鋼吊架 的英文怎麼說

中文拼音 [gāngdiàojià]
鋼吊架 英文
steel hanger
  • : 鋼名詞(鐵和碳的合金) steel
  • : hangsuspend
  • : Ⅰ名詞1 (用來放置東西或支撐物體等的東西; 架子) frame; rack; shelf; stand 2 (毆打; 爭吵) fight;...
  1. For reinforcement concrete corbel with the shear span to depth ratio ( a / ho ) less than 1, has its performance of mechanics that is close to cantilever deep beams, it is an important kind of components in architectural structure which sustains roof trusses, brackets, tray " beams, frame " beams, wall " beams and crane " beams

    剪跨比a h _ 0 1的短筋混凝土牛腿,其受力性能接近於懸臂深梁,在建築結構中是支承屋、屋面梁、托、托梁、框梁、墻梁和車梁等的重要構件。
  2. Fourth, the paper treats two kinds of hoisting projects of high alititude construction in bulk and member assembly, hositing machine and plan layout, setting up scaffold and joints, and installing trunks, branches and joints etc. then in detail discusses the method which applys total station to measure three - dimensional coordinate of dendriform structure, including selecting survey sign points, creating survey system and converting survey coordinate system etc. the paper also deep research on the welding performance, welding method, welding process, welding stress and control, welding strain and rectification, weld defects analysis and weld quality inspection, and so on complicated heterogeneity steel weld proplems

    接著系統的論述了高空散裝法和分單元安裝法兩種樹狀結構裝方案,樹狀結構裝機械及平面布置,樹狀結構胎及節點的搭設,以及樹狀結構樹干、樹枝和節點的裝工藝等諸多工藝問題。詳細的論述了採用全站儀對樹狀結構進行空間三維坐標測量的方法,包括測量標志點的選取、測量系統的建立及測量坐標的轉換等問題。深入地研究了樹狀結構可焊性、焊接方法、焊接工藝、焊接應力及控制、焊接變形及矯正、焊接缺陷分析及焊接質量檢查等復雜的異種焊接問題。
  3. The jdf - 2 type case hanging basket guards against automatically falls mainly uses in the direct motor drive hoisting mechanical well type case hanging basket, as the type case hanging basket using of safekeeping of security, it installs in the hanging basket crossbeam both sides, along including guide rail is rising and falling, when the motor drive type case hanging basket in the fluctuation process, meets overweight, overspeed, steel wire attrition and other reasons creates the hoisting cable or the junction device snaps suddenly, when under hanging basket weightlessness falls, guards against falls can automatic brake, thus achieved avoids falling the basket to offend somebody

    Jdf - 2型井字籃自動防墜器主要用於由電動機驅動的卷揚機井字籃,作為井字籃的安全保護之用,它安裝在籃橫梁的兩側,沿含著導軌升降,當由電動機驅動的井字籃在升降過程中,遇超重超速絲繩磨損等原因而造成提升絲繩或連接裝置突然破斷,籃失重下墜時,防墜器能自動剎車,從而達到避免墜籃傷人重大事故發生的目的。
  4. Company " ziyun " trademark for household a series of racks, hangers series, a series of anti - skid pad, a series of washing, seasoning series, a series of strong clip, a series of steel - plastic chairs, a series of hamstring and chairs were all petty good quality, aesthetics, durability, and exquisite packaging and reasonable price, which deeply users

    公司生產「紫雲」商標的家庭日用品有衣系列、系列、防滑墊系列、洗滌系列、調味系列、強力夾系列、塑椅系列、牛筋椅系列及各種小商品均質量上乘、美觀耐用、包裝精美、價格合理,深受廣大用戶歡迎。
  5. The top end bracket shall be fitted with a stainless steel lifting bail and shall be capable of supporting the combined weight of the pump and motor

    頂部尾軸承應該配置不銹環,應該能夠支撐泵和電機的總重量的壓力。
  6. Beginning to erect no. 1 boiler steel structure on nov. 15, 1995. beginning to erect no. 2 boiler steel structure on jan. 18, 1996

    4 1995年11月15日1號爐, 1號機開始安裝。
  7. Considering special form of the boiler frame, the reconstruction and enforcement method, in addition dynamic analysis are given by particular steps : establishment of the model of boiler steel frame, determination of earthquake loads and distribution form, and anti - side force system for the frame to model and analyze, involving loads on the frame and above it, earthquake loads, damping, sway control installation, hanging bar and plate beam

