鉆孔速度 的英文怎麼說

中文拼音 [zhēnkǒng]
鉆孔速度 英文
drilling rate
  • : 鉆Ⅰ名詞1. (打眼用的工具) drill; auger 2. (指鉆石) diamond; jewel Ⅱ動詞(用尖物在另一物體上轉動) drill; bore
  • : Ⅰ形容詞(迅速; 快) fast; rapid; quick; speedy Ⅱ名詞1 (速度) speed; velocity 2 (姓氏) a surna...
  • : 度動詞[書面語] (推測; 估計) surmise; estimate
  • 速度 : 1. [物理學] velocity; speed; blast; bat 2. [音樂] tempo3. (快慢的程度) speed; rate; pace; tempo
  1. The study includes the hole color tv imagery system for drill hole, even - pole bore - hole acoustic system and acoustic meter, bore - hole multi - point consolidation apparatus, the quick camera computer - aid image for high rocky slope, image technology for layer analysis, safety monitoring technology for the section close to the dam, software for processing and forecasting the slope monitoring data, high precision geodesy monitoring automation system, etc. all the study results are new, advanced and practical, which has applied in the project and gained the obvious benefits

    彩色電視壁成像系統、直接橫波測井研究偶極子井下聲系和聲波儀、多點滲壓儀及壓模系統、巖質高邊坡快攝像微機地質素描成圖、層析成像技術、近壩庫段安全監測技術、邊坡監測數據處理預報軟體研究、高精大地測量監測自動化系統等項目,研究成果內容新、先進、實用,已在工程中應用,效益顯著。
  2. Technical condition about inflatable device for determining initial velocity of gas emission from boreholes

    充氣式瓦斯湧出初.測定裝置技術條件
  3. Compared with the mud on wall form hole technology, clash stake technology or vibration sink pipe technology used in complex foundation stake forming, it has advantages of no vibration, no pollution, and no noise. in addition, since the concrete pressed into the drill stem sent vibration free concrete to the pump, so it is eas y to ensure the quality of the stake body. compared with the mud on wall and dry work form hole technology, the side obstruction and end obstruction of screw drill press concrete stake have all been accordingly improved, the weight bearing is better, and the transmutation of the complex foundation is less

    其中,螺旋壓灌混凝土成樁技術自研製以來,已在多項復合地基工程中進行了應用,較好地解決了軟弱地層成困難的問題,適應地質條件范圍廣,成樁較快,工期短、工效高;與復合地基成樁時的泥漿護壁成工藝、振沖樁工藝或振動沉管工藝施工比較,具有無振動、無污染、無噪音的優點;另外,壓入桿內的混凝土為泵送免振混凝土,因此樁體質量易於保證;與泥漿護壁和干作業成工藝相比,螺旋壓灌混凝土成樁的側阻和端阻都有相應的提高,樁的承載性能較好,復合地基的變形較小。
  4. 1 it has great drilling capability, wide range of application, rapid drilling speed and high drilling efficiency, as well as powerful ability of eliminating accident

    機特點1進能力強,適用范圍廣鉆孔速度快,處理事故能力強,進效率高。
  5. 4 rig structure is separate group design, it assures good disassembility, rapid and convenient mount and transport, best working environment and lower labor strength as well as remote control and operation

    5機結構為分體式,可拆性好,搬遷安裝訊方便並可遠距離操縱,一次搬遷完成多施工操作員工工作環境好,勞動強低。
  6. 4 rig structure is separate group design, it offers good disassembility, rapid and convenient mount and transport, better working environment and lower labor strength as well as remote control and operation

    4機結構為分體式,可拆性好,搬遷安裝訊方便並可遠距離操縱,一次搬遷完成多施工操作員工工作環境好,勞動強低。
  7. 1. setting a measure device on the drilling machines, a new method of gaining the characters of rock and soil from the blasting drilling is gotten, which is economic and accurate and from which the characters of different parts of the blasting hole are got accurately

    取得的主要成果如下: ( 1 )在機械上附加一測量裝置,通過在土巖爆破施工現場直接從爆破進過程來實時獲取炮不同部位的巖石性質。
  8. The quantification indexes that token weathered degree are primary velocity, borehole rqd ( rock quality designation ), joint space, joint number and so on, and the unloading ones are primary velocity, joint opening, borehole penetrability and so on. the compartmentalization of different weathered and load - off zones according to quantification indexes tallies with the slope geo - stress computed by finite element method

    其中研究風化分帶的定量指標有縱波vp 、rqd 、結構面間距與條數等,研究卸荷分帶的定量指標有縱波、節理開巖體透水性,據此劃分的不同程風化、卸荷巖體與有限元計算的壩區河谷應力場具有良好對應性。
  9. Such modular function as the high - static pressure spindle box, spring collet chcks of various sizes as well sw more than twenty kinds of front back, left and right tool rests for extrnal cutting, tool post for boing and drilling are available for users to select

    本機床有多種功能模塊部件,供用戶選擇使用,如:高精靜壓主軸箱,氣動和手動彈簧夾頭快夾緊機構,各種類型的彈簧夾頭,車外圓的前刀架,后刀架,左刀架,右刀架以及刀架,鏜刀架和冷卻箱件等二十多種。
  10. Methods utilize magnetic resonance - mud logging ( mr - ml ) technology to rapidly and accurately analyze such parameters of cuttings, core and sidewall core as porosity, permeability, ffi, bvi and oil saturation, etc

