Excavations and trenches - slopes, planking and strutting, breadths of working spaces
坑道和溝渠.工作空間的坡度鋪板和支承柱寬度Operation platform : all the frames on construction layer and shuttering layer below without backout will be put with scaffolding plank as construction work platform
3操作平臺:施工層及下面相鄰未拆模板層每步架上均滿鋪腳手板做為施工操作平臺。9 individuals shall not work on scaffolding, which is covered with ice or snow, unless all ice or snow is removed and planking is covered with antiskid material to prevent slipping
人員不得在覆蓋著冰雪的腳手架上工作,除非所有的冰或雪均被清除並在鋪板上覆蓋防滑材料以防人員滑倒。2 lay down plywood of thickness 9mm above the wooden frame
2 、在木櫳骨上鋪釘9m / m夾板或細木工板,作為副地板。Workmanship on building sites - code of practice for slating and tiling of roofs and claddings
建築工地操作工藝.第6部分:屋頂鋪石板瓦蓋瓦和覆層的實用規程Extruded concrete curb technology was introduced in 20th congress icold held in beijing in year 2000, this method draw more attention for its improving the compaction of transition material, excellent performance of slope protection, and convenient construction. this extruded concrete curb technology was developed in ita dam construction in brazil, the ita method consists of building and extruded concrete curb by using an extruding machine before the construction of a layer of the transition material, then spread and level the transition material in layers inside the curb, and compact the layer by vib ' ratory roller horizontally
巴西工程界在埃塔( ita )面板堆石壩建設中,借鑒道路園林工程中道沿機的擠壓滑模原理,創造性使用邊墻施工法,在每填築一層墊層料之前,用擠壓式邊墻機製作出一個半透水混凝土小墻,然後在其內側按設計鋪填壩料,用振動碾平面碾壓,合格后重復以上工序。The author in this paper, based on the highway of hubei province and a lot of investigations, combined by the experiment construction, tests the strain and vibrancy wave form of the bride deck pavement under the static and dynamic load, and presents fundamental damaging reason of the bridge decks combined by fem analysis
橋面損壞現象在我國普遍存在,論文立足湖北省,在大量調查研究的基礎上,結合實體工程,對鋪裝層靜、動載作用下產生的應變和振動波形進行測試,並結合有限元法計算與分析,揭示了橋面板損壞的根本原因。Chapter one summarizes the main content and the significance of the research ; chapter two introduces pci bus and 1553b bus in detail ; chapter three gives a general presentation of the design principle and introduces the pci bus interface chip s5920 and 1553b bus protocol chip bu - 61580 in detail, which make a basis for the hardware and e software design in the following chapters ; chapter four shows how to design the board " s hardware by using pci bus interface chip s5920 and 1553b bus protocol chip bu - 61580 ; chapter five deals with the concept and design method of vxd ( virtual device driver ), as well as the communication method between the user " s application and the device driver ; the last chapter, chapter six mainly puts forward some suggestions on how to improve the system
在第一章概述了本文的主要研究內容以及本課題的意義所在;在第二章分別詳細介紹了pci總線和1553b總線,在第三章從總體上介紹了系統的設計思路並分別詳細介紹了pci總線介面晶元s5920和1553b總線協議晶元bu - 61580 ,這些內容為第四章硬體設計和第五章軟體設計作了鋪墊;在第四章具體說明了如何利用pci總線介面晶元s5920和1553b總線協議晶元bu - 61580來進行介面板的硬體設計;在第五章說明了虛擬設備驅動程序( vxd )的概念和設計方法,同時也介紹了用戶應用程序的設計過程及其與驅動程序間的通訊方法;在最後一章總結了本文的工作並對本設計的改進工作提出了幾點建議。In view of the technical problems of softening of foundation soil and reduction of bearing capacity of the breakwater under the action of repeated wave loads during the execution of the second phase of the deepwater waterway regulation project in the changjiang estuary, tianjin port construction corporation has successfully developed safer, higher quality and highly efficient technology and special - purpose marine craft and machinery for laying deepwater sand blankets and offshore installation of prefabricated drains, which were more suitable for the working conditions in the changjiang estuary, and has also explored the construction technology for prefabrication of caissons with rubber anti - sliding plates, to ensure the efficient implementation of the engineering measures against softening of foundation soil
摘要針對長江口深水航道治理二期工程施工過程中遇到的堤身在波浪重復荷載作用下地基土出現軟化、承載力降低的技術難題,第一航務工程局成功開發了適合長江口工況的安全、優質、高效的深水砂被鋪設和海上塑料排水板打設施工工藝及專用船機設備,探索了一整套帶橡膠阻滑板的沉箱預制施工工藝,確保了抗軟化工程措施的有效實施。Don ' t lean upon on the electric sheets and workpieces when sweating. in damp working place, the ground should be covered by rubber sheets or other insulating materials
身體出汗后,切勿靠在帶電的鋼板或工件上,以防觸電。工作地點潮濕時,地面應鋪有橡膠板或其他絕緣材料。Don ' t lean upon on the electric sheets or workpieces when you have a sweet. in damp working places, the ground should be covered by rubber sheets or other insulating materials
身體出汗后,切勿靠在帶電的鋼板或工件上,以防觸電。工作地點潮濕時,地面應鋪有橡膠板或其他絕緣材料。Don ' t lean upon on the electric sheets and workpieces when you have a sweet. in damp working places, the ground should be covered by rubber sheets or other insulating materials
身體出汗后,切勿靠在帶電的鋼板或工件上,以防觸電。工作地點潮濕時,地面應鋪有橡膠板或其他絕緣材料。分享友人