    考慮鍋爐構結構的特殊形式,研究並提出了電站鍋爐結構改造加固研究方法,及動力分析的具體步驟:建立了鍋爐結構動力分析模型、地震荷載分析方法、建立了鍋爐結構布置型式、及整個鍋爐抗側力體系模擬分析方法。具體包括:本體及構上荷載、地震載荷與阻尼系數確定、制晃裝置確定、桿與大板梁簡化。
  8. Main products are as follows : sanitary ware sprinkler series, alloy sprinkler, stainless steel sprinkler, plastic plating sprinkler, toilet brush series ; paper holder, oil bottle stopper ( stainless steel with natural cork, synthesizing cork and plastic stopper ), sealable tank iron ring, gum ring, plastic cover series, hanging dish holder ( big & small ) series ; alloy, stainless steel, plastic fruit dish hanger series ; alloy jewelry ring series ; wood dinnerware, eggbeater, wood pi, wood spoon series ; coin can castor basal plug, water jar tap and magnet etc fittings that ceramics need

    主要產品:潔具噴頭系列、合金噴頭、不銹噴頭、塑料電鍍噴頭、馬桶刷系列;紙巾、油瓶塞系列(不銹帶天然軟木塞、合成軟木塞、塑膠塞) 、密封罐鐵圈、膠圈、塑料蓋系列、掛盤(大小)系列;合金、不銹、塑料水果盤系列;合金首飾圈系列、木餐具、打蛋器、木批、木匙系列;錢簡罐味具底塞系列、冷水瓶水龍頭、磁鐵等陶瓷所需系列配件。
  9. Based on practical project of inspecting, appraising and reinforcing a main heavy factory building, especially its steel crane girder system, of the second steel mill belonging to taiyuan steel & iron corporation, whose technology renovation leads to increase tonnage of many heavy cranes and vertical load of frame - bent structure, first the structure and its members were investigated, inspected, calculated and analyzed, and their reliability was appraised respectively and the strengthening projects or the measures to remedy were given. then, in accordance with the requirement to strengthen the girders under non - stop production, the feasibility of strengthening the crane girders by adding steel diagonal braces underneath the existing girders has been studied by inspecting and evaluating the strengthening effect of the crane girders and comparing with other reinforcing scheme

    本文結合太(集團)有限公司第二煉廠主廠房由於生產工藝改造要求,加大多臺重型車噸位及bc跨( 1 ) ( 8 )軸線框排各層豎向(設備)荷載后,對廠房結構,尤其車梁系統進行檢測鑒定與加固設計的實際工程,首先對廠房結構進行了現場調研、技術檢查、測試以及內力和承載能力的計算與分析(考慮抗震) ,並根據檢測、計算與分析結果,對廠房結構、構件的可靠性進行了評定,並綜合提出鑒定結論和加固處理建議。
  10. After an introduction to the research on the software for the design of the variant steel arched girder construction, the creation of the structural model, the structure of the supporting seat, the design of the variant arched girder, and the measures taken to ensure the stability of the plane surface of the arched girder, the thesis goes to study the methods for the hoisting and the angle setting of the long - span arched girders, as well as the bolting of the axle pin in the hinge support

    論文首先對變異結構設計可採用的軟體、結構模型的建立、支座構造形式、變異拱梁的設計,以及保證拱梁平面外穩定所採取的措施等進行了研究,然後研究了大跨度變異弧形梁裝、角度的調整、鉸支座穿軸銷等的施工方法,最後對施工完成後的位移進行了實際量測。
  11. Referring to some type of the structure such as plane truss, grid truss and grid shell, the author dissertates the common construction technique including whole installation, integral propping up, integral lifting, high altitude construction in bulk, member assembly and sliding construction

    結合大跨度結構的各種形式,如平面桁、網、網殼等,概要的論述了其一般的施工方法、工藝和技術要點,包括整體裝法、整體頂升法、整體提升法、高空散裝法、分單元裝法和高空滑移法。
  12. The main suspension gallows consist of a steel box beam, sitting on hydraulic jacks that support all the structure during concreting

