鉆探阻力 的英文怎麼說

中文拼音 [zhēntàn]
鉆探阻力 英文
boring resistance
  • : 鉆Ⅰ名詞1. (打眼用的工具) drill; auger 2. (指鉆石) diamond; jewel Ⅱ動詞(用尖物在另一物體上轉動) drill; bore
  • : Ⅰ動詞1 (試圖發現) try to find out; explore; sound 2 (看望) call on; visit; see 3 (向前伸出)...
  • : 動詞(阻擋; 阻礙) block; hinder; impede; obstruct
  • : Ⅰ名1 (力量; 能力) power; strength; ability; capacity 2 [物理學] (改變物體運動狀態的作用) forc...
  • 阻力 : 1 (阻礙事物發展的外力) obstruction; resistance 2 [物理學] resistance; drag; drag force; nowel; ...
  1. Abstract : tight trips often occur for hole undergauge during drilling in east sichuan oilfield. the paper analysis the causes of hole undergauge, proposes preventive and treatment measures which are to optimize design from geologic structure features, to use suitable fluid column pressure, to select different drilling fluid types, to adopt advanced drilling technology and perfect field technical management. therefore, good economic benefit will be obtained

    文摘:川東構造在作業中因井眼縮徑造成起下卡時有發生,文中對造成井眼縮小的原因進行分析並劃分為五類因素,提出應在地質構造特徵方面優化設計,採用合適的液柱壓,選擇不同的井液類型,使用先進的井工藝和完善現場技術管理等措施進行預防和處理,將取得重大的經濟效益。
  2. In this section the author analyses the rules of the pile ultimate tip resistance and the shaft friction resistance distribution and their exertion of cast - in - place socketed piles instrumented with strainometers in soft muddy rock. the second aspect of the paper is the analysis on the current rock pile vertical bearing capacity in the four standards gb50007 - 2002, tb 10002. 5 - 99, jtj024 - 85 and jgj94 - 94, then the design method with correlated formula of socketed piles in xigeda - mudstone is given. at the end of this paper, based on the research of pressure grouting technique in recent years, and combined with in - site test result, this paper puts forward the design and calculation method to grouted pile in xigeda - mudstone and the principle of choosing grouting parameters, which provid es experiences for applying this technique and further studying

    本論文結合省級科研項目「西攀高速公路昔格達組泥巖層中孔樁提高承載的研究」 ,所做的研究工作主要在以下三個方面:一是根據8根樁身內埋設量測元件試樁的單樁豎向靜載荷試驗資料,分析了各試驗樁特別是常規沖孔灌注嵌巖樁在昔格達泥巖中的軸向、側摩和樁端的分佈和發揮規律;二是在討論現行規范對嵌巖樁承載的計算公式的基礎上,討了在昔格達泥巖層中的沖孔灌注嵌巖樁的側摩和端的計算方法,並推薦了相應的計算公式;最後,在吸取近年來對灌注樁后注漿技術研究成果的基礎上,結合現場試驗研究結果,分析了該項技術在昔格達巖層中的應用效果,提出了相應的參數選取,從而為壓灌漿技術的工程應用和進一步研究提供經驗,並為今後在該地層中合理選用樁型以及指導施工提供了依據。
  3. Based on the results of vertical static loading test and stress test for longhole bored pile in loess foundation, by analysing the transferring law of axial force and the action of lateral friction resistance and bottom resistance, the paper discusses the influences of two types of holing technology on bearing capacity behavior

    本文通過黃土地基中旋挖孔灌注長樁和泥漿護壁孔灌注長樁靜載荷試驗和樁身應的測試,分析了黃土地基中兩種成孔工藝孔灌注長樁樁身軸的傳遞規律、樁側及樁端的發揮性狀,討了兩種成孔工藝對孔灌注長樁承載的影響。
分享友人