鋼板樁基 的英文怎麼說

中文拼音 [gāngbǎnzhuāng]
鋼板樁基 英文
steel sheet piling
  • : 鋼名詞(鐵和碳的合金) steel
  • : Ⅰ名詞1 (片狀硬物體) board; plank; plate 2 (專指店鋪的門板) shutter 3 [音樂] (打拍子的樂器) ...
  • : Ⅰ名詞(樁子) pile; pole; stake Ⅱ量詞(用於事情)
  • 鋼板 : [冶金學]1 (板狀鋼材) steel plate; nickelclad steel sheet; plate 2 (汽車上的片狀彈簧) spring3 ...
  1. Secondly, this paper made some theoretic researches on its engineering classfication and applicable scope for this technology ; then combining with project example, this paper carried out scheme design for this technology, and compared some different kinds of underpinning scheme and node and structure design, and put forward the method of " reinforcce steel bar through column " to build pile cap beam, " resistant bend and shear anchored reinforce steel bar " to strengthen column consolidation effect, and the method of " steel plate hoop " to build reinforcing bar connection of the foundation beam, etc. in the process of the consturction scheme research and implement, this paper synthetically elaborated the organizaton for project construction, put forward the construction technical measure of specific aim on the artificial pile, and pile cap beam, and underground adding layer and structure stabilization, and overall structure stabilization and so on. for this project, adopt reinforcing bar concrete to brace hole wall to ensure the safety of engineering in the artificial pile construction, use flexible connection catch to make the cage hoisting easier to simplify the construction process, use the method of earthwork statified symmetrical balance in the process of underground adding layer excavation

    本文首先對于礎托換與結構加固技術的目的和意義、國內外發展狀況進行了綜合闡述;其次對該項技術工程分類及適應范圍進行了理論上的分析研究;然後結合工程實例對該項技術進行了方案設計,對比幾種不同的托換方案和節點及構造設計,提出了「通筋穿柱法」做承臺梁, 「抗彎抗剪錨筋法」強化柱加固效果, 「箍法」做地筋連接點等多項技術;在施工方案的研究和實施過程中,對于工程施工組織進行綜合闡述,並就人工挖孔、承臺梁、地下加層及結構加固、整體結構穩定等專項施工方案提出有針對性的施工技術措施,人工挖孔施工採用筋砼護壁確保挖孔的安全成型,使用柔性連接鉤進行筋籠吊裝簡化施工工序;承臺梁施工採用梁主筋橫穿柱身化學膠錨固等;地下加層綜合施工技術採用土方分層對稱平衡開挖,分段挖土做筏結構自穩等;最後對于該工程實施后的效果分析,說明該項綜合施工技術的可行性。
  2. The pouring anchor and shot concrete as used from the middle of 1950 " s, while the technology of anchorage, which was used as foundation support was popular in europe in i960 " s, and this method was used to strengthen the tunnels " ceilings and support mines from 1970 " s in china

    在我國70年代前已開使在加固隧洞頂、礦山支護等工程中開始使用, 80年代開始應用於深坑支護工程,但也主要是與、灌注、地下連續墻等結合使用,做為支護系統的一種錨固手段取得了良好的效果。
  3. Since the air pressure sink - box technology was abandoned, and the steel - plate peg round the barrage pipe peg foundation was adopted at first time in the wuhan changjiang bridge project, the steel round the barrage has been adopted in bridge foundation construction more and more. especially after the double wall steel sink well round the barrage bore peg foundation was creatively adopted in jiujiang changjiang bridge foundation, which was built in 1985

    自從武漢長江大橋工程中擯棄了過去一直沿用的氣壓沉箱,首次採用了圍堰管柱礎以來, 1985年建成的九江長江大橋礎獨創性地採用雙壁沉井圍堰鉆孔礎,圍堰在橋梁礎施工中的應用越來越多。
  4. Supported by steel sheet pile in deep foundation excavation

    坑支護的應用
  5. The design amp; construction of single - wall steel pile cofferdam in deep water

    深水坑單壁圍堰設計與施工
  6. Application of steel sheet pile cofferdam on excavation of deep water foundation pit

    圍堰在深水坑開挖施工中的應用
  7. Taking the foundation pit engineering of shiji jiayuan as an example, the reinforcement technique that using porous board is proposed, which is combined with anchor nets of slope and steel - pipe pile support structure

    結合世紀家園坑工程,提出了採用粉噴多孔暗撐加固抗隆起技術,與邊坡噴錨網、聯合支護結構相結合。
  8. In order to study soil - structure interaction behavior, the finite element analysis for the strip footing subjected to both vertical and lateral loads, and foundation layer reinforced with sheet pile are considered

    為研究土體構造物的共同作用性能,利用加強的地礎進行了有限元分析。
  9. And in coordination with data obtained from an engineering test on site, the regularities of foundation settlement and the distribution properties of pile reaction, soil reaction and steel stress in raft, of the pile - ( thick ) raft tested are analyzed. in the same time, the calculating results with finite element method almost correspond with measured results

    另外,通過對一超高層建築(厚)筏礎進行原位實測,取得了比較完備的實測資料,分析了礎沉降的特點和頂反力、間土反力和筏筋應力的分佈特點和規律,同時用有限元法進行了近似計算,與實測結果本吻合。
  10. Meanwhile, it does not need a extra time to be carried out. it can continuously work during the excavation of trenches, so whole work cycle can be reduced. anchors and layers of shot concrete have replaced the traditional steel frames and piles, including concrete piles, steel piles, and they can largely economize construction materials, such as steel and concrete, reduce the amount of soil that would be excavated out, and improve work conditions

    錨桿施工機械及設備作業空間小,可為各種地形及場地使用,同時,它不獨占工期,而隨坑開挖同步、流水進行,節約工期;用錨桿及噴射硅面層代替傳統的支撐和(硅) ,能夠大量節省材、硅等建材,減少土方開挖量且能改善施工條件;其次錨桿的預加應力可以通過抗拔實驗來獲得。
分享友人