    有一箱梁組成,坐落在液壓千斤頂上,在澆注混凝土過程中支撐所有結構。
  13. Fabrication of the box beam is divided into such parts as reinforcement, formwork, concreting, prestressing, moving and storing of beam, pipe grouting under pressure, end sealing of the beam, water - proof layer on the bridge surface system, protective coating etc. the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects, such technologies as : manufacturing and fixing of reinforcement, steel reinforcement fixing baseplate, web plate and top plate respectively and lifting the steel skeleton into form, requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork, optimization of concrete ratio, concrete pouring process of two ends of beam in priority over the middle, in sequence of first baseplate followed by web plate and top plate at last, concrete pouring in inclined section and in horizontal layer, concrete vibration mainly by external vibrator in assistance with internal vibrator, methods and regulation for steam curing of concrete, dual controls over stress and strain to ensure quality of prestressing workmanship, construction method of effective beam moving by heavy - weight special moving facility, some regulations and key notes about construction of grouting under pressure, beam ends sealing, water - proof layer on the bridge surface system, protective coating

    箱梁製造由筋工程、模板工程、混凝土工程、預應力工程、移存梁工程、孔道壓漿工程、梁體封端工程、橋面防水層和保護層工程等施工環節組成。文中介紹的採用胎具製作和綁扎筋,分底腹板和頂板分別綁扎並筋骨入模;拆裝式和液壓式兩種模板的設計、製作要求和使用方法;綜合考慮、優化混凝土配合比,混凝土灌注從兩端至中間、先底板、后腹板、再頂板的施工順序和斜向分段、腹板水平分層、附著式振搗為主、插入式搗固為輔的施工工藝,蒸汽養護的方法和規定;應力應變雙控制確保預應力施工質量的施工技術;採用重物移運器有效移梁的施工方法;壓漿、封端、橋面防水層和保護層施工的一些規定和注意事項等都是對箱梁製造行之有效的施工技術和施工方法,並可為以後類似施工作借鑒。
  14. Firstly, the steel frame is generally investigated and inspected, including the surface status, distortion, strain of the crane - beam, horizontal load and wheel - stress of the crane, dynamic characteristic and reaction of tne frame, so on. in this way. the particular status and characteristic of this kind of steel frame are mastered

    首先,對進行了全面的調查和檢測,包括的外觀狀況、變形、車梁應變、車輪壓和水平荷載、框動力特性和動力反應等,掌握了該類在實際使用過程中的具體特性和狀況,並提出車輪壓和水平荷載的測試方案和推斷方法。
  15. The hanging pedestal uses full extention steel slide rail which can support at least 50 lbs. hanging files rack for f4 size paper is being equipped inside the lowest drawer

    抽屜櫃用三截路軌,可承重量不少於50磅,而最低的抽屜內更設置f4紙掛檔案
  16. Thirdly, in term of the results of testing and calculation, the displacement and libration, the difference of altitude, the flexibility and strain of crane - beams are all generally analysed, especially the reason why the crane - beams are attaint is lucubrated, and the reasons why the trigging pole is ruptured, the upper wingspan is damaged, the orbital movement, the exceptional incline of colums are open out, which has instructional significances that improve the design of the steel frame of the coke made by dry flameout

    第三,根據檢測和計算結果,對的位移和振動、框高差、車梁撓度和應變等進行了全面的分析,特別對車梁系統的損傷原因進行了深入分析,揭示了制動桿件斷裂、上翼緣磨損、軌道竄動、柱異常傾斜等一系列損傷現象的原因,對于改進干熄焦的設計有著直接的指導意義。
  17. The paper describes the main techniques in the integral sliding construction for large span structure, which includes jacking scheme, plan layout, assembly, transport and stacking of components, setting of sliding system, setting of track, conformation of falsework, traction facility etc. discusses emphatically the sliding falsework, which includes the material, conformation, manufacture, welding and assembling of the shape steel tape falsework

    系統分析了大跨度整體滑移施工中的起重裝機具的選擇與布置、施工平面布置、桁結構拼裝單元及滑移單元劃分、滑移施工方案及工藝流程、桁的連接、拼裝運輸、及堆放、滑移軌道布置、滑移滾輪構造、延伸平臺布置以及滑移牽引系統等諸多工藝問題。
  18. The fatigue strength of bottom chord node board, which is sensitivity to fatigue, is calculated by fem method

    在此基礎上,確定了節點板疲勞計算應力。之後,對車橋的下弦節點板進行了疲勞強度驗算。
  19. A certain crane truss girder is analyzed by fem method, and the results of fem are compared with the test results

    利用有限元方法對某車行節點極進行了計算分析,並與現場實測應力結果進行對比。
  20. Standard specification for zinc - coated steel strand for messenger support of figure 8 cable

    8字型纜用鍍鋅絞線的標準規范