analysis, dissolve to the construction technics and loading capacity, stake deliver mechanism, bearing stratum and glazing rock depth area curve etc. s of the borehole cast - in - place concrete pile in the karst terrain do the some study research

    國內外對巖溶地區灌注樁的研究,主要是針對具體工程的施工方案描述和施工故障及處理措施,對巖溶地段基樁的承載機理及承載力的綜合研究則未見報道。本文針對白墅港大橋的特點,通過現場施工試驗及力學、有限元分析,對巖溶地區灌注樁的施工工藝、荷載傳遞機理、持力層厚度及嵌巖深度等方面做一些探討性研究。
  4. Centalic technology development ltd. was established in 1980 and provided pcb hole - drilling services since then. as a hong kong manufacturer, centalic began to produce bare - board testers in 1985. further than that, in 1987, contact probes were made for the bare - board testers and also for export purpose

    先得利科技發展有限公司成立於年初期主要經營印刷電路板服務年增設裸板測試機項目自年起為配合測試機及拓展海外市場的需要新研發了測試針項目
  5. To ensure the construction quality and safety of large diameter bored piles in deep waters, it is crucial to apply the leading construction technologies with steel liners that are fabricated with appropriate wall thickness and to a high level of quality

    摘要採取先進的施工工藝和設備,高精度地沉設具有必要壁厚和高水準加工質量的鋼護筒,對保證深水大直徑灌注樁的施工質量和安全是非常重要的。
  6. Note 7 - remarks as to the origin may take the form of a boring number and sample number in conjunction with a job number, a geologic stratum, a petrologic horizon or a location description with respect to a permanent monument, a grid system or a station number and offset with respect to a stated centerline and a depth or elevation

    注7 -對原狀樣的記號可以採用下面的形式,一個編號和一個樣品編號聯合一個工作編號,一個地質地層,一個巖石層位或者一個考慮為永久界標的原地描述,一個柵格系統或者一個測站編號和考慮到規定的中心線和深度或海拔的偏移量
  7. In order to simplify the computation and be advantageous for the theoretical analysis, the soil partial heat transfer analysis uses the unstable condition heat transfer model analysis research regarding the drill hole outside

    為了簡化計算,便於理論分析,對以外土壤部分的傳熱分析,需要採用非穩態的傳熱模型分析研究。
  8. For the widest variety of uses in hobby and do - it - yourself jobs, fini offers a vast range of pneumatic tools, including : air blow, inflating and washing guns ; sanders and die grinders ; spray - guns ; impact wrenches ; saws ; staple - guns and nailing guns ; drills, hammers, and much more

    愛好自製工作的愛好者提供了寬廣的種類選擇, fini提供許多氣動工具,包括:空氣槍,打氣和清洗槍打砂器和研磨床噴漆槍套筒扳手鋸打釘槍和撞擊槍機,鐵錘等。
  9. Suggestions for post insertion are as follows : 1. the stress can be reduced by counterrotating the dowel one - fourth turn after resistance to installation has been detected. 2. the channel should be cleaned thoroughly before post insertion. 3. because accurate post fit is important to maximize both retention and support, the screw post should be used with the matched post / reamer syste ; and accurate contrangle drilling should be maintained

    3 .由於根柱和根柱的精密吻合,對固位及力量傳遞的支持有重要的影響,因此打樁時要精確做到根柱的鄉制,對偏斜的彎機要避免使用,而且要選用同號組合配對的針。
  10. It can be used not only to infer position of the magnetic body relative to the drill hole but also to make quantitative - semi - quantitative calculation and inverse interpretation and calculation of the distance and depth from head or tail of ore bodies to the known drill hole at surface by rotating an angle so as to design drilling depth, dip angle and orientation of the next drill hole

    其作用不僅可以判斷磁性體相對的位置,而且可以進行定量和半定量計算,以及經旋轉一角度採用地面方法作反演解釋,計算礦體頭部或尾部距已知的距離、深度,設計下一的深度、頂角、方位角。
  11. The cast - in - place pile has become the major foundation form to road and bridge construction for the feasible practice of various geological structure, load bearing and strong resistance to earthquake

    灌注樁基礎能適應不同地質條件、荷載情況,抗震能力強,因此成為了公路橋梁的主要基礎形式。
  12. End - of - season moisture stressed in groundnut crop exceeding 20 days, mean soil temperature of 28 - 31 in pod zones, pod damage by termites, borers or nematodes and plant death due to fungal disease are identified by icrisat ( andhra pradesh in india ) as triggers for aflatoxin contamination in pre - harvest groundnuts

    未收獲的花生來講,以下情況都是黃麴黴毒素發生的誘因:收獲高濕度超過20天,花生莢溫度28 - 31 ,花生莢被白蟻、的蟲子及線蟲破壞,由於真菌icrisat病造成的花生整株死亡等等。
  13. Adopting the deformation harmony theory, the numeric calculation of the curve of load versus settlement is made. the fitting results between the calculated curve of load - settlement and the measured one of piles with different construction process are illustrated. hence, under the condition of few or no static load test data, the performance of bearing capacity of single bored pile in loess may be predicted utilizing indexes of shear wave velocity, static cone penetration test and modification coefficient of depth, so it is remarkable to reduce the blindness of preliminary design of pile

    通過室內試驗及原位測試指標進行理論計算與現場實測值的對比,筆者引入了施工工藝修正系數k _ ( c1 )和k _ ( c2 )及深度修正系數,使理論計算值與現場實測值具有良好的一致性,進而通過變形協調理論對荷載?沉降曲線進行數值計算,並用不同施工工藝的實例說明了理論計算荷載?沉降曲線與實測荷載?沉降曲線的擬合效果,從而達到可在不做靜載荷試驗或少做靜載荷試驗的情況下通過剪切波速和靜力觸探試驗指標以及施工工藝修正系數等預測黃土地基中灌注樁承載性狀,這對工程初步設計中減少設計的盲目性具有十分重要的現實意義。
  14. The extension drill rod which can be used for higher capacity drill, the drill hole can be extended to sezeral meetrs, when drilling the straight hole, the core lifter can help coring

    選用加長較大能力的機,可將延深至數米,垂直時,可採用取芯器配合取芯。
  15. The personnel of shanghai luhua fire - fighting equipment co., ltd. is pleased if they could give you further data on the exercised fields of activity such as water pumps, routine, submersible motors, moreover also on deep wells, conditions, industrial water and beyond that also on linkage and industrial water supply by mail or telephone

    您可以垂詢銷售部門關例行維修、條件、規定、限制項目、深進和生活用水供應、工業用水供應、生活用水、工業用水、邏輯電路、連接、並置、串聯或排水泵、水泵的產品供應和價格。
  16. Severe protests from local residents living along mrt routes during the route alignment coordination caused a two - year delay to the proposed schedule for the hsingchuang line. therefore, to reduce the extent of tunneling is a key consideration in the long - term planning of mrt routes. other downsides to the single tunneling method are that it requires longer construction time, and that two break throughs from the tunnel to the work shaft involve a higher construction risk

    另因採用單潛盾隧道須掘上、下行隧道,除施工時程較長外,且兩次破鏡將增加施工之風險,故有鑒潛盾機之技術日新月異,國外已有採用多圓形潛盾工法( mf工法)之成功案例,此除可減少用地徵收補償之困擾外,且可減少隧道開挖面積進而減少棄土所造成之問題。
分享友人