    方法利用磁共振錄井技術在井現場快、準確地分析巖屑、巖心及井壁取心的、滲透率、可動流體飽和、束縛流體飽和及含油飽和等參數。
  11. The product is a special drill for drilling glass. its features are ; quick in speed and no side damage. its life of operation is more than 3000 holes

    該產品用於玻璃打,專用頭具有快、無崩邊、使用壽命在3000隻以上。
  12. Based on hundreds of actual site profiles collected in china, 1281 typical profiles were selected or constructed, which were used for studying three kinds of soil layer profiles containing soft layers that locate at the bottom, in the mid or on the top of them. 480 acceleration histories were formed artificially, which can express the different characters of ground motions and be used as the ground motion inputs in the study

    在整理分析全國各地諸多實際工程場地資料的基礎上,從中選取和構造了1281個研究三種不同土層結構的場地計算模型;合成了480條能夠反應不同地震動特徵的加時程曲線,並將其作為土層地震反應分析的地震動輸入。
  13. The high speed drilling shaft and pin cylinder system work at the same reference axis to ensure high work precision and convent operation

    精密主軸和釘銷氣缸系同基準軸線上工作,能保證工作精高,操作方便。
  14. Moreover, a series of solution to these difficulties are brought forward : applying the theory of fold related to fault to interpret complex structural belts in piedmont : analyzing the features of the surface and underground seismic reservoir prediction and porosity model construction to predicate effectively the texture and quality of sandbodies ; using structural model to direct the construction of velocity model and process prestack migration imaging of seismic data ; utilizing interval velocity to forecast reservoir pressure : improving the drilling technology for pressure detection and prompt protection of vertical well against incline well

    並針對主要難點提出了解決對策:正確應用斷層相關褶皺理論解釋山前復雜改造、開展地表井下地震儲層與隙建模有效預測砂體結構與質量,利用有效構造建模指導建模與疊前偏移成像、開展層預測地層壓力與井壓力檢測及快防斜打直配套井技術攻關等。
  15. " stainless steel tube fittings " eliminate the needs of resolving theproblems of overcoming and land shapes with drilling, polishing, welding, etc. at site, and the fittings simply resolve them with adequate variety, swift to install, cost - effective while wanting the least labor force. top appearance and top safety

    不銹鋼圓管組合配件,無論任何角,任何施工地形,皆有充足的組合配件來解決施工者現場、焊接、研磨、拋光等繁雜之加工過程,施工快,節省工資,符合現今缺工的需求。
  16. Another vital technology is the chikyu ' s dynamic positioning system, an automatic, satellite - guided location fixer that corrects against wind, wave and current forces with six 360 - degree thrusters under the hull, keeping the ship over the borehole

    地球號另一個重要的技術則是動態定位系統,這是一個利用衛星導航的自動定位器,並且校正了風、海浪與船底的六個360推進器產生的力量,使船可以一直維持在的上方。
  17. A lot of cuttings can be produced during the field exploiting and production. but existing techniques ca n ' t acquire the key petrophysical parameters such as porosity, permeability, mobile fluid percent and oil saturation etc. from the cuttings

    目前,現有的技術無法快從油田勘探開發過程中收集到的大量井巖屑中獲得、滲透率、可動流體百分數及含油飽和等重要油層物理參數。
  18. A new method of gaining the characters of rock and soil from the blasting drilling is studied, which is different from general methods and more economic and accurate than them. and a new rock classification is discussed, which involves fuzzy integrated judge method and the affecting factors of drilling

    為更好地進行後期的爆破設計如炸藥與巖石的優化匹配等,本文綜合考慮各種影響鉆孔速度的因素,首次提出了採用模糊綜合評判的方法對中獲取其性質的巖石進行分級。
  19. Adopting the deformation harmony theory, the numeric calculation of the curve of load versus settlement is made. the fitting results between the calculated curve of load - settlement and the measured one of piles with different construction process are illustrated. hence, under the condition of few or no static load test data, the performance of bearing capacity of single bored pile in loess may be predicted utilizing indexes of shear wave velocity, static cone penetration test and modification coefficient of depth, so it is remarkable to reduce the blindness of preliminary design of pile

    通過室內試驗及原位測試指標進行理論計算與現場實測值的對比,筆者引入了施工工藝修正系數k _ ( c1 )和k _ ( c2 )及深修正系數,使理論計算值與現場實測值具有良好的一致性,進而通過變形協調理論對荷載?沉降曲線進行數值計算,並用不同施工工藝的實例說明了理論計算荷載?沉降曲線與實測荷載?沉降曲線的擬合效果,從而達到可在不做靜載荷試驗或少做靜載荷試驗的情況下通過剪切波和靜力觸探試驗指標以及施工工藝修正系數等預測黃土地基中灌注樁承載性狀,這對于工程初步設計中減少設計的盲目性具有十分重要的現實意義。
  20. And it is worthy to say that this method is very simple to realize and suits for practical blasting engineering. 2. a new rock, classification based the rock drillability is discussed, which involves fuzzy integrated judge method and the affecting factors of drilling

    ( 2 )以巖石本身的可性為依據,兼顧考慮到其他影響鉆孔速度的各種因素,採用模糊綜合評判的方法對通過實時獲得其性質的巖石進行分級。
分享友人