鋪鐵路 的英文怎麼說

中文拼音 [tiě]
鋪鐵路 英文
railroad
  • : 鋪名詞1. (鋪子; 商店) shop; store 2. (用板子搭的床) plank bed3. (舊時的驛站, 現多用於地名) post (often used in place names)
  • : Ⅰ名詞1 (金屬元素) iron (fe) 2 (指刀槍等) arms; weapon 3 (姓氏) a surname Ⅱ形容詞1 (形容...
  • : 1 (道路) road; way; path 2 (路程) journey; distance 3 (途徑; 門路) way; means 4 (條理) se...
  • 鐵路 : railway; railroad; rail
  1. With the continuous development of the length of the highway and road between cities, the number of high - level sleeper buses and trains berth comparts is also rise. with the economic development and the improvement of people ' s life, the comfort of sleeper coaches is demanded to improve. because the passengers lie on the bus berths, it is different with the standing and seated position

    隨著高速公通車里程和城市間道的不斷增長以及客運的高速發展,對高檔公客車和客車位的需求增加;同時由於我國經濟的迅猛發展和人民生活水平的提高,使得人們對臥客車的乘臥舒適性的要求越來越高。
  2. Article 47 it shall be prohibited to install a level crossing or a pedestrian cross - walk without proper authorization

    第四十七條禁止擅自在設平交道口和人行過道。
  3. Our ancestors embraced the idea with the opening of trading routes, the building of canals and steamships, and the laying of railway lines and telegraph cables

    我們的祖先開拓貿易線建設運河與輪船與電纜,體現了全球化的概念。
  4. Coarse gravel or crushed rock laid to form a bed for roads or railroads

    道碴用來基的粗砂礫或碎石
  5. A great amount of post tensioned pre - stressing concrete single box beam for double track ( as called the box beam hereinafter ) has been used on the line. it is of infeasibility in adoption of the traditional practice of pre - fabrication in precast factory and erection of the box beam with the track laying machine for that this type of beam is characterized by new structure, complicated workmanship, large volume and difficulty in transportation. therefore, the key and hardest problem to tackle is that what processing should be adopted to precast the box beam on site and that what kind of machinery should be used to transport and erect the box beam

    由於該型梁具有結構新、工藝復雜、體積大、運輸困難,將常規的橋梁廠製造橋梁、經過運梁到工地、邊邊架進行橋梁製造與架設的傳統施工模式應用到該線是行不通的,必須在現場預制橋梁、並採用專門的運架梁設備進行橋梁架設,因此箱梁的製造、架設施工成為該線施工技術攻關的重點和難點。
  6. We manufacture abrasion - resistant products concrete mixers, asphalt mixers, pavers as well as for the road, railway, metallurgy, electricity and crushing industries

    主要為進口、國產混凝土攪拌機(樓) ,瀝青拌和機、攤機、廠拌機以及公、冶金、礦山、電力、化工業、粉碎業等配套生產耐磨材料。
  7. Setting technique of waterproof plate for electrification railway tunnel

    電氣化隧道防水板設技術
  8. The year 1973 saw the start of a modernisation programme, including the double tracking and electrification of the railway

    一九七三年九廣展開現代化計劃,包括設雙軌和進行電氣化。
  9. The workers were relocating the tracks when the train ran into the work site at 8 : 48 p. m. on wednesday in the anqiu city of shandong province

    火車沖進位於山東省安丘縣工地時間為星期三晚上8點48分,當時工人正在重新
  10. Cisco was reached at seven in the morning ; and an hour later the dormitory was transformed into an ordinary car, and the travellers could observe the picturesque beauties of the mountain region through which they were steaming

    一小時之後,車上的臥又變成了普通的坐椅。旅客們可以透過玻璃窗盡情閱覽這山區的美景。這里的線是順著西埃拉山脈崎嶇的山勢設的。
  11. The results of experiments analysis data put also up some reference to establish the chinese national standard " comfort evaluation of human exposure to whole - body vibration in recumbent position " ( gb / t 18368 - 2001 ) and auto trade standard " the tests method of sleeper buses ride comfort with random input " in light of the correlate national standard and auto trade standard, the vibration tests data of buses and trains were studied

    試驗數據分析結果為制定國家標準「臥姿人體全身振動舒適性的評價」 ( gb t18368 - 2001 )和汽車行業標準「臥客車平順性隨機輸入行駛試驗方法」 ( qc t677 - 2001 )提供了科學依據。依據相關國家標準和汽車行業標準,對公的臥客車臥姿乘客振動試驗數據作了進一步分析。
  12. Xuzhou quanxing electrical carbon co. ltd is located in peixian county, the birthplace of the ancient han culture with the scenic weishan lake lying on the east. the freeway between lanzhou and lianyungang and the one between beinjing and shanghai exploit the breadth of mind we face the world. the geographical advantage lays a successful road for walking up the future

    徐州全興電碳製品有限公司座落於漢文化的發祥地,江蘇省徐州市沛縣境內,東臨風景秀麗的微山湖,隴海和京滬的便捷大道開拓了我們面向世界的心胸;得天獨厚的地理優勢為我們走向末來設了成功之
  13. All the way along the line, from the border right up to peking, as far as the eye could see, the countryside was literally covered up with a green carpet of growing crops, holding a promise of bumper harvests

    從邊境到北京,一上沿線極目縱觀,但見農村到處是茁壯的莊稼,彷佛上一塊綠地毯,這說明豐收在望了。
  14. In nov. 1921, the line from gejiu to caotu was opened. oct. 1928, the branch line from jijie to linan was opened and this line was extended to shibing at oct. 1934. these railway lines were called the gebishi railroad

    公司得到設和礦採的權利,可是因修建資金不足,推退到1915年才開工, 1921年11月完成了個舊經由雞街蒙自到草壩長72 . 2公里的
  15. The combination of the calculation method of virtual confined segment with the computer simulation system for making train diagram can effectively solve the problem of calculating the capacity of passenger train dominated single - track railway. at the same time, the solution has a guiding significance for evaluating the capacities of both passenger and cargo trains of single - track railway in plan as well as evaluating the operational coordination of both passenger and cargo trains

    虛擬限制區間計演算法和計算機模擬畫系統的結合有效的解決了以客運為主的單線通過能力計算問題,對于合理評估計劃修建的單線的客貨運通過能力、客貨運輸組織的協調性具有指導意義。
  16. They are laying a railroad track

    他們正在設一條軌道。
  17. Railway fixed equipments and rolling stock. safety cable work and connection. part 0 : general

    固定設備和機車車輛.安全設電纜和連接.第0部分:通則
  18. Railway fixed equipment and rolling stock. safety cablework and connection. part 1 : safe criterion

    固定設備和機車車輛.安全設電纜和連接.第1部分:安全準則
  19. Railway fixed equipment and rolling stock. safety cablework and connection. part 5 : electrical criterion

    固定設備和機車車輛.安全設電纜和連接.第5部分:電氣準則
  20. Railway fixed equipments and rolling stock. safety cablework and connection. part 4 : mechanical criterion

    固定設備和機車車輛.安全設電纜和連接.第4部分:機械準則
分享友人