鋼筋籠 的英文怎麼說

中文拼音 [gāngjīnlóng]
鋼筋籠 英文
cage of reinforcement
  • : 鋼名詞(鐵和碳的合金) steel
  • : 名詞1 (肌的舊稱) muscle2 [口語] (肌腱或骨頭的韌帶) tendon; sinew 3 [口語] (可以看見的皮下靜...
  • : 籠Ⅰ名詞1 (籠子) cage; coop 2 (籠屜) steamer 3 (筐; 籃) basket Ⅱ動詞[方言] (把手放在袖筒里...
  • 鋼筋 : concrete iron; concrete reinforcing bars; rebar; reinforcing bar; reinforced bar; reinforcing ste...
  1. Secondly, this paper made some theoretic researches on its engineering classfication and applicable scope for this technology ; then combining with project example, this paper carried out scheme design for this technology, and compared some different kinds of underpinning scheme and node and structure design, and put forward the method of " reinforcce steel bar through column " to build pile cap beam, " resistant bend and shear anchored reinforce steel bar " to strengthen column consolidation effect, and the method of " steel plate hoop " to build reinforcing bar connection of the foundation beam, etc. in the process of the consturction scheme research and implement, this paper synthetically elaborated the organizaton for project construction, put forward the construction technical measure of specific aim on the artificial pile, and pile cap beam, and underground adding layer and structure stabilization, and overall structure stabilization and so on. for this project, adopt reinforcing bar concrete to brace hole wall to ensure the safety of engineering in the artificial pile construction, use flexible connection catch to make the cage hoisting easier to simplify the construction process, use the method of earthwork statified symmetrical balance in the process of underground adding layer excavation

    本文首先對于基礎托換與結構加固技術的目的和意義、國內外發展狀況進行了綜合闡述;其次對該項技術工程分類及適應范圍進行了理論上的分析研究;然後結合工程實例對該項技術進行了方案設計,對比幾種不同的托換方案和節點及構造設計,提出了「通穿柱法」做承臺梁, 「抗彎抗剪錨法」強化柱加固效果, 「板箍法」做地基梁連接點等多項技術;在施工方案的研究和實施過程中,對于工程施工組織進行綜合闡述,並就人工挖孔樁、承臺梁、地下加層及結構加固、整體結構穩定等專項施工方案提出有針對性的施工技術措施,人工挖孔樁施工採用砼護壁確保挖孔樁的安全成型,使用柔性連接鉤進行鋼筋籠吊裝簡化施工工序;承臺梁施工採用梁主橫穿柱身化學膠錨固等;地下加層綜合施工技術採用土方分層對稱平衡開挖,分段挖土做筏基結構自穩等;最後對于該工程實施后的效果分析,說明該項綜合施工技術的可行性。
  2. Research on the mechanism of soft foundation treatment with reinf orcement grid cage gravel pile and analysis on application examples

    土工格柵鋼筋籠碎石樁軟基加固機理研究及應用實例分析
  3. Abstract : the cause of underwater concrete reinforcing cage up - floating accident is improper operation, such as loose - placement of reinforcing cage, fast - drawing of conduct pipe, improper embedded depth of conduct pipe ; and the poor quality of concrete, for example, the slump, sand percentage, adhesiveness and initial setting time don " t meet requirement

    文摘:水下混凝土澆注鋼筋籠上浮事故的原因是操作不當,如鋼筋籠固定不牢、提升導管過猛、導管埋深不當等,以及混凝土品質差,如坍落度、含砂率、粘聚性、初凝時間等不合要求。
  4. Usage of roll welding machine for hooped reinforcement cage of pile with drilling hole

    鉆孔樁鋼筋籠滾焊機的應用
  5. During the construction of the dam foundation cut - off for dalong water control project, the construction techniques adaptable to the construction under the condition with high interference, short construction period and strict quality standard are selected through the related productive experiment, with which the problems such as the prevention and treatment of hole collapse and lowering steel reinforcement cage and pre - embedded grouting pipe into place are solved, and then the successful construction of the cut - off is guaranteed as well

    摘要在大隆水利樞紐壩基防滲墻施工過程中,通過生產性試驗選擇出了適合該防滲墻工程施工干擾大、工期緊、質量標準高的要求的施工技術,解決好了孔口塌孔的預防、處理及鋼筋籠和預理灌漿管下設等技術難題,保證了該防滲墻工程的成功建設。
  6. Juncture application of coarse screw thread reinforcing steel bar coop of main piers in xigang viaduct

    鐓粗直螺紋接頭在西港高架橋主墩鋼筋籠連接中的應用
  7. The cause of underwater concrete reinforcing cage up - floating accident is improper operation, such as loose - placement of reinforcing cage, fast - drawing of conduct pipe, improper embedded depth of conduct pipe ; and the poor quality of concrete, for example, the slump, sand percentage, adhesiveness and initial setting time don " t meet requirement

    水下混凝土澆注鋼筋籠上浮事故的原因是操作不當,如鋼筋籠固定不牢、提升導管過猛、導管埋深不當等,以及混凝土品質差,如坍落度、含砂率、粘聚性、初凝時間等不合要求。
  8. On the basis of the inspection for pile foundations of a bridge in bangladesh, this paper describes the ultrasonic inspection for a special case of bored pile embedded with sounding pipes in between its double layers of reinforcement cages, analyzes the influential factors of the inspection in such case and also compares the evaluation criteria on the ultrasonic inspection for pile foundations at home and abroad

    摘要結合孟加拉一座橋梁的樁基檢測,闡述了聲測管埋設在雙層鋼筋籠之間這一特殊情況的超聲檢測,對其所受的影響因素進行了分析,進而對國內與國際上的樁基超聲檢測評定標準進行了比較。
  9. Application of inserted reinforcing bar cage after completion of bored pile with long helix in beijing subway construction

    長螺旋成孔壓灌混凝土成樁后插鋼筋籠施工工藝在北京地鐵施工中的應用
  10. Application of post inserted reinforcing steel bar piles in huazheng mansion foundation pit support

    后插鋼筋籠法成樁在華正大廈基坑支護工程中的應用
  11. The constructional technics of post - inserted the steel reinforcement cage in bored pile and associated equipment

    長螺旋鉆機成孔壓灌砼樁后插鋼筋籠施工工藝及配套裝置的應用
  12. The precautions for the underwater concrete reinforcing cage up - floating accident is placing the reinforcing cage in the pile hole center, controlling the embedded depth of conduct pile, concrete casting velocity and conduce pipe drawing velocity, mixing fine quality concrete, adding barbed bar and specialized refincing cage hanger hook

    採用對策是注意保證灌注導管位於鋼筋籠中心,控制導管埋深、灌注速度及提升導管的速度,配製品質好的混凝土,以及採用「倒剌」方法和專用吊鉤等預防措施。
  13. The application of conjunction technique with rolling screw thread shucking out of rib to jointing of reinforcing bar cage

    剝肋滾壓直螺紋連接技術在鋼筋籠對接中的應用
  14. Construction technology of straight threaded coupling of reinforcement cage for bored cast - in - place pile

    鉆孔灌注樁鋼筋籠直螺紋連接施工技術
  15. Construction method of driven cast - in - pi ace pile with later - implanted steel cage

    后植入鋼筋籠灌注樁成樁施工工法的應用
  16. Study of engineering techniques of reinforcing steel bar cage grouting piles

    后植入鋼筋籠灌注樁施工技術的研究
分享友人