鉆柱受力分析 的英文怎麼說

中文拼音 [zhēnzhùshòufēn]
鉆柱受力分析 英文
drill string force analysis
  • : 鉆Ⅰ名詞1. (打眼用的工具) drill; auger 2. (指鉆石) diamond; jewel Ⅱ動詞(用尖物在另一物體上轉動) drill; bore
  • : Ⅰ名1 (力量; 能力) power; strength; ability; capacity 2 [物理學] (改變物體運動狀態的作用) forc...
  • : 分Ⅰ名詞1. (成分) component 2. (職責和權利的限度) what is within one's duty or rights Ⅱ同 「份」Ⅲ動詞[書面語] (料想) judge
  • : Ⅰ動詞1. (分開; 散開) divide; separate 2. (分析) analyse; dissect; resolve Ⅱ名詞(姓氏) a surname
  1. On the basis of analyzing the working circumstance and prosperity of downhole drilling string of the surface dynamic rotating drilling vertical well, the force prosperity and failure forms of downhole drilling string are focused on. and further research has been done on the vibration damage of downhole drilling string as well as the construction and work prosperity of vibrating - proof hydraulic shocker absorber

    本文在對地面動旋轉井直井井下的工作環境和特性加以的基礎上,著重對在井下的特性以及損壞形式進行了,並對在井下的振動危害以及用於防止振動的水加壓減震器的結構、工作特性等一些規律進行了深入的探索和研究。
  2. In chapter two, the prosperity of the motion, force and screwed joint of the surface dynamic rotating drilling downhole drilling string has been discussed

    第二章探討了地面動旋轉井井下的運動狀態、及螺紋聯接的特性。
  3. On the basis of analyzing the rock mechanics, the bit working circumstance and property in the bottom hole of 6000m deep well, and making use of the former equipment such as a derrick, platforms etc, the paper demonstrates that the research and design of the mechanical device have been established including the high pressure simulating well bore, the high pressure connector between the static well bore and the rotating drill pipe, the high pressure simulating system of circulating fluid and the high pressure desander etc. the produce, control and dynamic analysis of the bottom hole four - dimensional pressure ( over burden, confined, pore and column pressure ) have been studied

    本文在對井底巖石的狀態以及頭的工作環境和特性加以的基礎上,藉助原有的井架、平臺等設備,研究設計了模擬6000米井底壓壞境的高壓模擬井筒、高壓轉聯器、井液高壓模擬系統以及高壓除砂器等機械裝置,並研究了井底四維模擬壓(上覆壓、圍壓、孔隙壓和液壓)的產生、控制及其控制的建模與模擬,從而實現井深至6000米的四維井底壓環境的模擬。
  4. In chapter two, the rock mechanics and the bit working circumstance in the bottom hole of 6000m deep well have been discussed. on the basis of which the high pressure simulating well bore and the high pressure connector between the static well bore and rotating drill pipe have been designed

    第二章探討了井底巖石的狀態以及頭的工作環境,並依此研究了建立該模擬壓環境的機械裝置?高壓模擬井筒和高壓轉聯器。
分享友人