鋪底 的英文怎麼說

中文拼音 [de]
鋪底 英文
[舊時用語] the furniture and odds and ends of a shop, workshop, etc
  • : 鋪名詞1. (鋪子; 商店) shop; store 2. (用板子搭的床) plank bed3. (舊時的驛站, 現多用於地名) post (often used in place names)
  • : 底助詞(用在定語后, 表示定語和中心詞之間是領屬關系, 現在多寫作「的」)
  1. There was a good brussels carpet on the floor, rich in dull red and lemon shades, and representing large jardinieres filled with gorgeous, impossible flowers

    地上著漂亮的布魯塞爾地毯,暗紅配淡黃的鮮艷色上織著插滿奇花異卉的大花瓶圖案。
  2. There is no different between the fibroblast feeder of mouse and the fibroblast feeder of goat according to blastoysts attached and icm proliferation. es - like cell develop embryoid body - like structure in suspension culture in vitro. es - like cells of goat differentiate into various kinds cell, egg : fibroblast cell, neurolike cell

    Es細胞在體外懸浮培養,形成類胚體,山羊類es細胞在無飼養層有明膠的皿上培養,可分化為多種類型細胞,如上皮細胞、成纖維細胞、神經細胞等。
  3. The total investment is 115. 82 million rmb yuan including fixed capital investment of 75. 82 million rmb yuan and circulating fund of 40 million rmb yuan

    投資規模該項目總投資11582萬元,其中固定資產投資7582萬元,鋪底流動資金4000萬元。
  4. Try cooking them slowly with tomatoes, garbanzo beans, onions and cumin for a mediterranean flavor, and served on a bed of polenta

    嘗試一下用西紅柿,鷹嘴豆,洋蔥和孜然芹做出地中海風味,然後用一層玉米粥鋪底
  5. Line a 26cm cake tin with greaseproof paper both bottom and the sides

    26厘米蛋糕模部和周圈都要上烤紙。
  6. Second step : paint general hue ( grounding colour )

    步驟二:添加五官,大體色調(上色) 。
  7. In some areas even aragonitic shells of the pelagic molluscs pteropods coat the sea floor.

    在有些地區,甚至深海軟體動物翼足類的文石貝殼可滿海
  8. When she came close and looked in she beheld indistinct forms racing up and down to the figure of the dance, the silence of their footfalls arising from their being overshoe in scroff - that is to say, the powdery residuum from the storage of peat and other products, the stirring of which by their turbulent feet created the nebulosity that involved the scene

    她走到屋前往裡一看,看見一群模糊的人影正按照跳舞的隊形來回奔跑著,然而他們跳舞的腳步卻沒有聲音,因為他們腳的是一層軟墊也就是說,了一層堆放土煤和其它產品的煤粉草渣,經過他們混亂腳步的攪動,就揚起一片煙雲,籠罩了整個場地。
  9. Study on the fatigue life of the tunnel bed structure under train loads

    列車荷載作用下隧道鋪底結構疲勞壽命分析
  10. ( 5 ) conventional, two dimension ( agarose coating ) and three dimension ( agarose embed ) culture system were compared in their efficiency of supporting follicle growth

    ( 5 )比較了普通培養法、二維培養法(瓊脂糖鋪底)和三維培養法(瓊脂糖包埋)的水牛腔前卵泡培養效果。
  11. Structure improvement of the burning bottom layer fan gate

    燒結布料鋪底料扇形閘門裝置結構改進
  12. The budget of the investment : the total investment capital is 35 million yuan rmb, the cost for purchasing the equipment is 22 million yuan rmb, the working capital is 13 million yuan rmb

    投資預算:總投資3500萬元人民幣,設備購置費2200萬元人民幣,鋪底流動資金1300萬元人民幣。
  13. The budget of the investment : the total investment capital is 300 million yuan rmb, the current funds is 10 million yuan, self - capital is 50 million yuan rmb, the capital importation is 250 million yuan rmb

    投資預算:總投資3億元人民幣,鋪底流動資金1000萬元人民幣;自有資金5000萬元人民幣,引進資金2 . 5億元人民幣。
  14. The budget of the investment : the total investment capital is 3 million yuan rmb, the current funds is 1 million yuan rmb, self - capital is 1. 5 million yuan rmb, the capital importation is 1. 5 million yuan rmb

    投資預算:總投資300萬元人民幣,鋪底流動資金100萬元人民幣;其中自有資金150萬元人民幣,引進資金150萬元人民幣。
  15. Wel bioer takes full account of the operation tendency and risk of its partners from goods discount, paving the way for coming into the market, marketing, training and marketing human resource and prompting system equipment

    無論是供貨扣率,入市鋪底,營銷推廣與培訓支持,還是營銷人力資源配備,激勵機制配置等,均能充分考慮合作夥伴的經營勢態及風險。
  16. The budget of the investment : the total investment capital is 20 million yuan rmb, the cost of the construction is 10. 5 million yuan rmb, the cost for purchasing the equipment is 7 million yuan rmb the foundation current capital is 2. 5 million yuan rmb

    投資預算:總投資2000萬元人民幣,建築工程費1050萬元人民幣,設備購置費700萬元人民幣,鋪底流動資金250萬元人民幣。
  17. The budget of the investment : the total investment capital is 30 million yuan rmb, the project installation cost is 20 millon yuan rmb, the equipment and instrument cost is 7 million yuan rmb, the capital for the foundation current funds is 3 million yuan rmb

    投資預算:總投資3000萬元人民幣,安裝工程費2000萬元人民幣,設備工器具購置費700萬元人民幣,鋪底流動資金300萬元人民幣。
  18. The budget of the investment : the total investment capital is 14. 5 million yuan rmb, the construction cost is 9. 5 million yuan rmb, the investment of equipment fixing is 1 million yuan rmb, the cost for purchasing the equipment and tools is 1 million yuan rmb, the other costs are is 2 million yuan rmb, the current fund is 1 million yuan, the self capital is 4. 5 million yuan rmb and the capital importation is 10 million yuan rmb

    投資預算:總投資1450萬元人民幣,建築工程費950萬元人民幣,安裝工程費100萬元人民幣,設備工器具購置費100萬元人民幣,其他費用200萬元人民幣,鋪底流動資金100萬元人民幣,其中自有資金450萬元人民幣,引進資金1000萬元人民幣。
  19. The soil color changed from dark brown to grey brown, at the bottom layer 4 pillar cavity structures were uncovered. the pillar - cavity structure close to the north wall had signs of cement covering and the areas nearby there were signs of scratch marks from excavators

    土色由深褐轉灰褐色,層出現四個柱洞結構,近北墻的一個柱洞周圍甚至有以水泥鋪底的現象,附近並且有四爪怪手抓痕。
  20. Under the bed lies a sleeping cat

    鋪底下躺著一隻正在睡覺的貓。
分享友人