鉆孔豎井 的英文怎麼說

中文拼音 [zhēnkǒngshùjǐng]
鉆孔豎井 英文
drilled shaft
  • : 鉆Ⅰ名詞1. (打眼用的工具) drill; auger 2. (指鉆石) diamond; jewel Ⅱ動詞(用尖物在另一物體上轉動) drill; bore
  • : Ⅰ形容詞(跟地面垂直的; 從上到下的) vertical; upright; perpendicular Ⅱ動詞(使物體跟地面垂直) se...
  • : Ⅰ名詞1 (從地面往下鑿成的能取水的深洞) well 2 (形狀像井的東西) sth in the shape of a well 3 (...
  1. When it has been decided where we are going to drill, we put up at the surface an oil derrick.

    決定了位置后,我們就在地面上架。
  2. 176 drillholes, 9 coreholes, 178 trial pits, refurbishment of 48 existing standpipes piezometers, laboratory testing of soil and rock samples obtained from the investigation works along tuen mun road

    176個, 9個土芯, 178個探,重整48個管測壓計及一系列的土壤和巖石樣本的實驗室試驗。
  3. 224 drillholes, 250 trial pits, refurbishment of 48 existing standpipes piezometers, laboratory testing of soil and rock samples obtained from the investigation works and the structural condition survey on existing highway structures along tuen mun road

    224個, 250個探,重整48個管測壓計,將所取得的土壤和巖石樣本進行實驗室試驗,以及對屯門公路上現有的公路建築物進行結構狀況勘測。
  4. In order to ensure the safety of engineering, it should be careful to use the test result of normal drilling sampling, the pitting sampling, shaft sampling, or double - tubles and thin - wall soil collecting methods should be used

    為保證工程安全,對常規取樣試驗成果的使用應當慎重,對重要工程宜採用探坑、取樣,或採用雙筒薄壁取土技術。
  5. The machine can adopt positive and negative circulation and other deep drilling technique, adapts to various stratum, is the first selected equipment for foundation construction of river ' s bridge and dock, and also adapts to large diameter borehole construction such as tall building, coal mine vertical well and sewage well, it exerts great action many changjiang river large scale bridges foundation construction

    該機可採用正反循環等進工藝施工,適合於各種地層,是江河橋梁、碼頭基礎施工的首選設備,也適用於高層建築、煤礦和污水等大口徑施工,在多座長江大型橋梁基礎施工中發揮了巨大作用。
  6. The filling pile drilling machine of kp2000 type applies to pore forming construction of various architectural base and shallow well with heavy caliber, vertical well of small coal mine, defense engineering bore using and other drilling projects

    Kp2000型灌注樁機適用於各種建築基礎成施工以及大口徑淺水、小煤礦、國防工程用工程。
  7. Generally speaking, the big primary soil sample collected in shaft is the true primary state soil sample, the sample collected by soil collected equipment in drilling is of different degree disturbance

    一般認為中採取的大塊土樣,是「真正」的原狀樣,中使用取土器採取的原狀樣存在不同程度的擾動。
  8. Based on an actual project, tests and analyses the heat exchanging performances of the vertical u - shaped ground heat exchanger, and obtains the heat release in summer and the heat absorption in winter of ground heat exchanger for unit well depth and the optimal drilling depth

    摘要根據工程實際情況,對直u形地埋管換熱器的換熱性能進行了現場測試和分析,得出了單位深地埋管的夏季散熱量、冬季取熱量及最佳地埋管深度。
  9. Through comparative analysis to the test data of tow sampling methods in drilling hole and sampling method in shaft, it was found out by the author that the drilling sampling method has obvious disturbance and depression to the soil sample, which caused the soil sample ' s dry density to be increased, porosity ratio to be decreased, filtration coefficient to be decreased, and modulus of compression to be increased

    筆者通過對兩種方法獲取的土樣與土樣試驗數據的對比發現,取樣對土樣有明顯的擾動和壓密作用,造成了土的干密度增大、隙比減小、滲透系數降低、壓縮模量增大。
  10. When it has been decided where we are going to drill, we put up at the surface of an oil derrick.

    當決定要在哪裡時,我們在那塊地面上起一個架。
分享友人